Back to kitchen remodel contractors
Integrity General Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jan 2013 to Jan 2026
- Last 24 months
- 5 permits filed
86 permits since 2000: 63 completed, 2 in progress, 17 never finaled, 4 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
39 kitchen remodel permits: 28 completed, 9 never finaled, 2 expired or cancelled. Typically 12 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2025 | Completed final sign-off Sep 2026 | 2120 Moraga St | 1/f: add 2 bedroom, 2 full bath and family. 2/f: reodel kitchen and bathroom, add 1 full bath. add new patio at rear.Details
1/f: add 2 bedroom, 2 full bath and family. 2/f: reodel kitchen and bathroom, add 1 full bath. add new patio at rear. | $120,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 209 Sargent St | kitchen and bathroom remodel. relocate refrigerator. replace (e) counter & add new counter spaces.Details
kitchen and bathroom remodel. relocate refrigerator. replace (e) counter & add new counter spaces. | $10,000 |
| Aug 4, 2023 | Completed final sign-off Jul 2024 | 795 Naples St | 1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit.Details
1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit. | $260,000 |
| Jun 7, 2023 | Completed final sign-off Jan 2024 | 436 University St | remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless typeDetails
remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless type | $80,000 |
| Feb 28, 2023 | Completed final sign-off Sep 2024 | 50 Santa Clara Av | 1/f: add 1 bedroom, 1 full bath and laundry; 2/f: remodel kitchen and dinning room; 3/f: remodel 3 bathrooms; replace all windows in-kind w/wood, replace garage door, add new cantilever deck at rear, epair 3rd flr deck.Details
1/f: add 1 bedroom, 1 full bath and laundry; 2/f: remodel kitchen and dinning room; 3/f: remodel 3 bathrooms; replace all windows in-kind w/wood, replace garage door, add new cantilever deck at rear, epair 3rd flr deck. | $98,000 |
| Oct 18, 2022 | Completed final sign-off Dec 2022 | 252 Minerva St | main floor: replace kitchen countertop. replace toilets and vanities for 2 bathrooms. must address complaint #202296806 eid. no wall alteredDetails
main floor: replace kitchen countertop. replace toilets and vanities for 2 bathrooms. must address complaint #202296806 eid. no wall altered | $2,300 |
| Sep 13, 2022 | Completed final sign-off Oct 2022 | 1467 19th Av | remodel kitchen in kind (220 sf.) no alteration of wall, window, doorDetails
remodel kitchen in kind (220 sf.) no alteration of wall, window, door | $10,000 |
| Dec 24, 2021 | Completed final sign-off Jun 2022 | 2462 41st Av | remodel kitchen and 2 bathrooms.Details
remodel kitchen and 2 bathrooms. | $20,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 1839 25th Av | 2nd fl: infill (e) center light court, reconfigure/ remodel kitchen and dining room and bathroom, add 1 new full bath. add rear deck per plans.Details
2nd fl: infill (e) center light court, reconfigure/ remodel kitchen and dining room and bathroom, add 1 new full bath. add rear deck per plans. | $70,000 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 3228 Santiago St | remodel kitchen (100 sf) & bathroom (35 sf) in-kind.Details
remodel kitchen (100 sf) & bathroom (35 sf) in-kind. | $16,000 |
| Mar 12, 2020 | Completed final sign-off Dec 2020 | 1530 Eucalyptus Dr | add a family room, a bedroom, a full bathroom and a laundry room on the 1st floor. remodel 2nd floor kitchen and 2 bathrooms.Details
add a family room, a bedroom, a full bathroom and a laundry room on the 1st floor. remodel 2nd floor kitchen and 2 bathrooms. | $80,000 |
| Dec 5, 2019 | Completed final sign-off May 2020 | 1475 19th Av | 1st fl - add 1 unit - 1 kitchen, living, office, 2 bedrooms and 2 full bathsDetails
1st fl - add 1 unit - 1 kitchen, living, office, 2 bedrooms and 2 full baths | $30,000 |
| May 14, 2019 | Completed final sign-off Dec 2019 | 118 Casitas Av | rmeodel kitchen and 2 baths. repair rear deck less than 50%.Details
rmeodel kitchen and 2 baths. repair rear deck less than 50%. | $30,000 |
| Mar 29, 2018 | Completed final sign-off Jul 2018 | 45 Dunsmuir St | kitchen remodel: replace kitchen cabinets & counter tops. no walls being removed or added. revisoin to pa# 201709200112Details
