Back to kitchen remodel contractors
I Z M C Construction Inc
- Based in
- Ssf
- On San Francisco permits
- Aug 2012 to Sep 2024
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 3 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Jan 2024 | 145 Farragut Av | add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system.Details
add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system. | $100,000 |
| Apr 27, 2017 | Completed final sign-off Aug 2017 | 2427 Cabrillo St | add (n) lightings at kitchen & living room, replace bathroom sink, #2427 second floor.Details
add (n) lightings at kitchen & living room, replace bathroom sink, #2427 second floor. | $3,000 |
| Sep 7, 2016 | Completed final sign-off Nov 2016 | 140 Lunado Wy | remodel (2) baths with new tub, tile, vanity. remodel 1/2 bath with new tile and vanity. replace kitchen counter and tile floorDetails
remodel (2) baths with new tub, tile, vanity. remodel 1/2 bath with new tile and vanity. replace kitchen counter and tile floor | $15,000 |
| Jul 29, 2016 | Completed final sign-off Feb 2017 | 2174 28th Av | kitchen remodeling, replace cabinet and lights, re-use same appliances in same location.Details
kitchen remodeling, replace cabinet and lights, re-use same appliances in same location. | $2,000 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 2829 Judah St | replace fixtures in kitchen & bathroom, add lights in living room on 3/fDetails
replace fixtures in kitchen & bathroom, add lights in living room on 3/f | $10,000 |
| Jul 8, 2014 | Completed final sign-off Dec 2014 | 1345 Silver Av | rearrange & remodel kitchen, stairs & bathroom. add bedroom, 1 bath & skylights on 2nd floor. relcoate bathroom, add 2 full baths, laundry & 3 bedrooms on ground floor. replace garage door & windows per plan. remove illegal kitchen on ground floor.Details
rearrange & remodel kitchen, stairs & bathroom. add bedroom, 1 bath & skylights on 2nd floor. relcoate bathroom, add 2 full baths, laundry & 3 bedrooms on ground floor. replace garage door & windows per plan. remove illegal kitchen on ground floor. | $60,000 |
| Aug 9, 2012 | Completed final sign-off Mar 2013 | 2001 Ocean Av | add deck and stairs. remodel kitchen and bath,add bath on 2nd floor and attic. add 2 bedroom, a family, a story,an office,laundry and 2 bath on the ground floor. replace windows. relocate water heater and furnace.Details
add deck and stairs. remodel kitchen and bath,add bath on 2nd floor and attic. add 2 bedroom, a family, a story,an office,laundry and 2 bath on the ground floor. replace windows. relocate water heater and furnace. | $99,000 |