Block 0809, lot 035
342 Hayes St
- City’s use
- Single Family Residential
- Built
- 1996
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,082 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
1 permit filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2020 | Completed final sign-off Sep 2020 | 342 Hayes St | Initial Construction | replace in kind 3 bathroom (2 full bathrooms 5x7ea & 1 powder room 4x7) vanities & fixtures, remove and replace bath floor tile. remove existing swinging door in non-load bearing wall and replace with pocket door. add hardwired smoke detector downstairs.Details
replace in kind 3 bathroom (2 full bathrooms 5x7ea & 1 powder room 4x7) vanities & fixtures, remove and replace bath floor tile. remove existing swinging door in non-load bearing wall and replace with pocket door. add hardwired smoke detector downstairs. | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.