Hp Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2018 to Oct 2026
- Last 24 months
- 34 permits filed
79 permits since 2000: 71 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 192 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | 1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural.Details
1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural. | $65,000 |
| Feb 17, 2023 | Completed final sign-off Oct 2024 | 177 Stillman St | remove small mezzanine & wood stairs to large mezzxanine, provide door to large mezz, remove door to (e)office, enlarge opening/replace w/accessible door, replace broken window panes in-kind & (e)garage door, install warehouse storage racks, provide new sink, casework & refrigeratorDetails
remove small mezzanine & wood stairs to large mezzxanine, provide door to large mezz, remove door to (e)office, enlarge opening/replace w/accessible door, replace broken window panes in-kind & (e)garage door, install warehouse storage racks, provide new sink, casework & refrigerator | $150,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2022 | 5050 Mission St | shell & core improvement in ground fl vacant retail sapce. add ada bathrooms. install mezzanine, stairs to mezzanine. level floor with street. provide wheelchair lift. add 2nd exit.Details
shell & core improvement in ground fl vacant retail sapce. add ada bathrooms. install mezzanine, stairs to mezzanine. level floor with street. provide wheelchair lift. add 2nd exit. | $800,000 |