20 permits since 2000: 18 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 4 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2024 | In progress issued Nov 2024 | 1101 Green St | unit #604: kitchen - remove & replace counter tops. plumbing - changing valves & fixtures for kitchen and bathroom. electrical - changing face plate from outlets and changing recess light 6" to 4'Details
unit #604: kitchen - remove & replace counter tops. plumbing - changing valves & fixtures for kitchen and bathroom. electrical - changing face plate from outlets and changing recess light 6" to 4' | $8,500 |
| Jul 22, 2020 | Completed final sign-off Feb 2021 | 1220 04th Av | removal of bearing wall between dining room and kitchen in both 2nd floor and 3rd floor flatsDetails
removal of bearing wall between dining room and kitchen in both 2nd floor and 3rd floor flats | $5,000 |
| Jun 5, 2020 | Completed final sign-off Jan 2021 | 1220 04th Av | remodeling: kitchen and bathroom ( tile work, replace bathtub, replace toilet, and sink). changing 15 recess light. work in both units. all work in-kind.Details
remodeling: kitchen and bathroom ( tile work, replace bathtub, replace toilet, and sink). changing 15 recess light. work in both units. all work in-kind. | $47,500 |
| Nov 28, 2018 | Completed final sign-off Jul 2021 | 234 Andover St | addition of dormers to (e) 3rd fl roof; new bath at 3rd fl; reconfigure of kitchen, living, dining, bedroom and bath areas at 2nd fl new int stiar connection from 2nd to 3rd. replace existing windows. no work on ground floor.Details
addition of dormers to (e) 3rd fl roof; new bath at 3rd fl; reconfigure of kitchen, living, dining, bedroom and bath areas at 2nd fl new int stiar connection from 2nd to 3rd. replace existing windows. no work on ground floor. | $100,000 |
| Nov 7, 2018 | Completed final sign-off Mar 2019 | 1714 36th Av | remodeling bathroom incl (n) tub, tile work for wall and floor, changing light fixtures. remodeling kitchen incl (n) cabinets, lights, tile work for floorDetails
remodeling bathroom incl (n) tub, tile work for wall and floor, changing light fixtures. remodeling kitchen incl (n) cabinets, lights, tile work for floor | $13,750 |
| Jun 30, 2017 | Completed final sign-off Oct 2017 | 403 Main St | remodel 2 bathrooms & 1 kitchen. add recess lights, cabinents for kitchen. 1 shower pan for 1 bathroom, 1 tub for other bathroom, install wall tile for each one.Details
remodel 2 bathrooms & 1 kitchen. add recess lights, cabinents for kitchen. 1 shower pan for 1 bathroom, 1 tub for other bathroom, install wall tile for each one. | $25,000 |
| Sep 7, 2016 | Completed final sign-off Jan 2017 | 264 17th Av | remodeling kitchen like for like, no changes to wallsDetails
remodeling kitchen like for like, no changes to walls | $5,500 |