Integrity General Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jan 2013 to Jan 2026
- Last 24 months
- 5 permits filed
86 permits since 2000: 63 completed, 2 in progress, 17 never finaled, 4 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2025 | Expired or cancelled expired May 2026 | 1667 34th Av | revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear.Details
revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear. | $20,000 |
| Jun 7, 2023 | Completed final sign-off Jan 2024 | 436 University St | remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless typeDetails
remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless type | $80,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 1437 Polk St | comply w/ nov 202304690. repair south side 2nd to 3rd fl stairs. 3rd fl unit 7: fire damaged unit to be fully remodeled. unit 10: replace ceiling fire damaged sheetrock. replace ceiling & wall fire damaged sheetrock in common area. all work in-kind.Details
comply w/ nov 202304690. repair south side 2nd to 3rd fl stairs. 3rd fl unit 7: fire damaged unit to be fully remodeled. unit 10: replace ceiling fire damaged sheetrock. replace ceiling & wall fire damaged sheetrock in common area. all work in-kind. | $50,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 80 Santa Ysabel Av | remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryerDetails
remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryer | $60,000 |
| Apr 16, 2015 | Completed final sign-off Dec 2016 | 2367 15th Av | 1st flr/garage: - add 2 bedrooms and 1 home office and 2 full bathrooms on 1st floor (garage level). add new rear stairs and deck off 2nd flr. relocate w/d, w/h and furnaceDetails
1st flr/garage: - add 2 bedrooms and 1 home office and 2 full bathrooms on 1st floor (garage level). add new rear stairs and deck off 2nd flr. relocate w/d, w/h and furnace | $65,000 |
| Sep 11, 2014 | Completed final sign-off Sep 2015 | 1121 Burrows St | comply with compliant #201492161, convert storage area to bedrooms on ground floor, add one bath, add rear deck with stairs approx. 18'6" x 10'Details
comply with compliant #201492161, convert storage area to bedrooms on ground floor, add one bath, add rear deck with stairs approx. 18'6" x 10' | $30,000 |
| Nov 5, 2013 | Completed final sign-off Mar 2014 | 278 Edinburgh St | 2nd floor alteration to relocate ktichen, interior stair & bedrooms, add new bathroom, replace on front window, new electrical. 1st floor alteration to add two bedrooms, family room & full bath, recess garage door, new furnace, water heater & foundation.Details
2nd floor alteration to relocate ktichen, interior stair & bedrooms, add new bathroom, replace on front window, new electrical. 1st floor alteration to add two bedrooms, family room & full bath, recess garage door, new furnace, water heater & foundation. | $85,000 |