Back to kitchen remodel contractors
Hughes Mcginnis Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to May 2014
- Last 24 months
- 0 permits filed
37 permits since 2000: 33 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2012 | Completed final sign-off Nov 2015 | 925 Larkin St | no chaange in use, no change in footprint. add 1 accessible bathroom, add 1 accessible kitchenette, replace windows on 2nd floor (some are visible from the street)Details
no chaange in use, no change in footprint. add 1 accessible bathroom, add 1 accessible kitchenette, replace windows on 2nd floor (some are visible from the street) | $58,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 2945 Pacific Av | remodel kitchen-replace cabinets, countertops, flring, appliances. remodel bathroom-replace fixtures, tile, shower, door. no structural changes, 6x10 bathroom, 12x12 kitchen. lighting must comply with cec 150(k). no walls/doors/windows under this permit. comply with c.o alarms per cbc-2010 sec 420.4Details
remodel kitchen-replace cabinets, countertops, flring, appliances. remodel bathroom-replace fixtures, tile, shower, door. no structural changes, 6x10 bathroom, 12x12 kitchen. lighting must comply with cec 150(k). no walls/doors/windows under this permit. comply with c.o alarms per cbc-2010 sec 420.4 | $40,000 |
| Feb 9, 2011 | Completed final sign-off Jun 2011 | 2949 Pacific Av | legalize unit 2949-b. add kitchen approved variance #2010.08.04v.Details
legalize unit 2949-b. add kitchen approved variance #2010.08.04v. | $20,000 |
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 1016 Pierce St | kitchen remodel on 2nd fl. dem (e0 cabinetry, finishes and pantry. move one (e) framed opening in non bearing wall.install 1 new window not cisible from street. install nea cabinetry, finishes, plumbing and electrical for kitchenDetails
kitchen remodel on 2nd fl. dem (e0 cabinetry, finishes and pantry. move one (e) framed opening in non bearing wall.install 1 new window not cisible from street. install nea cabinetry, finishes, plumbing and electrical for kitchen | $10,000 |
| Nov 17, 2009 | Completed final sign-off Jul 2010 | 95 26th Av | apt "c" interior remodel to (e) condo- new interior, ext doors, new lighting, plbg fixture repalcement, kitchen & maste bath remodel, new wood floors.Details
apt "c" interior remodel to (e) condo- new interior, ext doors, new lighting, plbg fixture repalcement, kitchen & maste bath remodel, new wood floors. | $200,000 |
| May 9, 2008 | Completed final sign-off Aug 2008 | 486 Andover St | remodel kitchen. replace 4 windows, some visable from the street. 1 door, replace cabinets. countertops, appliances, flooring, patch dry wall.Details
remodel kitchen. replace 4 windows, some visable from the street. 1 door, replace cabinets. countertops, appliances, flooring, patch dry wall. | $20,000 |
| Mar 1, 2007 | Completed final sign-off May 2007 | 127 Corbett Av | kitchen remodel in existing space. no structural walls removedDetails
kitchen remodel in existing space. no structural walls removed | $13,372 |
| Sep 29, 2006 | Completed final sign-off Dec 2006 | 1316 Leavenworth St | new appliances, counterops, cabinets, lighting & some plumbing work & some electrical for kitchen remodel 50& high efficancy lighting.Details
new appliances, counterops, cabinets, lighting & some plumbing work & some electrical for kitchen remodel 50& high efficancy lighting. | $60,000 |
| Jun 27, 2006 | Completed final sign-off Sep 2006 | 62 Buena Vista Tr | remodel kitchen and conversion of closet to laundry room.Details
remodel kitchen and conversion of closet to laundry room. | $15,000 |
| Jun 10, 2005 | Completed final sign-off Oct 2005 | 2111 Hyde St | remodel kitchen, remove non-bearing walls, tile, add electrical fixtures, relocate refigerator & walDetails
remodel kitchen, remove non-bearing walls, tile, add electrical fixtures, relocate refigerator & wal | $25,000 |
| Apr 7, 2005 | Completed final sign-off Oct 2005 | 777 Page St | kitchen renovationDetails
kitchen renovation | $37,621 |