Back to kitchen remodel contractors
J C C
- Based in
- Daly City
- On San Francisco permits
- Mar 2010 to Jan 2017
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2017 | Completed final sign-off Apr 2017 | 2563 Clay St | unit 9: replace siding on back of building, 500 sq. ft.; replace kitchen window (revision to 201701046487); replace living room sliding door & window; upgrade living room electrical, add #4 led can lights.Details
unit 9: replace siding on back of building, 500 sq. ft.; replace kitchen window (revision to 201701046487); replace living room sliding door & window; upgrade living room electrical, add #4 led can lights. | $15,000 |
| Jan 4, 2017 | Completed final sign-off Apr 2017 | 2563 Clay St | unit 9: remodel kitchen & bathroomDetails
unit 9: remodel kitchen & bathroom | $20,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 2563 Clay St | unit #5: remodling bathroom and kitchen. no structural work, same layoutDetails
unit #5: remodling bathroom and kitchen. no structural work, same layout | $19,000 |
| Jun 23, 2016 | Completed final sign-off Sep 2016 | 2563 Clay St | unit 1: remodel bathroon & kitchen, no structural work.Details
unit 1: remodel bathroon & kitchen, no structural work. | $15,000 |
| Aug 26, 2014 | Completed final sign-off Sep 2014 | 17 Hill St | bathroom remodel, replace plumbing fixtures, upgrade electrical fan light, combo wall light fixture, gifc remove wall plaster and install drywall; kitchen replace plumbing fixtures, sink and faucet, replace hood fan, electrical install sub panel, replace light fixturesDetails
bathroom remodel, replace plumbing fixtures, upgrade electrical fan light, combo wall light fixture, gifc remove wall plaster and install drywall; kitchen replace plumbing fixtures, sink and faucet, replace hood fan, electrical install sub panel, replace light fixtures | $20,000 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 21 Hill St | unit #17: bathroom remodel, replace plumbing fixtures, upgrade electrical, cffc, remove wall plaster/install drywall, replace kitchen plumbing fixtures, replace hood fan, install sud panel, replace light fixtures.Details
unit #17: bathroom remodel, replace plumbing fixtures, upgrade electrical, cffc, remove wall plaster/install drywall, replace kitchen plumbing fixtures, replace hood fan, install sud panel, replace light fixtures. | $18,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 2563 Clay St | work in unit #8-update electrical, replace bathroom tile & plumbing fixtures. replace (e) cabinets & fixtures in kitchen. replace dry rot window (not visible from street) with window in kind & paint. no drawings.Details
work in unit #8-update electrical, replace bathroom tile & plumbing fixtures. replace (e) cabinets & fixtures in kitchen. replace dry rot window (not visible from street) with window in kind & paint. no drawings. | $9,000 |