Back to bathroom remodel contractors
J B Designs And Installations
- Based in
- San Bruno
- On San Francisco permits
- Feb 2004 to Jan 2018
- Last 24 months
- 0 permits filed
75 permits since 2000: 59 completed, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2018 | Completed final sign-off Mar 2018 | 316 Arkansas St | remodel bathroom remove (e) tub and surround. replace w/ shower. no change of (e) layout. n/a for maher.Details
remodel bathroom remove (e) tub and surround. replace w/ shower. no change of (e) layout. n/a for maher. | $17,000 |
| Mar 30, 2017 | Completed final sign-off Oct 2017 | 163 Shipley St | bathroom remodel: remove tub and (e) surround, remove (e) floor covering and vanity. install (n) tub and tile surround, shower vlave, vacancy sensor. no (n) plugs or lights, replace (e) with like (n).Details
bathroom remodel: remove tub and (e) surround, remove (e) floor covering and vanity. install (n) tub and tile surround, shower vlave, vacancy sensor. no (n) plugs or lights, replace (e) with like (n). | $13,500 |
| Aug 12, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | unit #411:remove kitchen and bathroom cabinets and counters. install (replace in kind) all kitchen cabs./counters. no structural work. existing floor plan only. remove bathroom tiled walls. install new valve/body shower tile, new shower. no mechanical in kitc. or bath. install smoke & co2 detect.Details
unit #411:remove kitchen and bathroom cabinets and counters. install (replace in kind) all kitchen cabs./counters. no structural work. existing floor plan only. remove bathroom tiled walls. install new valve/body shower tile, new shower. no mechanical in kitc. or bath. install smoke & co2 detect. | $28,000 |
| Jun 4, 2008 | Completed final sign-off Sep 2008 | 1145 Hayes St | work @ unit# 11 only. bathroom remodel. no structural. replace toilet, tub / shower, vanity, floor. remodel kitchen: sink, counter, units & cabinets. new dish washer. washer dryer. (windows under separate permit).Details
work @ unit# 11 only. bathroom remodel. no structural. replace toilet, tub / shower, vanity, floor. remodel kitchen: sink, counter, units & cabinets. new dish washer. washer dryer. (windows under separate permit). | $28,000 |
| Jun 7, 2006 | Completed final sign-off Aug 2006 | 1160 Greenwich St | bath remodel new tub vanity - no structural - work performed at 1160 greenwich st. #100Details
bath remodel new tub vanity - no structural - work performed at 1160 greenwich st. #100 | $10,000 |