J B Designs And Installations
- Based in
- San Bruno
- On San Francisco permits
- Feb 2004 to Jan 2018
- Last 24 months
- 0 permits filed
75 permits since 2000: 59 completed, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
38 kitchen remodel permits: 35 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2018 | Completed final sign-off Dec 2018 | 255 Crestmont Dr | kitchen remodel. no structural work. existing floor plan, no changes. install led lights, counter plugs.Details
kitchen remodel. no structural work. existing floor plan, no changes. install led lights, counter plugs. | $38,000 |
| Nov 16, 2016 | Completed final sign-off Mar 2017 | 2350 Hyde St | kitchen remodel. r/r cabinets and counters in-kind. new gfci plugs at counter. install h.e. lighting. no structural work.Details
kitchen remodel. r/r cabinets and counters in-kind. new gfci plugs at counter. install h.e. lighting. no structural work. | $38,000 |
| Nov 13, 2015 | Completed final sign-off Mar 2016 | 890 Foerster St | kitchen remodel. no structural work. replace all cabinets in-kind. install high efficacy led can lights. gfci counter plugs. smoke alarms. co detectors. instal new counter.Details
kitchen remodel. no structural work. replace all cabinets in-kind. install high efficacy led can lights. gfci counter plugs. smoke alarms. co detectors. instal new counter. | $28,000 |
| Oct 8, 2015 | Completed final sign-off Feb 2016 | 163 Shipley St | remodel (e) kitchen, install (3) high efficacy lites, (1) microwave, no structural work, (e) floor plan replacement of all cabinets, counters & appliances. no change w/layout. compliance with maher ordinance no 155-13 not required.Details
remodel (e) kitchen, install (3) high efficacy lites, (1) microwave, no structural work, (e) floor plan replacement of all cabinets, counters & appliances. no change w/layout. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Aug 12, 2015 | Completed final sign-off Mar 2016 | 6645 03rd St | remove kitchen cabinets and counters. replace in kind. no structural work. existing floor plan only. install high efficacy led lights, gfci all counter plugs, install smoke and co2 detectors.Details
remove kitchen cabinets and counters. replace in kind. no structural work. existing floor plan only. install high efficacy led lights, gfci all counter plugs, install smoke and co2 detectors. | $18,000 |
| Aug 12, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | unit #411:remove kitchen and bathroom cabinets and counters. install (replace in kind) all kitchen cabs./counters. no structural work. existing floor plan only. remove bathroom tiled walls. install new valve/body shower tile, new shower. no mechanical in kitc. or bath. install smoke & co2 detect.Details
unit #411:remove kitchen and bathroom cabinets and counters. install (replace in kind) all kitchen cabs./counters. no structural work. existing floor plan only. remove bathroom tiled walls. install new valve/body shower tile, new shower. no mechanical in kitc. or bath. install smoke & co2 detect. | $28,000 |
| May 18, 2015 | Completed final sign-off Jan 2016 | 49 Zoe St | remodel kitchen, no sructural work. existing floor plan only. install new cabinets, counter top, electrical plugs. high efficacy lighting. install sink, garbage disposal, dishwasher. n/a maher ord. # 155-13Details
remodel kitchen, no sructural work. existing floor plan only. install new cabinets, counter top, electrical plugs. high efficacy lighting. install sink, garbage disposal, dishwasher. n/a maher ord. # 155-13 | $32,000 |
| Apr 21, 2014 | Completed final sign-off Mar 2015 | 5072 Diamond Heights Bl | remodel existing kitchen floor plan. no structural work. replace cabinets, counters. gfci receptacles at counters. high efficacy lighting 12 x 12 kitchenDetails
remodel existing kitchen floor plan. no structural work. replace cabinets, counters. gfci receptacles at counters. high efficacy lighting 12 x 12 kitchen | $22,343 |
| Feb 27, 2014 | Completed final sign-off Feb 2015 | 185 Majestic Av | kitchen remodel at 2nd floor - remove cabinets & counters, install new plugs & switches, hook up sink & dishwasher. install high efficacy lighting, install gfci at counter plug locations, remodel existing floor plan only, no structural work.Details
