Back to bathroom remodel contractors
Initial Construction
- Based in
- Rohnert Park
- On San Francisco permits
- Nov 2017 to Nov 2025
- Last 24 months
- 4 permits filed
36 permits since 2000: 32 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 82 Arroyo Wy | demo (e) kitchen and bathroom to replace in kind. remove non-load bearing wall. remove built in bar and reframe closet for powder room. replace window in kitchen nook. wire for new electrical per plan.Details
demo (e) kitchen and bathroom to replace in kind. remove non-load bearing wall. remove built in bar and reframe closet for powder room. replace window in kitchen nook. wire for new electrical per plan. | $35,000 |
| Sep 27, 2024 | In progress issued Jun 2025 | 41 Prosper St | renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdwsDetails
renovation & structural retrofit:relocate kitchens, bathrooms, add 2nd bath in (e) units. renovate (e) g/f storage area 354sf office w/ bath & wet bar.remove (e) rear stair w/ ab-005 local equiv for sffd ladder access.new wood siding at ext walls at street.new wdws e/s building rear.replace (e) wdws | $400,000 |
| Apr 11, 2024 | Completed final sign-off Nov 2025 | 961 Dolores St | interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding.Details
interior remodel for four story two unit building. kitchen, bathroom and bedroom remodel for both units. replace non street facing windows. foundation replacement. replace rear patio door. repair stucco and wood siding. | $450,000 |
| Oct 7, 2022 | Completed final sign-off Nov 2022 | 582 24th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line. | $15,000 |
| Aug 9, 2022 | Completed final sign-off Nov 2022 | 1360 22nd Av | bathroom remodel. add corner sink in powder room.Details
bathroom remodel. add corner sink in powder room. | $20,000 |
| Aug 27, 2021 | Completed final sign-off Dec 2021 | 1949 15th St | unit a: kitchen and bath remodel. replace in kind. light per cenc 150.0(k)Details
unit a: kitchen and bath remodel. replace in kind. light per cenc 150.0(k) | $35,000 |
| Jun 28, 2021 | Completed final sign-off Apr 2022 | 342 18th Av | 2/f: interior renovations include kitchen and bath remodel. adding a new primary master bath and relocating laundry to 2nd floor.Details
2/f: interior renovations include kitchen and bath remodel. adding a new primary master bath and relocating laundry to 2nd floor. | $50,000 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 340 18th Av | 1 bathroom remodel. relace in-kind vanity, toliet and shower stall.Details
1 bathroom remodel. relace in-kind vanity, toliet and shower stall. | $12,000 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 676 Noe St | 1 bathroom remodel. relace in-kind vanity, toliet and bath tub.Details
1 bathroom remodel. relace in-kind vanity, toliet and bath tub. | $12,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2021 | 494 Ulloa St | replace in koind kitchen and bath. new tile appliancess and cabinets. no structural work. no walls removedDetails
replace in koind kitchen and bath. new tile appliancess and cabinets. no structural work. no walls removed | $20,000 |
| Nov 13, 2020 | Completed final sign-off Jan 2021 | 1817 California St | #1m: replace in kind kitchen & bathroom. new cabinets, tile, appliances. no structural work. no removal of walls.Details
#1m: replace in kind kitchen & bathroom. new cabinets, tile, appliances. no structural work. no removal of walls. | $20,000 |
| Aug 15, 2020 | Completed final sign-off Sep 2020 | 342 Hayes St | replace in kind 3 bathroom (2 full bathrooms 5x7ea & 1 powder room 4x7) vanities & fixtures, remove and replace bath floor tile. remove existing swinging door in non-load bearing wall and replace with pocket door. add hardwired smoke detector downstairs.Details
replace in kind 3 bathroom (2 full bathrooms 5x7ea & 1 powder room 4x7) vanities & fixtures, remove and replace bath floor tile. remove existing swinging door in non-load bearing wall and replace with pocket door. add hardwired smoke detector downstairs. | $20,000 |
| Nov 25, 2019 | Completed final sign-off May 2020 | 167 Divisadero St | revision to pa 201910225222. interior remodel of 2nd floor, new den and bathroom, move laundry and closet. some interior demolition, voluntary plywood strengthening.Details
revision to pa 201910225222. interior remodel of 2nd floor, new den and bathroom, move laundry and closet. some interior demolition, voluntary plywood strengthening. | $30,000 |
| Oct 22, 2019 | Completed final sign-off May 2020 | 167 Divisadero St | remodel kitchne and replace in kind. remodel existing bathroom and replace in kind. relocate existing laundry to hall closet. kitchen 10'x15', bathroom 8'x8'. no structural work, no change in wall layout.Details
remodel kitchne and replace in kind. remodel existing bathroom and replace in kind. relocate existing laundry to hall closet. kitchen 10'x15', bathroom 8'x8'. no structural work, no change in wall layout. | $40,000 |
| Sep 30, 2019 | Completed final sign-off Feb 2020 | 200 Brannan St | unit 302: kitchen & bathroom remdoel: replace ktichen cabinets & cabintes in-kind (also oven & d/w). replace lighting in (e) kitchen. retile bathroom in-kin & replace (e) vanity.Details
unit 302: kitchen & bathroom remdoel: replace ktichen cabinets & cabintes in-kind (also oven & d/w). replace lighting in (e) kitchen. retile bathroom in-kin & replace (e) vanity. | $15,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2020 | 2563 15th Av | remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgradesDetails
remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgrades | $200,000 |
| Mar 19, 2018 | Completed final sign-off Sep 2018 | 38 Sharon St | proposed interior remodeling of (e) 3rd fl. addition of 1 bath room, relocation of (e) bath addition of 1 more closetDetails
proposed interior remodeling of (e) 3rd fl. addition of 1 bath room, relocation of (e) bath addition of 1 more closet | $45,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 44 Sharon St | replace in kind kitchen and bathroom. no changes to wall locations.Details
replace in kind kitchen and bathroom. no changes to wall locations. | $40,000 |