Back to kitchen remodel contractors
Ht Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
- Last 24 months
- 6 permits filed
73 permits since 2000: 53 completed, 5 in progress, 15 never finaled.
Of the 15 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 27 completed, 1 in progress, 4 never finaled. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 500 Head St | expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft.Details
expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft. | $100,000 |
| Jan 30, 2025 | Completed final sign-off Sep 2025 | 225 Rutland St | rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair.Details
rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair. | $60,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 126 Ralston St | to comply w/ nov 202031364. legalize kitcheneette at g/f. replace 4 burner stove to 2 burner cooktop wlo oven. ref to 7706452. new storage in garageDetails
to comply w/ nov 202031364. legalize kitcheneette at g/f. replace 4 burner stove to 2 burner cooktop wlo oven. ref to 7706452. new storage in garage | $12,000 |
| Nov 15, 2022 | Completed final sign-off Apr 2023 | 70 Lupine Av | apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992Details
apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992 | $15,000 |
| Sep 15, 2022 | Completed final sign-off Apr 2023 | 1150 Greenwich St | apt 4: 1 kitchen and 1 bathroom remodelDetails
apt 4: 1 kitchen and 1 bathroom remodel | $28,000 |
| Jul 7, 2022 | Completed final sign-off Nov 2024 | 2016 Taylor St | one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structuralDetails
one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structural | $35,000 |
| Apr 4, 2022 | Completed final sign-off Oct 2022 | 1 Wood St | (apt 4, 5, 8) kitchen and bathroom remodelDetails
(apt 4, 5, 8) kitchen and bathroom remodel | $50,000 |
| Dec 10, 2021 | Completed final sign-off May 2022 | 1525 Powell St | 1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit.Details
1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit. | $25,000 |
| Feb 23, 2021 | Never finaled issued Jul 2021, no final | 250 03rd Av | remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit.Details
remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit. | $42,000 |
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 30 Salmon St | kitchen remodel, new electric subpanel, rewire whole unit. remodel in-kind.Details
kitchen remodel, new electric subpanel, rewire whole unit. remodel in-kind. | $18,000 |
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 50 Lupine Av | apts 10 & 11: each unit: changing the kitchen caibnets, countertop; changing bathtub and tile.Details
apts 10 & 11: each unit: changing the kitchen caibnets, countertop; changing bathtub and tile. | $18,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 50 Lupine Av | changing kitchen cabinets & counter top, bat tub & tileDetails
changing kitchen cabinets & counter top, bat tub & tile | $12,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 1 Wood St | apartment #11. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7).Details
apartment #11. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7). | $7,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 70 Lupine Av | apartment 6. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7).Details
apartment 6. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7). | $7,000 |
| Nov 13, 2018 | Completed final sign-off Mar 2019 | 1288 17th Av | apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors.Details
apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors. | $18,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 2022 Taylor St | remodel kitchen & bathroom. no changes on walls.Details
remodel kitchen & bathroom. no changes on walls. | $18,000 |
| Feb 22, 2018 | Completed final sign-off Aug 2018 | 50 Lupine Av | apt. #4: kitchen remodel and install new electrical sub-panelDetails
apt. #4: kitchen remodel and install new electrical sub-panel | $8,000 |
| Feb 22, 2018 | Completed final sign-off Sep 2018 | 2022 Taylor St | #2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heaterDetails
#2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heater | $18,000 |
| Jan 5, 2018 | Completed final sign-off Sep 2018 | 1288 17th Av | apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartmentDetails
apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartment | $17,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 50 Lupine Av | apt 3 - kitchen & bath remodel; apt 12 - kitchen remodelDetails
apt 3 - kitchen & bath remodel; apt 12 - kitchen remodel | $20,000 |
| Aug 15, 2017 | Completed final sign-off Mar 2018 | 1 Wood St | #7 - kitchen remodelDetails
#7 - kitchen remodel | $7,000 |
| Jul 26, 2017 | Completed final sign-off Jan 2020 | 643 38th Av | project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st).Details
project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st). | $25,000 |
| Jul 17, 2017 | Completed final sign-off Mar 2018 | 1 Wood St | unit #6: kitchen remodel and electrical subpanel.Details
unit #6: kitchen remodel and electrical subpanel. | $8,000 |
| Jul 5, 2017 | Never finaled issued Jul 2017, no final | 1722 17th Av | kitchen remodel, add (n) electrical subpanel.Details
kitchen remodel, add (n) electrical subpanel. | $16,000 |
| Jan 26, 2017 | Completed final sign-off Aug 2017 | 70 Lupine Av | apt #1 #3 remodel kitchen - new sink, new cabinets, new tile floor, like for like.Details
apt #1 #3 remodel kitchen - new sink, new cabinets, new tile floor, like for like. | $24,000 |
| Jun 20, 2016 | Completed final sign-off Oct 2016 | 1 Wool St | unit#12 remodel kitchen & install new sub panel.Details
unit#12 remodel kitchen & install new sub panel. | $16,000 |
| Jun 20, 2016 | Completed final sign-off Oct 2016 | 50 Lupine Av | unit# 8 remodel kitchen & install new sub panel.Details
unit# 8 remodel kitchen & install new sub panel. | $16,000 |
| Apr 25, 2016 | Completed final sign-off Jul 2016 | 1026 Montgomery St | remodel kitchen and bathroom install new subpanel, light in hall way.Details
remodel kitchen and bathroom install new subpanel, light in hall way. | $25,000 |
| Oct 23, 2015 | Completed final sign-off May 2016 | 50 Lupine Av | unit #1: remodel kitchen: new cabinets, sink, tile floor.Details
unit #1: remodel kitchen: new cabinets, sink, tile floor. | $12,000 |
| Aug 21, 2015 | Never finaled issued Dec 2015, no final | 1 Oak Park Dr | (e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement.Details
(e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement. | $85,000 |
| Mar 23, 2015 | Completed final sign-off Jul 2015 | 302 23rd Av | remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only.Details
remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only. | $25,000 |
| Feb 12, 2015 | Completed final sign-off Apr 2015 | 324 Balboa St | to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen.Details
to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen. | $2,000 |