kitchen remodel: replace kitchen cabinets & counter tops. no walls being removed or added. revisoin to pa# 201709200112 | $5,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 80 Santa Ysabel Av | remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryerDetails
remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryer | $60,000 |
| Sep 14, 2017 | Completed final sign-off Jun 2018 | 13 Las Villas Ct | interior remodel, kitchen & bathroom, window replacement back of house not visible from street, new hardwood floor, painting,Details
interior remodel, kitchen & bathroom, window replacement back of house not visible from street, new hardwood floor, painting, | $20,000 |
| Aug 30, 2017 | Never finaled filed Aug 2017, never issued | 1190 Revere Av | legalize (e) kitchen to convert (2) units to (3) units under ordinance #43-14Details
legalize (e) kitchen to convert (2) units to (3) units under ordinance #43-14 | $9,000 |
| Aug 30, 2017 | Never finaled issued Aug 2019, no final | 1715 Newcomb Av | legalize ground floor kitchen. add unit c under ordinance #43-14 (1) bedroom & (1) bathDetails
legalize ground floor kitchen. add unit c under ordinance #43-14 (1) bedroom & (1) bath | $8,000 |
| Aug 18, 2017 | Completed final sign-off Dec 2018 | 2242 35th Av | relocate bathroom, add new one and a half bath. relocate kitchen, enclose light court, add new office , add 7 skylights on 2nd floor. add 2 bedrooms, 2 full baths, a media room, a storage room. relocate laundry facilities. replace with w/h & furnace at 1st fl. to comply with complaint #201797861Details
relocate bathroom, add new one and a half bath. relocate kitchen, enclose light court, add new office , add 7 skylights on 2nd floor. add 2 bedrooms, 2 full baths, a media room, a storage room. relocate laundry facilities. replace with w/h & furnace at 1st fl. to comply with complaint #201797861 | $120,000 |
| Jun 9, 2017 | Never finaled filed Jun 2017, never issued | 3164 San Bruno Av | legalize (e) kitchen. convert single family to 2 units under ordinance# 43-14. 2 bedrooms & 1 bath in new unit.Details
legalize (e) kitchen. convert single family to 2 units under ordinance# 43-14. 2 bedrooms & 1 bath in new unit. | $8,000 |
| Mar 24, 2017 | Completed final sign-off Sep 2017 | 243 25th Av | legalize 1 bedroom, 1 kitchen and kitchen at the ground floor to comply with complaint #201757212. no other work.Details
legalize 1 bedroom, 1 kitchen and kitchen at the ground floor to comply with complaint #201757212. no other work. | $5,000 |
| Dec 15, 2015 | Never finaled issued Feb 2020, no final | 1270 Fitzgerald Av | legalize (e) kitchens to legalize (e) residential units under unit legalization program per plan. comply w/ nov #201569121, #201569684, #201567912. per ord #43-14. add one bedroom.Details
legalize (e) kitchens to legalize (e) residential units under unit legalization program per plan. comply w/ nov #201569121, #201569684, #201567912. per ord #43-14. add one bedroom. | $8,000 |
| Dec 15, 2015 | Never finaled filed Dec 2015, never issued | 1351 Revere Av | revise appln #201507010461 legalize (e) kitchen on the round fl to legalize illegal units per plan. comply w/ nov #201553041, #201569651, #201553052 per ord 43-14.Details
revise appln #201507010461 legalize (e) kitchen on the round fl to legalize illegal units per plan. comply w/ nov #201553041, #201569651, #201553052 per ord 43-14. | |
| Dec 11, 2015 | Completed final sign-off Oct 2021 | 1465 Revere Av | legalize existing kitchen on ground floor to and add one residential unitDetails
legalize existing kitchen on ground floor to and add one residential unit | $8,000 |
| Dec 2, 2015 | Never finaled filed Dec 2015, never issued | 1050 Gilman Av | legalize existing kitchen on the ground floor. to legalize 1 residential unit under unit legalization ord 43-14.Details
legalize existing kitchen on the ground floor. to legalize 1 residential unit under unit legalization ord 43-14. | $8,000 |
| Dec 2, 2015 | Expired or cancelled cancelled Nov 2022 | 38 Carr St | legalize existing kitchen on the second floor. to legalize 1 existing residential unit under unit legalization ord 43-14.Details
legalize existing kitchen on the second floor. to legalize 1 existing residential unit under unit legalization ord 43-14. | $8,000 |
