Back to bathroom remodel contractors
Ht Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
- Last 24 months
- 6 permits filed
73 permits since 2000: 53 completed, 5 in progress, 15 never finaled.
Of the 15 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 24 completed, 1 in progress, 4 never finaled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 500 Head St | expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft.Details
expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft. | $100,000 |
| Jan 30, 2025 | Completed final sign-off Sep 2025 | 225 Rutland St | rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair.Details
rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair. | $60,000 |
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 2258 35th Av | convert (e) bonus room to 1 bedroom& 1 full bathroom on 1/f.Details
convert (e) bonus room to 1 bedroom& 1 full bathroom on 1/f. | $20,000 |
| Aug 21, 2023 | Completed final sign-off Mar 2024 | 108 Waverly Pl | interior remodel, propose to upgrade the (e) bathroom with new fixtures at same location, add one new door to access to the office, replacing the (e) water heater, replacing flooring and new paint to the interior of the 3rd fl. unitDetails
interior remodel, propose to upgrade the (e) bathroom with new fixtures at same location, add one new door to access to the office, replacing the (e) water heater, replacing flooring and new paint to the interior of the 3rd fl. unit | $17,000 |
| May 19, 2023 | Completed final sign-off Aug 2023 | 1275 26th Av | bathroom remodel in upstairs. in kind remodelDetails
bathroom remodel in upstairs. in kind remodel | $10,000 |
| Dec 7, 2022 | Completed final sign-off Feb 2024 | 243 Peabody St | add 1 bedroom, 1 full bathroom at ground floor.Details
add 1 bedroom, 1 full bathroom at ground floor. | $35,000 |
| Nov 15, 2022 | Completed final sign-off Apr 2023 | 70 Lupine Av | apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992Details
apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992 | $15,000 |
| Sep 23, 2022 | Completed final sign-off Oct 2023 | 373 Rolph St | add 1 bedroom, and 1 family room at g/f. approx 271 sq ft. replace 2 windows, one in the back and one on left side of bldg. replace existing tank water heater to tankless water heater. remodel existing bathroom at g/fDetails
add 1 bedroom, and 1 family room at g/f. approx 271 sq ft. replace 2 windows, one in the back and one on left side of bldg. replace existing tank water heater to tankless water heater. remodel existing bathroom at g/f | $50,000 |
| Sep 15, 2022 | Completed final sign-off Apr 2023 | 1150 Greenwich St | apt 4: 1 kitchen and 1 bathroom remodelDetails
apt 4: 1 kitchen and 1 bathroom remodel | $28,000 |
| Jul 7, 2022 | Completed final sign-off Nov 2024 | 2016 Taylor St | one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structuralDetails
one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structural | $35,000 |
| Apr 4, 2022 | Completed final sign-off Oct 2022 | 1 Wood St | (apt 4, 5, 8) kitchen and bathroom remodelDetails
(apt 4, 5, 8) kitchen and bathroom remodel | $50,000 |
| Dec 10, 2021 | Completed final sign-off May 2022 | 1525 Powell St | 1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit.Details
1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit. | $25,000 |
| Nov 2, 2021 | Never finaled issued Nov 2021, no final | 135 Middlefield Dr | one bath room remodel on 1/f, non structural.Details
one bath room remodel on 1/f, non structural. | $8,000 |
| Feb 23, 2021 | Never finaled issued Jul 2021, no final | 250 03rd Av | remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit.Details
remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit. | $42,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1 Wood St | unit # 2: partial bathroom remodel: change bathtub and tile install new electrical sub panell in the unit.Details
unit # 2: partial bathroom remodel: change bathtub and tile install new electrical sub panell in the unit. | $6,000 |
| Nov 13, 2018 | Completed final sign-off Mar 2019 | 1288 17th Av | apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors.Details
apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors. | $18,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 2022 Taylor St | remodel kitchen & bathroom. no changes on walls.Details
remodel kitchen & bathroom. no changes on walls. | $18,000 |
| Feb 22, 2018 | Completed final sign-off Sep 2018 | 2022 Taylor St | #2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heaterDetails
#2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heater | $18,000 |
| Jan 5, 2018 | Completed final sign-off Sep 2018 | 1288 17th Av | apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartmentDetails
apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartment | $17,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 50 Lupine Av | apt 3 - kitchen & bath remodel; apt 12 - kitchen remodelDetails
apt 3 - kitchen & bath remodel; apt 12 - kitchen remodel | $20,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2017 | 1282 34th Av | remodel bathroom.Details
remodel bathroom. | $14,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2018 | 270 Ramsell St | expand/remodel (e) bathroom by infilling (e) lightwell at the 2nd flr. modify (e) front facade.Details
expand/remodel (e) bathroom by infilling (e) lightwell at the 2nd flr. modify (e) front facade. | $17,800 |
| Apr 25, 2016 | Completed final sign-off Jul 2016 | 1026 Montgomery St | remodel kitchen and bathroom install new subpanel, light in hall way.Details
remodel kitchen and bathroom install new subpanel, light in hall way. | $25,000 |
| Mar 1, 2016 | Completed final sign-off May 2026 | 50 Lupine Av | apt #1: rev. pa#201510230682 - remodel (e) 1 bathroom in-kind.Details
apt #1: rev. pa#201510230682 - remodel (e) 1 bathroom in-kind. | $6,000 |
| Aug 21, 2015 | Never finaled issued Dec 2015, no final | 1 Oak Park Dr | (e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement.Details
(e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement. | $85,000 |
| May 11, 2015 | Completed final sign-off Oct 2015 | 1426 Ortega St | bathroom remodel, same configuration, no structural work.Details
bathroom remodel, same configuration, no structural work. | $7,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 914 Union St | remodel bathroom, tile floor, new sink & faucet, install new water heater, install granite counter top & faucet in (e). no walls moved, removed or added, all layouts to remain unchanged.Details
remodel bathroom, tile floor, new sink & faucet, install new water heater, install granite counter top & faucet in (e). no walls moved, removed or added, all layouts to remain unchanged. | $3,000 |
| Mar 23, 2015 | Completed final sign-off Jul 2015 | 302 23rd Av | remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only.Details
remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only. | $25,000 |
| Feb 12, 2015 | Completed final sign-off Apr 2015 | 324 Balboa St | to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen.Details
to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen. | $2,000 |