kitchen remodel at 2nd floor - remove cabinets & counters, install new plugs & switches, hook up sink & dishwasher. install high efficacy lighting, install gfci at counter plug locations, remodel existing floor plan only, no structural work. | $15,000 |
| Dec 11, 2013 | Completed final sign-off Nov 2014 | 612 Clarendon Av | remodel existing kitchen new counter plugs. relocate existing hot & cold supply lines. no structural work install new sheetrok, cabinets, counters. no plans. lighting to comply with cec 150 (k)Details
remodel existing kitchen new counter plugs. relocate existing hot & cold supply lines. no structural work install new sheetrok, cabinets, counters. no plans. lighting to comply with cec 150 (k) | $28,000 |
| Oct 8, 2013 | Completed final sign-off Dec 2013 | 293 Church St | romodel kitchen: remove counters and cabinets install gfci receptacles, one new plug. install sink and garbage disposal. install new countertops. install high efficacy light at existing fixture location. no plans, no structural work. partial remodel 6 cabinets replacedDetails
romodel kitchen: remove counters and cabinets install gfci receptacles, one new plug. install sink and garbage disposal. install new countertops. install high efficacy light at existing fixture location. no plans, no structural work. partial remodel 6 cabinets replaced | $10,000 |
| Sep 20, 2013 | Completed final sign-off Sep 2014 | 344 Roosevelt Wy | demolish existing kitchen new wired counter plugs/switches remodel kitchen sink waste line. install cabinets, counter, sink, high efficacy lites gfi plugs at all counter locations. lighting to comply with cec 150(k)Details
demolish existing kitchen new wired counter plugs/switches remodel kitchen sink waste line. install cabinets, counter, sink, high efficacy lites gfi plugs at all counter locations. lighting to comply with cec 150(k) | $25,000 |
| May 29, 2013 | Completed final sign-off May 2014 | 350 Pioche St | install new cabinets,counters, lites and plugs, sheetrock and insulation. all lites high efficacy led. all new work in kitchen.Details
install new cabinets,counters, lites and plugs, sheetrock and insulation. all lites high efficacy led. all new work in kitchen. | $25,000 |
| Feb 28, 2013 | Completed final sign-off Jun 2013 | 50 Hearst Av | demo existing kitchen install new high efficacy lights, counter plugs, lower waste arm, new sheetrock cabinets and counter tops, windows not in bedroomDetails
demo existing kitchen install new high efficacy lights, counter plugs, lower waste arm, new sheetrock cabinets and counter tops, windows not in bedroom | $25,000 |
| Dec 17, 2012 | Completed final sign-off Apr 2013 | 717 Moraga St | remove (e) cabinets and counter. install high efficacy lites. relocate electric panel, install new cabinets and counter. hook up sink, dishwasher, garbage disposer. 1 kitchen lighitng to comply with cfc 150(k)Details
remove (e) cabinets and counter. install high efficacy lites. relocate electric panel, install new cabinets and counter. hook up sink, dishwasher, garbage disposer. 1 kitchen lighitng to comply with cfc 150(k) | $10,000 |
| Feb 6, 2012 | Completed final sign-off Jan 2013 | 1922 Powell St | demolish existing cabinets and counters, install new coutner plugs and high efficacy lights, install one new valve for gas, install new cabinets, counter, appliances, sheetrock and insulate. kitchen remodelDetails
demolish existing cabinets and counters, install new coutner plugs and high efficacy lights, install one new valve for gas, install new cabinets, counter, appliances, sheetrock and insulate. kitchen remodel | $22,500 |
| Nov 15, 2011 | Completed final sign-off Feb 2012 | 1235 Fitzgerald Av | kitchen remodel; no structural work. remove sink, base counter & sink. install 6-(n) cabinets, tile wall, install sink & garbage disposal.Details
kitchen remodel; no structural work. remove sink, base counter & sink. install 6-(n) cabinets, tile wall, install sink & garbage disposal. | $8,000 |
| Sep 6, 2011 | Completed final sign-off Feb 2012 | 4150 17th St | demolition of existing kitchen. install new high efficiency lights, cabinets, counter tops, sink and faucet. no structural work. lighting to comply with cec 150 (k).Details
