In-House Development
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2006 to Oct 2008
- Last 24 months
- 0 permits filed
16 permits since 2000: 8 completed, 1 never finaled, 7 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2007 | Completed final sign-off Mar 2007 | 350 Glenview Dr | replacing (e) prefab concrete steps on 2 stair cases. comply with his nov#200791934. will use same beams & raling. rebuilding 50% existing staris.Details
replacing (e) prefab concrete steps on 2 stair cases. comply with his nov#200791934. will use same beams & raling. rebuilding 50% existing staris. | $17,000 |
| Feb 15, 2007 | Completed final sign-off Jun 2007 | 621 Stockton St | 50% reconsturuction of existing deck of stairs bring up to current standard of stairs landings provide hand rail remved all damaged lumbarsDetails
50% reconsturuction of existing deck of stairs bring up to current standard of stairs landings provide hand rail remved all damaged lumbars | $8,000 |