Back to bathroom remodel contractors
Hughes Mcginnis Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to May 2014
- Last 24 months
- 0 permits filed
37 permits since 2000: 33 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2012 | Completed final sign-off Nov 2015 | 925 Larkin St | no chaange in use, no change in footprint. add 1 accessible bathroom, add 1 accessible kitchenette, replace windows on 2nd floor (some are visible from the street)Details
no chaange in use, no change in footprint. add 1 accessible bathroom, add 1 accessible kitchenette, replace windows on 2nd floor (some are visible from the street) | $58,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 2945 Pacific Av | remodel kitchen-replace cabinets, countertops, flring, appliances. remodel bathroom-replace fixtures, tile, shower, door. no structural changes, 6x10 bathroom, 12x12 kitchen. lighting must comply with cec 150(k). no walls/doors/windows under this permit. comply with c.o alarms per cbc-2010 sec 420.4Details
remodel kitchen-replace cabinets, countertops, flring, appliances. remodel bathroom-replace fixtures, tile, shower, door. no structural changes, 6x10 bathroom, 12x12 kitchen. lighting must comply with cec 150(k). no walls/doors/windows under this permit. comply with c.o alarms per cbc-2010 sec 420.4 | $40,000 |
| Apr 29, 2011 | Completed final sign-off Aug 2011 | 1316 Leavenworth St | remodel 3rd fl bedroom, bath, and 1/2 bath. no changes in square footage or expansion of building envelopeDetails
remodel 3rd fl bedroom, bath, and 1/2 bath. no changes in square footage or expansion of building envelope | $20,000 |
| Nov 17, 2009 | Completed final sign-off Jul 2010 | 95 26th Av | apt "c" interior remodel to (e) condo- new interior, ext doors, new lighting, plbg fixture repalcement, kitchen & maste bath remodel, new wood floors.Details
apt "c" interior remodel to (e) condo- new interior, ext doors, new lighting, plbg fixture repalcement, kitchen & maste bath remodel, new wood floors. | $200,000 |
| Feb 27, 2006 | Completed final sign-off May 2006 | 2111 Hyde St | remodel 1 (e) bathroom. replace tub, shower, tile, countertop. no changes to structure. non- structrual.Details
remodel 1 (e) bathroom. replace tub, shower, tile, countertop. no changes to structure. non- structrual. | $20,000 |
| Jan 17, 2006 | Completed final sign-off Mar 2006 | 144 Laidley St | 1 bath remodel, replace toilet, tub, sink, tile, 2 windows, same size and location. no structural changesDetails
1 bath remodel, replace toilet, tub, sink, tile, 2 windows, same size and location. no structural changes | $20,000 |
| Sep 14, 2004 | Completed final sign-off Dec 2004 | 127 Corbett Av | bathroom remodel replace tub toilet sink tile no structural changesDetails
bathroom remodel replace tub toilet sink tile no structural changes | $12,000 |