Back to bathroom remodel contractors
Iy Development & Renovation Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2023 to Sep 2026
- Last 24 months
- 32 permits filed
39 permits since 2000: 16 completed, 17 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 8 completed, 10 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Oct 2026 | 2542 Bryant St | unit 1-interior remodel for 2nd floor to include remodel bathrooms, bedrooms, and kitchen.Details
unit 1-interior remodel for 2nd floor to include remodel bathrooms, bedrooms, and kitchen. | $80,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 2542 Bryant St | unit 2- 3/fl- remodel and relocated bedroom, bathroom and kitchen . add (3) bathrooms and convert living room into bedroom. replace (e) windows in kind facing street.Details
unit 2- 3/fl- remodel and relocated bedroom, bathroom and kitchen . add (3) bathrooms and convert living room into bedroom. replace (e) windows in kind facing street. | $100,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 2542 Bryant St | unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deckDetails
unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deck | $150,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 2542 Bryant St | 2542 bryant st: 1 bathroom remodels like to like; update plumbing & electrical.Details
2542 bryant st: 1 bathroom remodels like to like; update plumbing & electrical. | $35,000 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 1868 Greenwich St | revision to pa #202509195724 to convert shower into a steam shower and adding a second shower head on other side. demo and install tile. install water fixtures and new shower door. upgrade plumbing line. 2nd floor bathroomDetails
revision to pa #202509195724 to convert shower into a steam shower and adding a second shower head on other side. demo and install tile. install water fixtures and new shower door. upgrade plumbing line. 2nd floor bathroom | $10,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 1868 Greenwich St | bathroom remodel bottom floor. interior fixture, finishes, electrical panel, & interior layoutDetails
bathroom remodel bottom floor. interior fixture, finishes, electrical panel, & interior layout | $293,000 |
| Aug 26, 2025 | Completed final sign-off Jun 2026 | 127 Caselli Av | interior remodel on 1/f. remodel kitchen and toilet. replace 2 rear windows with french doors. relocate washer and dryer to basement. 2/f: remodel bathroom.Details
interior remodel on 1/f. remodel kitchen and toilet. replace 2 rear windows with french doors. relocate washer and dryer to basement. 2/f: remodel bathroom. | $50,000 |
| Aug 13, 2025 | Completed final sign-off Apr 2026 | 1335 Filbert St | unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.cDetails
unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.c | $50,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 4545 19th St | revision to bpa: 202504235021. change wording from 2nd flr to 1st floor. 1st floor bathroom remodel. administrative changeDetails
revision to bpa: 202504235021. change wording from 2nd flr to 1st floor. 1st floor bathroom remodel. administrative change | |
| Jul 3, 2025 | In progress issued Jul 2025 | 478 Green St | g//f restaurant -patching a bathroom wall 10"x 10". replacing 2 light fixtures above the sink and replacing 2 faucets. (like for like restroom only)Details
g//f restaurant -patching a bathroom wall 10"x 10". replacing 2 light fixtures above the sink and replacing 2 faucets. (like for like restroom only) | $5,000 |
| Jun 23, 2025 | In progress issued Jun 2025 | 421 14th St | one bathroom remodel like for like (hallway).Details
one bathroom remodel like for like (hallway). | $9,000 |
| Apr 23, 2025 | In progress issued Apr 2025 | 4545 19th St | second floor bathroom remodel like for like 50 sqft, shower pan, no walls or layout changed.Details
second floor bathroom remodel like for like 50 sqft, shower pan, no walls or layout changed. | $25,000 |
| Feb 7, 2025 | Completed final sign-off Jun 2025 | 4019 Folsom St | kitchen remodel and bathroom remodel like for like no walls or layout changes, shower panDetails
kitchen remodel and bathroom remodel like for like no walls or layout changes, shower pan | $25,000 |
| Feb 4, 2025 | Expired or cancelled cancelled May 2026 | 736 Lisbon St | complete bathroom, kitchen remodel, & hvac like for like. comply with nov 202428023. item provide smoke detector c908, 911hc) installing 4 per room & carbon monoxide alarm 1 per room. provide jeat, general maintenace according to item 1-9. eliminate mold & mildew from ceiling wallDetails
complete bathroom, kitchen remodel, & hvac like for like. comply with nov 202428023. item provide smoke detector c908, 911hc) installing 4 per room & carbon monoxide alarm 1 per room. provide jeat, general maintenace according to item 1-9. eliminate mold & mildew from ceiling wall | $60,000 |
| Feb 4, 2025 | Completed final sign-off Mar 2025 | 4545 19th St | complete bathroom remodel like for like. no walls or layout changes tub to tubDetails
complete bathroom remodel like for like. no walls or layout changes tub to tub | $25,000 |
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 5160 Diamond Heights Bl | complete bathroom remodel like for like no walls or layout changes. tub to tub.Details
complete bathroom remodel like for like no walls or layout changes. tub to tub. | $20,000 |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 5150 Diamond Heights Bl | complete 1 bathroom remodel like for like, no wall or layout changes, tub replacement.Details
complete 1 bathroom remodel like for like, no wall or layout changes, tub replacement. | $25,000 |
| Aug 21, 2024 | Completed final sign-off Sep 2024 | 1 Cuvier St | one complete hallway bathroom remodel like for like, no walls or layout changes, shower pan.Details
one complete hallway bathroom remodel like for like, no walls or layout changes, shower pan. | $25,000 |
| Nov 13, 2023 | In progress issued Feb 2024 | 207 Congo St | 1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl.Details
1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl. | $98,000 |
| Feb 28, 2023 | Never finaled issued Mar 2023, no final | 319 22nd Av | interior remodel on 3rd flr, add a bathroom in existing master bedroom.Details
interior remodel on 3rd flr, add a bathroom in existing master bedroom. | $20,000 |