Back to bathroom remodel contractors
Il Nido Designs Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Dec 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 22 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 never finaled. Typically 2 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2023 | Completed final sign-off Apr 2024 | 2427 Lake St | renovate two bathrooms in condominum units, including new laundry hook ups at former stall shower.Details
renovate two bathrooms in condominum units, including new laundry hook ups at former stall shower. | $35,000 |
| Jun 14, 2023 | Completed final sign-off May 2024 | 626 41st Av | revision to permit 202204192474. infill lightwell at 1/f against neighbor blind wall to create master closet. renovate power room at 1/f, modification to rear bedroom layout. renovate master bathroom, new laundry room.Details
revision to permit 202204192474. infill lightwell at 1/f against neighbor blind wall to create master closet. renovate power room at 1/f, modification to rear bedroom layout. renovate master bathroom, new laundry room. | $40,000 |
| Mar 29, 2023 | Completed final sign-off Feb 2024 | 41 Collins St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 2nd fl with 0 shower pan(s). | $65,000 |
| Apr 19, 2022 | Completed final sign-off May 2024 | 626 41st Av | create new master bathroom, old bathroom to become powder room move laundry, install tankless water heater. all work on 1st fl only.Details
create new master bathroom, old bathroom to become powder room move laundry, install tankless water heater. all work on 1st fl only. | $40,000 |
| Feb 14, 2022 | Completed final sign-off Jun 2023 | 3134 Lyon St | convert rear area of existing ground flr into new habitable space. build a new study bathroom & great family room. rebuild the smaller utillity rm. no work on 2nd & 3rd floors. construct (n) 1 hr wall separation between garage & (n) habitable space.Details
convert rear area of existing ground flr into new habitable space. build a new study bathroom & great family room. rebuild the smaller utillity rm. no work on 2nd & 3rd floors. construct (n) 1 hr wall separation between garage & (n) habitable space. | $48,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 188 Liberty St | all work at lower unit. project includes renovating kitchen, including enlarging opening at wall. new larger paneling door at the yard. renovate bathroom in-kind. add laundry at closet.Details
all work at lower unit. project includes renovating kitchen, including enlarging opening at wall. new larger paneling door at the yard. renovate bathroom in-kind. add laundry at closet. | $45,000 |
| Feb 2, 2021 | Completed final sign-off Apr 2021 | 2425 Lake St | remodel 2 (e) bathrooms. no change in layout of walls and openings. maintain 1 hr separation b/t units at area of work.Details
remodel 2 (e) bathrooms. no change in layout of walls and openings. maintain 1 hr separation b/t units at area of work. | $65,000 |
| Jul 16, 2019 | Completed final sign-off Jun 2020 | 50 Clayton St | remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout.Details
remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout. | $120,000 |
| May 21, 2019 | Completed final sign-off Nov 2019 | 49 Alma St | bathroom remodel which includes 12 sq ft addition to eliminate lightwell at new, neighboring blind wallDetails
bathroom remodel which includes 12 sq ft addition to eliminate lightwell at new, neighboring blind wall | $15,000 |
| Feb 13, 2019 | Never finaled issued Jul 2021, no final | 1012 14th St | horizontal addition at rear. remodel of interior spaces, including kitchen, bedrooms, bathrooms and addition of powder room. 338 sq ft of new habitable space. no s.f.u.s.d fee.Details
horizontal addition at rear. remodel of interior spaces, including kitchen, bedrooms, bathrooms and addition of powder room. 338 sq ft of new habitable space. no s.f.u.s.d fee. | $260,000 |
| Jun 6, 2018 | Completed final sign-off Feb 2019 | 186 Liberty St | all work on upper unit -186 liberty street. renovation upper unit including one bathroom & kitchen; create laundry closet; upgrade all plumbing, electrical, mechanical systems. no structural work.Details
all work on upper unit -186 liberty street. renovation upper unit including one bathroom & kitchen; create laundry closet; upgrade all plumbing, electrical, mechanical systems. no structural work. | $45,000 |
| Oct 16, 2017 | Never finaled issued Apr 2018, no final | 1688 42nd Av | addition of dwelling unit at ground flr per ordinance no. 95-17. new unit to be one bedroom, one bathroom with laundry in unit. at existing second flr, convert linen closet to laundry closet.Details
addition of dwelling unit at ground flr per ordinance no. 95-17. new unit to be one bedroom, one bathroom with laundry in unit. at existing second flr, convert linen closet to laundry closet. | $75,000 |
| Sep 26, 2017 | Completed final sign-off Jan 2019 | 165 Vasquez Av | excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powderDetails
excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powder | $225,000 |