demolition of existing kitchen. install new high efficiency lights, cabinets, counter tops, sink and faucet. no structural work. lighting to comply with cec 150 (k). | $22,000 |
| Sep 6, 2011 | Completed final sign-off Jan 2012 | 3009 Webster St | demolition of existing kitchen. install new high efficiency lights, cabinets, counter sink and faucet. no structural work. all (n) lighting must comply with cec 150 (k).Details
demolition of existing kitchen. install new high efficiency lights, cabinets, counter sink and faucet. no structural work. all (n) lighting must comply with cec 150 (k). | $25,000 |
| Aug 12, 2011 | Completed final sign-off Oct 2011 | 3529 21st St | demo existing kitchen cabinet, install three new plugs, appliances, sink, new countertop, no strucvtural work, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy - cec 150(k)8.Details
demo existing kitchen cabinet, install three new plugs, appliances, sink, new countertop, no strucvtural work, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy - cec 150(k)8. | $18,500 |
| Jun 23, 2011 | Completed final sign-off Feb 2012 | 2515 Chestnut St | demo extg kitchen. install electrical plug & switches 2 led lights, sheetrock and insulate. install new cabinets. hook up utilities and install new appliances. no structural work.use extg roof vent. lighting to comply with cec 150 k. no change to walls windows doors.Details
demo extg kitchen. install electrical plug & switches 2 led lights, sheetrock and insulate. install new cabinets. hook up utilities and install new appliances. no structural work.use extg roof vent. lighting to comply with cec 150 k. no change to walls windows doors. | $20,000 |
| Jun 23, 2011 | Completed final sign-off Mar 2012 | 33 Caire Tr | demo extg kitchen. install one lite high efficacy, 3 plug, sheetrock and install new cabinets and counter tops. install new appliances. no structural work. no mechanical. lighting to comply with cec 150 k. no change to walls windows doors.Details
demo extg kitchen. install one lite high efficacy, 3 plug, sheetrock and install new cabinets and counter tops. install new appliances. no structural work. no mechanical. lighting to comply with cec 150 k. no change to walls windows doors. | $10,000 |
| Jun 23, 2011 | Completed final sign-off Jan 2012 | 11 Littlefield Tr | remove extg cabinets, install new cabinets and counter tops and aplliances. install 2 plugs. no structural work. no mechanical. no change to walls windows doors.1 kitchen lighting to comply with cec 150 k.Details
remove extg cabinets, install new cabinets and counter tops and aplliances. install 2 plugs. no structural work. no mechanical. no change to walls windows doors.1 kitchen lighting to comply with cec 150 k. | $10,000 |
| Mar 8, 2011 | Completed final sign-off Apr 2011 | 885 Castro St | work in unit #885-install new cabinets in kitchen, recessed led lights, move (relocate) 1 gas line. no structural work. no plans, install garbage disposal dishwasher, sink & faucetDetails
work in unit #885-install new cabinets in kitchen, recessed led lights, move (relocate) 1 gas line. no structural work. no plans, install garbage disposal dishwasher, sink & faucet | $15,000 |
| Feb 11, 2011 | Completed final sign-off May 2011 | 210 Banks St | install new cabinets, insulate walls and ceiling, kitchen remodel, lighting changes must comply w/cec 150(k)Details
install new cabinets, insulate walls and ceiling, kitchen remodel, lighting changes must comply w/cec 150(k) | $19,000 |
| Feb 11, 2011 | Completed final sign-off May 2011 | 779 Andover St | install new cabinets, kitchen remodel, insulate walls and ceiling, lighting changes must comply w/cec 150(k)Details
install new cabinets, kitchen remodel, insulate walls and ceiling, lighting changes must comply w/cec 150(k) | $19,000 |
| Jan 25, 2011 | Completed final sign-off Sep 2011 | 355 Buena Vista East Av | 607 west:install new cabinets in kitchen. lighting to comply with cec 150 (k). no window,door, ceiling, or wall work on this permit.Details
