Back to kitchen remodel contractors
Hong Lee Construction Co Inc
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2014 to Jun 2019
- Last 24 months
- 0 permits filed
38 permits since 2000: 29 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 16 completed, 1 never finaled. Typically 8 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2019 | Completed final sign-off Apr 2021 | 1379 44th Av | unit 1379: remodel 1 kitchen & 2 bathrooms, lights per 150.0(k), replace 1 furnace & water heater lights per 150.0 80% ef. unit 1381: remodel 1 kitchen & 2 bathrooms repace 1 furnace & water heater.Details
unit 1379: remodel 1 kitchen & 2 bathrooms, lights per 150.0(k), replace 1 furnace & water heater lights per 150.0 80% ef. unit 1381: remodel 1 kitchen & 2 bathrooms repace 1 furnace & water heater. | $105,000 |
| Feb 21, 2019 | Completed final sign-off Jul 2019 | 5211 Mission St | revision to 201611072097 remodeling kitchen at units. add 1 bedroom with closet (sub divide from (e) living)//vif emergency escape and rescue window in the new bedroomDetails
revision to 201611072097 remodeling kitchen at units. add 1 bedroom with closet (sub divide from (e) living)//vif emergency escape and rescue window in the new bedroom | $12,000 |
| Oct 31, 2018 | Completed final sign-off May 2019 | 2936 Divisadero St | remodel of interior of one unit in 2 unit bldg. kitchen to relocated to the existing dining room to create a 4th bedroom, where old kitchen was. the existing powder room & closet revised to create new full bath & powder room. no expansion of bldg envelope or heated area.Details
remodel of interior of one unit in 2 unit bldg. kitchen to relocated to the existing dining room to create a 4th bedroom, where old kitchen was. the existing powder room & closet revised to create new full bath & powder room. no expansion of bldg envelope or heated area. | $168,000 |
| Jun 29, 2018 | Completed final sign-off Sep 2018 | 439 Campbell Av | kitchen remodel in-kind. new range hood to vent to exterior. install new gas line for stove at same location. re-tile leaking shower stall. plumb-in shower faucet, replace vanity, new lighting to be h.fDetails
kitchen remodel in-kind. new range hood to vent to exterior. install new gas line for stove at same location. re-tile leaking shower stall. plumb-in shower faucet, replace vanity, new lighting to be h.f | $15,000 |
| Jan 11, 2018 | Completed final sign-off Dec 2019 | 546 19th Av | this is a conforming rear addition to a single fam residence. there are no changes to the front of the bldg. the addition is on the 1st and 2nd fl. 3rd fl remains the same. a lightwell has been introduced for the neighbors window. a kitchen will be renovated and a bath added to the 1st fl.Details
this is a conforming rear addition to a single fam residence. there are no changes to the front of the bldg. the addition is on the 1st and 2nd fl. 3rd fl remains the same. a lightwell has been introduced for the neighbors window. a kitchen will be renovated and a bath added to the 1st fl. | $230,000 |
| Jan 5, 2018 | Never finaled issued Apr 2018, no final | 1116 Pacific Av | enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building.Details
enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building. | $95,000 |
| Sep 18, 2017 | Completed final sign-off Sep 2019 | 1417 Mason St | remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heaterDetails
remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heater | $50,000 |
| Aug 30, 2017 | Completed final sign-off Oct 2018 | 574 Filbert St | remodel existing 1st floor front apartment unit with new kitchen & bathroom. install one new beam with footing plus new plywood sheating to adjacent wall to match removal of nearby wall.Details
remodel existing 1st floor front apartment unit with new kitchen & bathroom. install one new beam with footing plus new plywood sheating to adjacent wall to match removal of nearby wall. | $40,000 |
| Nov 7, 2016 | Completed final sign-off Dec 2019 | 5211 Mission St | unit legalization 43-14. legalization of unit installed without permit. legalization (e) kitchen and convert (e) heater rm into bedroom. all work at ground flr.Details
unit legalization 43-14. legalization of unit installed without permit. legalization (e) kitchen and convert (e) heater rm into bedroom. all work at ground flr. | $36,000 |
| Dec 23, 2015 | Completed final sign-off Dec 2016 | 408 34th Av | remodel (1) bathroom & (1) kitchen on upper floor; no change to layout, walls, doors, or windows; no structural work done.Details
remodel (1) bathroom & (1) kitchen on upper floor; no change to layout, walls, doors, or windows; no structural work done. | $16,000 |
| Sep 10, 2015 | Completed final sign-off Mar 2016 | 509 Melrose Av | remodel one kitchen on the upper floor, no change layout, there will be no structural work done.Details
remodel one kitchen on the upper floor, no change layout, there will be no structural work done. | $12,000 |
| Jun 18, 2015 | Completed final sign-off Aug 2016 | 24 Henry St | rev to 201505226983.int renov wk upgrades to kitchen,bathrms,elec&plumb sys.(n)5 placesfinishes at 2/fl.ext wk replace &windows&drs,replace cement shingles.remove rear enclosed porch&replac w/new deck.replace rear stairs.convert 1/fl to 2nd unit&add a garage.no expansion (e)bldg env.Details
rev to 201505226983.int renov wk upgrades to kitchen,bathrms,elec&plumb sys.(n)5 placesfinishes at 2/fl.ext wk replace &windows&drs,replace cement shingles.remove rear enclosed porch&replac w/new deck.replace rear stairs.convert 1/fl to 2nd unit&add a garage.no expansion (e)bldg env. | $205,000 |
| Jun 3, 2015 | Completed final sign-off Nov 2015 | 546 19th Av | remodel on kitchen on the 1st floor in kind. no change in layout. there will be no structural work doneDetails
remodel on kitchen on the 1st floor in kind. no change in layout. there will be no structural work done | $12,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2015 | 66 Clipper St | remodel one kitchen and laundry room change cabinet in first floor no structural work.Details
remodel one kitchen and laundry room change cabinet in first floor no structural work. | $12,000 |
| Apr 1, 2015 | Completed final sign-off Nov 2016 | 3128 16th St | 1st time interior t.i : add new sewerline and plumbing fixtures. add new receptacles. kitchen hood. change of use to restaurant from retail. n/a for maher ordinance. ansul under deferred submittal.Details
1st time interior t.i : add new sewerline and plumbing fixtures. add new receptacles. kitchen hood. change of use to restaurant from retail. n/a for maher ordinance. ansul under deferred submittal. | $60,000 |
| Oct 1, 2014 | Completed final sign-off Mar 2015 | 342 27th Av | revision to pa# 2014-0908-5668. add new bathroom between existing kitchen and laundry room at 2nd floorDetails
revision to pa# 2014-0908-5668. add new bathroom between existing kitchen and laundry room at 2nd floor | $5,000 |
| Sep 8, 2014 | Completed final sign-off Mar 2015 | 342 27th Av | remodel 1 kitchen, 1 bathroom and 1 laundry room; no structural work to be done; to comply with cec150.0(k)3 & 5Details
remodel 1 kitchen, 1 bathroom and 1 laundry room; no structural work to be done; to comply with cec150.0(k)3 & 5 | $18,000 |