I Z M C Construction Inc
- Based in
- Ssf
- On San Francisco permits
- Aug 2012 to Sep 2024
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 11 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Jan 2024 | 145 Farragut Av | add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system.Details
add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system. | $100,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2016 | 3801 San Bruno Av | comply w/complaint #201617011 - repair rear yard wood deck dryrot & stair tread less than 5% of structural. everythin is in the back yard.Details
comply w/complaint #201617011 - repair rear yard wood deck dryrot & stair tread less than 5% of structural. everythin is in the back yard. | $550 |
| Feb 12, 2016 | Completed final sign-off Dec 2020 | 1154 Kearny St | conversion of existing above grade under floor area into an additional dwelling unit per ordinance 30-15. refer to permit 2016-02-12-9556 for soft story work. repair/replacement of (e) windows. repair (e) deck waterproofing, repair (e) rail. sprinkler deferred.Details
conversion of existing above grade under floor area into an additional dwelling unit per ordinance 30-15. refer to permit 2016-02-12-9556 for soft story work. repair/replacement of (e) windows. repair (e) deck waterproofing, repair (e) rail. sprinkler deferred. | $20,000 |
| Aug 9, 2012 | Completed final sign-off Mar 2013 | 2001 Ocean Av | add deck and stairs. remodel kitchen and bath,add bath on 2nd floor and attic. add 2 bedroom, a family, a story,an office,laundry and 2 bath on the ground floor. replace windows. relocate water heater and furnace.Details
add deck and stairs. remodel kitchen and bath,add bath on 2nd floor and attic. add 2 bedroom, a family, a story,an office,laundry and 2 bath on the ground floor. replace windows. relocate water heater and furnace. | $99,000 |