Back to kitchen remodel contractors
Initial Construction
- Based in
- Rohnert Park
- On San Francisco permits
- Nov 2017 to Nov 2025
- Last 24 months
- 4 permits filed
36 permits since 2000: 32 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 82 Arroyo Wy | demo (e) kitchen and bathroom to replace in kind. remove non-load bearing wall. remove built in bar and reframe closet for powder room. replace window in kitchen nook. wire for new electrical per plan.Details
demo (e) kitchen and bathroom to replace in kind. remove non-load bearing wall. remove built in bar and reframe closet for powder room. replace window in kitchen nook. wire for new electrical per plan. | $35,000 |
| Sep 27, 2024 | In progress issued Jun 2025 | 41 Prosper St | renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdwsDetails
renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdws | $400,000 |
| Apr 11, 2024 | Completed final sign-off Nov 2025 | 961 Dolores St | interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding.Details
interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding. | $450,000 |
| Oct 1, 2023 | Completed final sign-off Nov 2023 | 1360 22nd Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $30,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 10 Hillway Av | remove kitchen wall. install new beam. construct kitchen island.Details
remove kitchen wall. install new beam. construct kitchen island. | $30,000 |
| May 3, 2023 | Completed final sign-off Jul 2023 | 582 24th Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $15,000 |
| Aug 27, 2021 | Completed final sign-off Dec 2021 | 1949 15th St | unit a: kitchen and bath remodel. replace in kind. light per cenc 150.0(k)Details
unit a: kitchen and bath remodel. replace in kind. light per cenc 150.0(k) | $35,000 |
| Jun 28, 2021 | Completed final sign-off Apr 2022 | 342 18th Av | 2/f: interior renovations include kitchen and bath remodel. adding a new primary master bath and relocating laundry to 2nd floor.Details
2/f: interior renovations include kitchen and bath remodel. adding a new primary master bath and relocating laundry to 2nd floor. | $50,000 |
| Jan 26, 2021 | Completed final sign-off Mar 2021 | 1669 17th Av | replace in-kind kitchen. new cabinets, tile & counters. bring electrical up to code. no plumbing or structural work.Details
replace in-kind kitchen. new cabinets, tile & counters. bring electrical up to code. no plumbing or structural work. | $20,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2021 | 494 Ulloa St | replace in koind kitchen and bath. new tile appliancess and cabinets. no structural work. no walls removedDetails
replace in koind kitchen and bath. new tile appliancess and cabinets. no structural work. no walls removed | $20,000 |
| Nov 13, 2020 | Completed final sign-off Jan 2021 | 1817 California St | #1m: replace in kind kitchen & bathroom. new cabinets, tile, appliances. no structural work. no removal of walls.Details
#1m: replace in kind kitchen & bathroom. new cabinets, tile, appliances. no structural work. no removal of walls. | $20,000 |
| Oct 22, 2019 | Completed final sign-off May 2020 | 167 Divisadero St | remodel kitchne and replace in kind. remodel existing bathroom and replace in kind. relocate existing laundry to hall closet. kitchen 10'x15', bathroom 8'x8'. no structural work, no change in wall layout.Details
remodel kitchne and replace in kind. remodel existing bathroom and replace in kind. relocate existing laundry to hall closet. kitchen 10'x15', bathroom 8'x8'. no structural work, no change in wall layout. | $40,000 |
| Sep 30, 2019 | Completed final sign-off Feb 2020 | 200 Brannan St | unit 302: kitchen & bathroom remdoel: replace ktichen cabinets & cabintes in-kind (also oven & d/w). replace lighting in (e) kitchen. retile bathroom in-kin & replace (e) vanity.Details
unit 302: kitchen & bathroom remdoel: replace ktichen cabinets & cabintes in-kind (also oven & d/w). replace lighting in (e) kitchen. retile bathroom in-kin & replace (e) vanity. | $15,000 |
| Jan 31, 2019 | Completed final sign-off Jan 2020 | 408 Sanchez St | kitchen remodel: new kitchen. remove 1 int. wall between din & kitchen. bathrm remodel per plan. add 2 skylights. enclose (e) int. opening between living & bedrm. new closet. add a sink in toilet room. window replacements. remove fireplace. new furnace, water heater, light & elec per plan.Details
kitchen remodel: new kitchen. remove 1 int. wall between din & kitchen. bathrm remodel per plan. add 2 skylights. enclose (e) int. opening between living & bedrm. new closet. add a sink in toilet room. window replacements. remove fireplace. new furnace, water heater, light & elec per plan. | $150,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2020 | 2563 15th Av | remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgradesDetails
remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgrades | $200,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 44 Sharon St | replace in kind kitchen and bathroom. no changes to wall locations.Details
replace in kind kitchen and bathroom. no changes to wall locations. | $40,000 |