Back to kitchen remodel contractors
Il Nido Designs Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Dec 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 22 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 3 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2023 | Completed final sign-off Feb 2024 | 2701 Van Ness Av | #401 - 4th flr - renovate kitchen all new cabinets, flooring, countertops, and finishes, upgrade electrical throuout, replace hardwood floors in kind, and built-in cabinet at dining room install two interior doors at (e) openings.Details
#401 - 4th flr - renovate kitchen all new cabinets, flooring, countertops, and finishes, upgrade electrical throuout, replace hardwood floors in kind, and built-in cabinet at dining room install two interior doors at (e) openings. | $30,000 |
| Mar 29, 2023 | Completed final sign-off Feb 2024 | 41 Collins St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 2nd fl with 0 shower pan(s). | $65,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 188 Liberty St | all work at lower unit. project includes renovating kitchen, including enlarging opening at wall. new larger paneling door at the yard. renovate bathroom in-kind. add laundry at closet.Details
all work at lower unit. project includes renovating kitchen, including enlarging opening at wall. new larger paneling door at the yard. renovate bathroom in-kind. add laundry at closet. | $45,000 |
| Jul 16, 2019 | Completed final sign-off Jun 2020 | 50 Clayton St | remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout.Details
remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout. | $120,000 |
| Feb 13, 2019 | Never finaled issued Jul 2021, no final | 1012 14th St | horizontal addition at rear. remodel of interior spaces, including kitchen, bedrooms, bathrooms and addition of powder room. 338 sq ft of new habitable space. no s.f.u.s.d fee.Details
horizontal addition at rear. remodel of interior spaces, including kitchen, bedrooms, bathrooms and addition of powder room. 338 sq ft of new habitable space. no s.f.u.s.d fee. | $260,000 |
| Jun 6, 2018 | Completed final sign-off Feb 2019 | 186 Liberty St | all work on upper unit -186 liberty street. renovation upper unit including one bathroom & kitchen; create laundry closet; upgrade all plumbing, electrical, mechanical systems. no structural work.Details
all work on upper unit -186 liberty street. renovation upper unit including one bathroom & kitchen; create laundry closet; upgrade all plumbing, electrical, mechanical systems. no structural work. | $45,000 |