| Nov 20, 2015 | Expired or cancelled expired Nov 2021 | 947 Innes Av | (per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914Details
(per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914 | $8,000 |
| Nov 20, 2015 | Never finaled filed Nov 2015, never issued | 1395 Shafter Av | legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. comply with nov #201569101, #201569671, #201567612. ** maher: n/a **Details
legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. comply with nov #201569101, #201569671, #201567612. ** maher: n/a ** | $5,000 |
| Nov 10, 2015 | Never finaled filed Nov 2015, never issued | 1083 Hollister Av | legalize ground fl kitchen to add (1)(n) residential unit under unit lealization program. legalize garage to ground fl unit's living room. comply with nov #201569083, nov #201569681, nov #201567882Details
legalize ground fl kitchen to add (1)(n) residential unit under unit lealization program. legalize garage to ground fl unit's living room. comply with nov #201569083, nov #201569681, nov #201567882 | $10,000 |
| Oct 7, 2015 | Completed final sign-off Oct 2016 | 2071 18th Av | remodel kitchen with non structural wall removal. replace damaged drywall at living room, new rear deck, remodel existing bath 1st fl.Details
remodel kitchen with non structural wall removal. replace damaged drywall at living room, new rear deck, remodel existing bath 1st fl. | $30,000 |
| Jul 15, 2015 | Completed final sign-off Dec 2019 | 85 Valdez Av | 1st fl alteration to add 3 bedrooms, 3 full baths, laundry room. relocate kitchen to dining room. convert kitchen to new bedroom. remodel e bath on 2nd flDetails
1st fl alteration to add 3 bedrooms, 3 full baths, laundry room. relocate kitchen to dining room. convert kitchen to new bedroom. remodel e bath on 2nd fl | $110,000 |
| Jun 11, 2015 | Completed final sign-off May 2016 | 243 Stratford Dr | add 1 bedroom, 1 bathroom & laundry on garage floor per plan. relocate (e) kitchen & (e) dining room, add 1 bath on 1st floor per plan.Details
add 1 bedroom, 1 bathroom & laundry on garage floor per plan. relocate (e) kitchen & (e) dining room, add 1 bath on 1st floor per plan. | $8,000 |
| Apr 16, 2015 | Completed final sign-off May 2016 | 347 Athens St | remodel kitchen and 2 bathrooms. add a new bathroom, relocate closets in bedrooms. add a home office, 2 bedrooms and 3 full bathrooms on 1st flr.Details
remodel kitchen and 2 bathrooms. add a new bathroom, relocate closets in bedrooms. add a home office, 2 bedrooms and 3 full bathrooms on 1st flr. | $85,000 |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 162 Princeton St | remodel kitchen on 2nd fl. add new family room, bedroom, 2 baths, storage room on 1st fl*Details
remodel kitchen on 2nd fl. add new family room, bedroom, 2 baths, storage room on 1st fl* | $45,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 742 Avalon Av | remodel kitchen convert e bath and closet to 2 baths. add rear deck on 2nd fl. add a family room, 2 bedrooms and 2 full baths on 1st flDetails
remodel kitchen convert e bath and closet to 2 baths. add rear deck on 2nd fl. add a family room, 2 bedrooms and 2 full baths on 1st fl | $75,000 |
| Oct 23, 2014 | Completed final sign-off Nov 2015 | 600 Hamilton St | remodel kitchen, add family room, 3 bedroos, 3 baths on 1st fl, relocate furnace and waterheaterDetails
remodel kitchen, add family room, 3 bedroos, 3 baths on 1st fl, relocate furnace and waterheater | $65,000 |
| Oct 15, 2013 | Completed final sign-off Apr 2017 | 1756 Revere Av | horizontal extension at rear (approx 20'-0"). change of use from single family to 2 units. 2 new bedrooms, kitchen, bathroom relocation on 1st floor. add 1 bed, 1 bath & study on 2nd floor.Details
horizontal extension at rear (approx 20'-0"). change of use from single family to 2 units. 2 new bedrooms, kitchen, bathroom relocation on 1st floor. add 1 bed, 1 bath & study on 2nd floor. | $75,000 |
| Aug 15, 2013 | Completed final sign-off Apr 2017 | 1756 Revere Av | kitchen remodel, bathroom remodel, replace drywallDetails
kitchen remodel, bathroom remodel, replace drywall | $20,000 |
| Jan 10, 2013 | Completed final sign-off Mar 2013 | 3975 Mission St | kitchen remodel-cabinets installation, tile installation. no adding or removing wallDetails
kitchen remodel-cabinets installation, tile installation. no adding or removing wall | $11,000 |