J A K Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Feb 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 150 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2016 | Completed final sign-off Feb 2018 | 138 Coleridge St | all work is @ rear of bldg. demolish (e) rear stairs. construct (n) 2nd fl deck & spiral stairs to grade. construct (n) lower deck less than 30 inches above grade. replace (e) windows @ 2nd fl laundry rm & @ lower level on rear facade.Details
all work is @ rear of bldg. demolish (e) rear stairs. construct (n) 2nd fl deck & spiral stairs to grade. construct (n) lower deck less than 30 inches above grade. replace (e) windows @ 2nd fl laundry rm & @ lower level on rear facade. | $35,000 |
| Sep 9, 2011 | Completed final sign-off Mar 2012 | 969 Union St | remove and replace (e) stair from 3rd floor to 4th floor with (n) steel bent stringer stair.Details
remove and replace (e) stair from 3rd floor to 4th floor with (n) steel bent stringer stair. | $25,000 |