I C D Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2019 to Dec 2024
- Last 24 months
- 2 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2024 | Completed final sign-off May 2025 | 1776 Sacramento St | add an enclosure box for the hot water recirculation pump, add access door for the pump, add new dedicated powerline for new recirculation pump on 7th floor stairs.Details
add an enclosure box for the hot water recirculation pump, add access door for the pump, add new dedicated powerline for new recirculation pump on 7th floor stairs. | $7,000 |
| Dec 19, 2024 | Completed final sign-off Mar 2025 | 411 Green St | unit 4b: kitchen: replace countertops, sink, faucet, new appliances. bathroom: replace floor tile, new ceiling fan, add outlet for bidet new top and sink for vanity. new baseboard and new flooring entire apt.Details
unit 4b: kitchen: replace countertops, sink, faucet, new appliances. bathroom: replace floor tile, new ceiling fan, add outlet for bidet new top and sink for vanity. new baseboard and new flooring entire apt. | $20,000 |
| May 6, 2024 | Completed final sign-off Sep 2024 | 1776 Sacramento St | kitchen remodeling - stove and sink same location. new appliances, new electrical panel same location, new recessed lights, partial new floor.Details
kitchen remodeling - stove and sink same location. new appliances, new electrical panel same location, new recessed lights, partial new floor. | $50,000 |
| Jan 29, 2024 | Completed final sign-off Aug 2024 | 115 Kimball Pl | (1) kitchen remodel, 2x bathrooms remodel, electrical panel upgrade, recessed led lightsDetails
(1) kitchen remodel, 2x bathrooms remodel, electrical panel upgrade, recessed led lights | $49,000 |
| May 31, 2023 | Completed final sign-off Aug 2023 | 1776 Sacramento St | unit # 709: kitchen remodel in kind - replace floor, cabinets, countertop in kind and add recessed led cans. 2 bathroom remodel in kind - replace vanity and toilets. maintain 1 hr rated ceiling. no structural work. no floor layout changes. no wall layout changes.Details
unit # 709: kitchen remodel in kind - replace floor, cabinets, countertop in kind and add recessed led cans. 2 bathroom remodel in kind - replace vanity and toilets. maintain 1 hr rated ceiling. no structural work. no floor layout changes. no wall layout changes. | $26,000 |
| Apr 14, 2021 | Completed final sign-off Nov 2021 | 425 01st St | bathroom remodeling, partial kitchen remodeling, new floors, lights, all kitchen cabinets remains.Details
bathroom remodeling, partial kitchen remodeling, new floors, lights, all kitchen cabinets remains. | $25,000 |
| Jan 22, 2021 | Completed final sign-off Oct 2022 | 1776 Sacramento St | full kitchen and bathroom remodel. electrical panel upgrade. kitchen, master and guest bathroom remodel.Details
full kitchen and bathroom remodel. electrical panel upgrade. kitchen, master and guest bathroom remodel. | $46,000 |
| Nov 30, 2020 | Completed final sign-off May 2021 | 1776 Sacramento St | unit#402: bathroom remodel (guest), no layout change.Details
unit#402: bathroom remodel (guest), no layout change. | $12,000 |
| Sep 18, 2020 | Completed final sign-off Dec 2020 | 1776 Sacramento St | apt 402: bathroom remodel in kind.Details
apt 402: bathroom remodel in kind. | $16,500 |
| Feb 4, 2020 | Completed final sign-off Apr 2020 | 3104 25th St | bathroom remodel. electrical upgrade, no moving of walls or doorsDetails
bathroom remodel. electrical upgrade, no moving of walls or doors | $16,000 |
| Dec 17, 2019 | Completed final sign-off Feb 2020 | 3679 20th St | patch and repair approx 6 inches of stucco around existing window openings. stucco damaged during window replacement.Details
patch and repair approx 6 inches of stucco around existing window openings. stucco damaged during window replacement. | $15,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 3679 20th St | replace 12 windows at front, 4 at rear, 3 at the side with new aluminum windows. front windows at second floor will be full casement/picture/full casement (extending the height of the opening). revision to 201907186333Details
replace 12 windows at front, 4 at rear, 3 at the side with new aluminum windows. front windows at second floor will be full casement/picture/full casement (extending the height of the opening). revision to 201907186333 | $8,500 |
| Jul 18, 2019 | Completed final sign-off Nov 2019 | 3679 20th St | remodel 2 kitchen and 3 bathroom on 2nd and 3rd floor. same layout. electrical upgrad. no moving of walls.Details
remodel 2 kitchen and 3 bathroom on 2nd and 3rd floor. same layout. electrical upgrad. no moving of walls. | $50,000 |