I C D Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2019 to Dec 2024
- Last 24 months
- 2 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2024 | Completed final sign-off May 2025 | 1776 Sacramento St | add an enclosure box for the hot water recirculation pump, add access door for the pump, add new dedicated powerline for new recirculation pump on 7th floor stairs.Details
add an enclosure box for the hot water recirculation pump, add access door for the pump, add new dedicated powerline for new recirculation pump on 7th floor stairs. | $7,000 |