Back to bathroom remodel contractors
Hudson Builders
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to May 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2010 | Completed final sign-off Aug 2011 | 31 Justin Dr | demo kitchen, breakfast nook, bath. replace elect. & plumbing (as needed). (n) kit. cabinets, counter sheetrock, insulation paint. (n) tub, vanity & tile paint & insulation & sheetrock in bath.Details
demo kitchen, breakfast nook, bath. replace elect. & plumbing (as needed). (n) kit. cabinets, counter sheetrock, insulation paint. (n) tub, vanity & tile paint & insulation & sheetrock in bath. | $28,000 |
| Jun 8, 2010 | Completed final sign-off May 2015 | 1020 Union St | remove & replace (1) kitchen & (1) bath cabinets & fixtures, install new lighting, phone, cable & data wire, sand hardwood floors, paint, repl sheetrock & insulation as necessary, bathrm retile & wall and floor, no structural workDetails
remove & replace (1) kitchen & (1) bath cabinets & fixtures, install new lighting, phone, cable & data wire, sand hardwood floors, paint, repl sheetrock & insulation as necessary, bathrm retile & wall and floor, no structural work | $18,500 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 122 Del Vale Av | bath remodel: remove fixtures, tile, sheetrock. install new plumbing, electrical, repair dryrot (if necessary), new fixtures, tile, sheetrodck, molding & paint. insulation in exterior walls & ceiling. no structural change.Details
bath remodel: remove fixtures, tile, sheetrock. install new plumbing, electrical, repair dryrot (if necessary), new fixtures, tile, sheetrodck, molding & paint. insulation in exterior walls & ceiling. no structural change. | $12,000 |
| Feb 27, 2003 | Completed final sign-off Jun 2003 | 319 Harkness Av | remodel 3 baths. fixts & tile,kitchen counter,doors & molding. install new smoke detectors in hall &Details
remodel 3 baths. fixts & tile,kitchen counter,doors & molding. install new smoke detectors in hall & | $20,000 |