Back to bathroom remodel contractors
J A K Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Feb 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 1 completed, 1 never finaled, 2 expired or cancelled. Typically 32 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2018 | Never finaled issued Apr 2018, no final | 1931 15th St | revision to 201712116023 relocating proposed bathroom, partitions, millwork & electricalDetails
revision to 201712116023 relocating proposed bathroom, partitions, millwork & electrical | |
| Dec 11, 2017 | Completed final sign-off Dec 2018 | 1931 15th St | interior remodel including new partitions, powder rm, hvac, bath remodel 4th level. structural work in garage. new patio door at rear of buildingDetails
interior remodel including new partitions, powder rm, hvac, bath remodel 4th level. structural work in garage. new patio door at rear of building | $95,000 |
| Oct 6, 2017 | Expired or cancelled expired Dec 2019 | 35 Conrad St | interior alteration to an (e) single family residence including 1/f bathroom remodel with new shower, 2/f bathroom fixture replacement. no exterior work or change in sq.ft.Details
interior alteration to an (e) single family residence including 1/f bathroom remodel with new shower, 2/f bathroom fixture replacement. no exterior work or change in sq.ft. | $15,000 |
| Dec 12, 2014 | Expired or cancelled expired Mar 2017 | 237 09th Av | remodel (e) kitchen on 2nd floor & two bathrooms on 3rd floor. add hallway & closet at (e) garage w/(e) 7'-0" ceiling height. relocate (e) laundry to 3rd floor.Details
remodel (e) kitchen on 2nd floor & two bathrooms on 3rd floor. add hallway & closet at (e) garage w/(e) 7'-0" ceiling height. relocate (e) laundry to 3rd floor. | $38,000 |