Imark Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Sep 2016 to Nov 2024
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2024 | In progress issued Nov 2024 | 1101 Green St | unit #604: kitchen - remove & replace counter tops. plumbing - changing valves & fixtures for kitchen and bathroom. electrical - changing face plate from outlets and changing recess light 6" to 4'Details
unit #604: kitchen - remove & replace counter tops. plumbing - changing valves & fixtures for kitchen and bathroom. electrical - changing face plate from outlets and changing recess light 6" to 4' | $8,500 |
| Jul 22, 2020 | Completed final sign-off Feb 2021 | 1220 04th Av | removal of bearing wall between dining room and kitchen in both 2nd floor and 3rd floor flatsDetails
removal of bearing wall between dining room and kitchen in both 2nd floor and 3rd floor flats | $5,000 |
| Jul 22, 2020 | Completed final sign-off Feb 2021 | 1220 04th Av | (n) interior stair between 2/f and 1/fDetails
(n) interior stair between 2/f and 1/f | $5,000 |
| Jun 5, 2020 | Completed final sign-off Jan 2021 | 1220 04th Av | remodeling: kitchen and bathroom ( tile work, replace bathtub, replace toilet, and sink). changing 15 recess light. work in both units. all work in-kind.Details
remodeling: kitchen and bathroom ( tile work, replace bathtub, replace toilet, and sink). changing 15 recess light. work in both units. all work in-kind. | $47,500 |
| Jan 17, 2019 | Completed final sign-off Aug 2024 | 791 San Jose Av | remove (e) deck at rear. to comply with complaint #201588231 item #2.Details
remove (e) deck at rear. to comply with complaint #201588231 item #2. | $500 |
| Jan 9, 2019 | Completed final sign-off Jul 2021 | 234 Andover St | new interior stair connection from 2nd flr to 1st flr expanding of conditioned space with family room study & new bath with infill below (e) second floor reat areaDetails
new interior stair connection from 2nd flr to 1st flr expanding of conditioned space with family room study & new bath with infill below (e) second floor reat area | $10,000 |
| Dec 21, 2018 | Completed final sign-off Aug 2024 | 791 San Jose Av | per legalization ordinance# 43-14, legalize 1 bedroom, 2 bath unit.Details
per legalization ordinance# 43-14, legalize 1 bedroom, 2 bath unit. | $55,000 |
| Nov 28, 2018 | Completed final sign-off Jul 2021 | 234 Andover St | addition of dormers to (e) 3rd fl roof; new bath at 3rd fl; reconfigure of kitchen, living, dining, bedroom and bath areas at 2nd fl new int stiar connection from 2nd to 3rd. replace existing windows. no work on ground floor.Details
addition of dormers to (e) 3rd fl roof; new bath at 3rd fl; reconfigure of kitchen, living, dining, bedroom and bath areas at 2nd fl new int stiar connection from 2nd to 3rd. replace existing windows. no work on ground floor. | $100,000 |
| Nov 7, 2018 | Completed final sign-off Mar 2019 | 1714 36th Av | remodeling bathroom incl (n) tub, tile work for wall and floor, changing light fixtures. remodeling kitchen incl (n) cabinets, lights, tile work for floorDetails
remodeling bathroom incl (n) tub, tile work for wall and floor, changing light fixtures. remodeling kitchen incl (n) cabinets, lights, tile work for floor | $13,750 |
| Nov 6, 2018 | Completed final sign-off Jul 2021 | 234 Andover St | remove interior fixtures and finishes throughout, no structural work or removl of any structural partitions or elements.Details
remove interior fixtures and finishes throughout, no structural work or removl of any structural partitions or elements. | $5,000 |
| Aug 17, 2018 | Completed final sign-off Mar 2019 | 261 Howth St | 1st floor - add 2 new bedrooms, media room and bathrooms. relocate laundry, furnace and gas tankDetails
1st floor - add 2 new bedrooms, media room and bathrooms. relocate laundry, furnace and gas tank | $36,500 |
| Jul 13, 2018 | Completed final sign-off Aug 2018 | 1591 Jackson St | unit 308: remodeling bathroom, replace old wall/floor tiles, adding 3 recessed lights, replace shower pan (30 sq. ft). no change in wall locationDetails
unit 308: remodeling bathroom, replace old wall/floor tiles, adding 3 recessed lights, replace shower pan (30 sq. ft). no change in wall location | $10,000 |
| Jun 19, 2018 | Completed final sign-off Jul 2018 | 32 Burlwood Dr | bathroom remodel: plumbing work for shower pan and sink, installing 4 recess lights and replacing tile floor and walls. plumbing work will be changing piping. size of bathroom 50 sq ftDetails
bathroom remodel: plumbing work for shower pan and sink, installing 4 recess lights and replacing tile floor and walls. plumbing work will be changing piping. size of bathroom 50 sq ft | $7,500 |
| May 16, 2018 | Completed final sign-off Jul 2018 | 261 Howth St | remodeling (1) bathroom, changing new tiles in bathroom, replacing bath tub and adding (2) lights in bathroom (size of bathroom 5'-7')Details
remodeling (1) bathroom, changing new tiles in bathroom, replacing bath tub and adding (2) lights in bathroom (size of bathroom 5'-7') | $6,500 |
| Apr 4, 2018 | Completed final sign-off May 2018 | 209 20th Av | upstairs - apt. a: remodeling bathroom, replacing old tile wall with fiber glass; replacing tile floor with vinyl in kind remodel (1 bathroom)Details
upstairs - apt. a: remodeling bathroom, replacing old tile wall with fiber glass; replacing tile floor with vinyl in kind remodel (1 bathroom) | $14,500 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 344 Sanchez St | buttom unit only: remodeling bathroom (tile floors, shower pan, recess light) with plumbing and electrical wiringDetails
buttom unit only: remodeling bathroom (tile floors, shower pan, recess light) with plumbing and electrical wiring | $7,650 |
| Jun 30, 2017 | Completed final sign-off Aug 2017 | 1394 Masonic Av | remodel (e) bathroom on 2/f hallway. replace (e) tub, sink, add light & replace plumbing.Details
remodel (e) bathroom on 2/f hallway. replace (e) tub, sink, add light & replace plumbing. | $5,300 |
| Jun 30, 2017 | Completed final sign-off Oct 2017 | 403 Main St | remodel 2 bathrooms & 1 kitchen. add recess lights, cabinents for kitchen. 1 shower pan for 1 bathroom, 1 tub for other bathroom, install wall tile for each one.Details
remodel 2 bathrooms & 1 kitchen. add recess lights, cabinents for kitchen. 1 shower pan for 1 bathroom, 1 tub for other bathroom, install wall tile for each one. | $25,000 |
| Jun 2, 2017 | Completed final sign-off Aug 2017 | 1394 Masonic Av | remodel bathroom: new tiles, shower pan, recessed lights. no walls moveds, removed, added or infilled. all (e) layouts to remain unchanged.Details
remodel bathroom: new tiles, shower pan, recessed lights. no walls moveds, removed, added or infilled. all (e) layouts to remain unchanged. | $5,300 |
| Sep 7, 2016 | Completed final sign-off Jan 2017 | 264 17th Av | remodeling kitchen like for like, no changes to wallsDetails
remodeling kitchen like for like, no changes to walls | $5,500 |