Back to kitchen remodel contractors
Hudson Builders
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to May 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2024 | Completed final sign-off May 2025 | 180 Monterey Bl | kitchen remodel. remove kitchen interior - cabinet, conters, drywall, electrical,. update electrical, plumbing. new drywall, innsulation, cabinets, counters, paint & flooring. all in kind.Details
kitchen remodel. remove kitchen interior - cabinet, conters, drywall, electrical,. update electrical, plumbing. new drywall, innsulation, cabinets, counters, paint & flooring. all in kind. | $30,000 |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 178 Monterey Bl | submission of drawings for approval of kitchen doorway alterations. re: kitchen remodel: ref pa# 202204142219Details
submission of drawings for approval of kitchen doorway alterations. re: kitchen remodel: ref pa# 202204142219 | $500 |
| Apr 14, 2022 | Never finaled issued Apr 2022, no final | 178 Monterey Bl | kitchen remodel: remove cabinets, sheetrock and insulation. install new electrical and plumbing as needed. new cabinets,counters, sheetrock & insulation. replace vinyl flooring, paint and trim.Details
kitchen remodel: remove cabinets, sheetrock and insulation. install new electrical and plumbing as needed. new cabinets,counters, sheetrock & insulation. replace vinyl flooring, paint and trim. | $25,000 |
| Feb 4, 2021 | Completed final sign-off Sep 2021 | 75 Morningside Dr | remove cabinets, drywall, fixtures. update electrical, plumbing, insulate walls. install new drywall, cabinets, counters and paint in the kitchen.Details
remove cabinets, drywall, fixtures. update electrical, plumbing, insulate walls. install new drywall, cabinets, counters and paint in the kitchen. | $30,000 |
| Aug 4, 2015 | Completed final sign-off Sep 2015 | 3402 Clay St | remove (3) existing windows on the back of the house and replace them with new insulated ones. in kitchen. n/a maher ord. 155-13Details
remove (3) existing windows on the back of the house and replace them with new insulated ones. in kitchen. n/a maher ord. 155-13 | $6,800 |
| Oct 20, 2010 | Completed final sign-off Aug 2011 | 31 Justin Dr | demo kitchen, breakfast nook, bath. replace elect. & plumbing (as needed). (n) kit. cabinets, counter sheetrock, insulation paint. (n) tub, vanity & tile paint & insulation & sheetrock in bath.Details
demo kitchen, breakfast nook, bath. replace elect. & plumbing (as needed). (n) kit. cabinets, counter sheetrock, insulation paint. (n) tub, vanity & tile paint & insulation & sheetrock in bath. | $28,000 |
| Jun 8, 2010 | Completed final sign-off May 2015 | 1020 Union St | remove & replace (1) kitchen & (1) bath cabinets & fixtures, install new lighting, phone, cable & data wire, sand hardwood floors, paint, repl sheetrock & insulation as necessary, bathrm retile & wall and floor, no structural workDetails
remove & replace (1) kitchen & (1) bath cabinets & fixtures, install new lighting, phone, cable & data wire, sand hardwood floors, paint, repl sheetrock & insulation as necessary, bathrm retile & wall and floor, no structural work | $18,500 |
| Feb 27, 2003 | Completed final sign-off Jun 2003 | 319 Harkness Av | remodel 3 baths. fixts & tile,kitchen counter,doors & molding. install new smoke detectors in hall &Details
remodel 3 baths. fixts & tile,kitchen counter,doors & molding. install new smoke detectors in hall & | $20,000 |
| May 9, 2000 | Completed final sign-off Jan 2001 | 436 Pacheco St | kitchen remodelDetails
kitchen remodel | $28,500 |
| Feb 29, 2000 | Completed final sign-off Jun 2000 | 1998 Broadway | kitchen remodeling, replace plumbing, fixtures and appliancesDetails
kitchen remodeling, replace plumbing, fixtures and appliances | |
| Jan 5, 2000 | Completed final sign-off Jul 2000 | 3402 Clay St | remove & replace kitchen cabinets,lath/plaster to 5/8 drywall,new counters,appliancesDetails
remove & replace kitchen cabinets,lath/plaster to 5/8 drywall,new counters,appliances | $28,000 |