Back to bathroom remodel contractors
J C C
- Based in
- Daly City
- On San Francisco permits
- Mar 2010 to Jan 2017
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2017 | Completed final sign-off Apr 2017 | 2563 Clay St | unit 9: remodel kitchen & bathroomDetails
unit 9: remodel kitchen & bathroom | $20,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 2563 Clay St | unit #5: remodling bathroom and kitchen. no structural work, same layoutDetails
unit #5: remodling bathroom and kitchen. no structural work, same layout | $19,000 |
| Jan 6, 2015 | Completed final sign-off Mar 2015 | 542 46th Av | replace shower floor and walls and master bathroom (bathroom remodel). no structural work - no walls removed.Details
replace shower floor and walls and master bathroom (bathroom remodel). no structural work - no walls removed. | $15,000 |
| Aug 26, 2014 | Completed final sign-off Sep 2014 | 17 Hill St | bathroom remodel, replace plumbing fixtures, upgrade electrical fan light, combo wall light fixture, gifc remove wall plaster and install drywall; kitchen replace plumbing fixtures, sink and faucet, replace hood fan, electrical install sub panel, replace light fixturesDetails
bathroom remodel, replace plumbing fixtures, upgrade electrical fan light, combo wall light fixture, gifc remove wall plaster and install drywall; kitchen replace plumbing fixtures, sink and faucet, replace hood fan, electrical install sub panel, replace light fixtures | $20,000 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 21 Hill St | unit #17: bathroom remodel, replace plumbing fixtures, upgrade electrical, cffc, remove wall plaster/install drywall, replace kitchen plumbing fixtures, replace hood fan, install sud panel, replace light fixtures.Details
unit #17: bathroom remodel, replace plumbing fixtures, upgrade electrical, cffc, remove wall plaster/install drywall, replace kitchen plumbing fixtures, replace hood fan, install sud panel, replace light fixtures. | $18,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 21 Hill St | bathroom remodel; to comply with cec(150)k 10. new plumbing fixtures, new light fixtures, 1 gfic, 1 ceiling light, ceiling fan, 1 wall light.Details
bathroom remodel; to comply with cec(150)k 10. new plumbing fixtures, new light fixtures, 1 gfic, 1 ceiling light, ceiling fan, 1 wall light. | $9,037 |
| Mar 13, 2013 | Completed final sign-off May 2013 | 21 Rosemont Pl | remove all fixture of the bathroom, remove plaster off the walls and ceiling, remove tub and under layment floor, install new tub, replace shower fixtures, body valve and shower head, replace light fixtures, body valve and shower head, drywall, tile, shower walls.Details
remove all fixture of the bathroom, remove plaster off the walls and ceiling, remove tub and under layment floor, install new tub, replace shower fixtures, body valve and shower head, replace light fixtures, body valve and shower head, drywall, tile, shower walls. | $5,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 2563 Clay St | work in unit #8-update electrical, replace bathroom tile & plumbing fixtures. replace (e) cabinets & fixtures in kitchen. replace dry rot window (not visible from street) with window in kind & paint. no drawings.Details
work in unit #8-update electrical, replace bathroom tile & plumbing fixtures. replace (e) cabinets & fixtures in kitchen. replace dry rot window (not visible from street) with window in kind & paint. no drawings. | $9,000 |