607 west:install new cabinets in kitchen. lighting to comply with cec 150 (k). no window,door, ceiling, or wall work on this permit. | $9,500 |
| Jan 11, 2011 | Completed final sign-off Oct 2014 | 340 Ritch St | unit 8: 1 kitchen remodel.install new cabinets in existing floor space. patch sheetrock. no structural work. light to comply with cec 150 k 8Details
unit 8: 1 kitchen remodel.install new cabinets in existing floor space. patch sheetrock. no structural work. light to comply with cec 150 k 8 | $9,240 |
| Jun 15, 2010 | Expired or cancelled expired Jul 2014 | 2415 Lake St | unit #2419-install 6 windows (wood) within (e) frame. no alteration of (e) frame, not visible from the street. job location in bedroom & kitchen; replace in kind no change in egress window , nos structural changesDetails
unit #2419-install 6 windows (wood) within (e) frame. no alteration of (e) frame, not visible from the street. job location in bedroom & kitchen; replace in kind no change in egress window , nos structural changes | $2,500 |
| May 27, 2010 | Completed final sign-off Jul 2010 | 443 Fulton St | remodel kitchen replace cabinets/counters/plumbing fixtures only. no structural work. extg fan( chimney style) will remain. no new lightingDetails
remodel kitchen replace cabinets/counters/plumbing fixtures only. no structural work. extg fan( chimney style) will remain. no new lighting | $9,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 501 Point Lobos Av | no structural work-kitchen remodel only, remove & replace cabinets, counter tops & sink. high efficacy flourscent lights installedDetails
no structural work-kitchen remodel only, remove & replace cabinets, counter tops & sink. high efficacy flourscent lights installed | $15,000 |
| Jun 4, 2008 | Completed final sign-off Sep 2008 | 1145 Hayes St | work @ unit# 11 only. bathroom remodel. no structural. replace toilet, tub / shower, vanity, floor. remodel kitchen: sink, counter, units & cabinets. new dish washer. washer dryer. (windows under separate permit).Details
work @ unit# 11 only. bathroom remodel. no structural. replace toilet, tub / shower, vanity, floor. remodel kitchen: sink, counter, units & cabinets. new dish washer. washer dryer. (windows under separate permit). | $28,000 |
| Apr 2, 2008 | Completed final sign-off Jun 2008 | 786 Great Hy | kitchen remodel / no structural work.Details
kitchen remodel / no structural work. | $10,000 |
| Feb 25, 2008 | Never finaled issued Feb 2008, no final | 1200 Clayton St | remodel kitchen: new cabinets, counter installed. 2 plugs and 1 lighting fixture. no structural workDetails
remodel kitchen: new cabinets, counter installed. 2 plugs and 1 lighting fixture. no structural work | $10,000 |
| Oct 11, 2007 | Completed final sign-off Mar 2008 | 518 Panorama Dr | remodel kitchen/install new plugs/lites,cabinets and countertops . no structural work. new lighting to be fluorescent. instgall hood above stove.Details
remodel kitchen/install new plugs/lites,cabinets and countertops . no structural work. new lighting to be fluorescent. instgall hood above stove. | $18,000 |
| Sep 28, 2007 | Completed final sign-off Mar 2008 | 2040 Fell St | kitchen remodel-no structural work. remove existing cabinets counters and replace 1 new lite3 new plubs. hook up sink/faucet.Details
kitchen remodel-no structural work. remove existing cabinets counters and replace 1 new lite3 new plubs. hook up sink/faucet. | $15,000 |
| Aug 31, 2007 | Expired or cancelled expired May 2008 | 2139 Green St | work @ unit# a only. remove all cabinets. install same floor plan with new plugs, switches, lites. remodel. kitchen remodel. no structural. at least 50% lighting wattage shall be fluorescent.Details
work @ unit# a only. remove all cabinets. install same floor plan with new plugs, switches, lites. remodel. kitchen remodel. no structural. at least 50% lighting wattage shall be fluorescent. | $18,000 |
| Oct 11, 2005 | Completed final sign-off Jan 2006 | 1160 Greenwich St | remove existing lathe and plaster in kitchen insulate/sheetrock. install new cabinetry, kitchen remodel, no structuralDetails
remove existing lathe and plaster in kitchen insulate/sheetrock. install new cabinetry, kitchen remodel, no structural | $15,000 |