Iy Development & Renovation Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2023 to Sep 2026
- Last 24 months
- 32 permits filed
40 permits since 2000: 18 completed, 16 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Stairs permits
5 stairs permits: 2 completed, 3 in progress. Typically 41 days from filing to permit and 526 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | Completed final sign-off Oct 2026 | 2542 Bryant St | side stair repair, less than 50% repairs, non street facing. change dry rot posts and plate.Details
side stair repair, less than 50% repairs, non street facing. change dry rot posts and plate. | $8,000 |
| May 27, 2026 | In progress issued Jun 2026 | 1868 Greenwich St | all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof...Details
all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof... | |
| Jun 30, 2025 | In progress issued Feb 2026 | 1437 Mason St | facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope.Details
facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope. | $467,000 |
| Nov 13, 2023 | In progress issued Feb 2024 | 207 Congo St | 1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl.Details
1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl. | $98,000 |
| Jul 11, 2023 | Completed final sign-off Jun 2026 | 1860 24th Av | remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless whDetails
remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless wh | $350,000 |