Back to bathroom remodel contractors
Hong Lee Construction Co Inc
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2014 to Jun 2019
- Last 24 months
- 0 permits filed
38 permits since 2000: 29 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 never finaled. Typically 19 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2019 | Completed final sign-off Apr 2021 | 1379 44th Av | unit 1379: remodel 1 kitchen & 2 bathrooms, lights per 150.0(k), replace 1 furnace & water heater lights per 150.0 80% ef. unit 1381: remodel 1 kitchen & 2 bathrooms repace 1 furnace & water heater.Details
unit 1379: remodel 1 kitchen & 2 bathrooms, lights per 150.0(k), replace 1 furnace & water heater lights per 150.0 80% ef. unit 1381: remodel 1 kitchen & 2 bathrooms repace 1 furnace & water heater. | $105,000 |
| Oct 31, 2018 | Completed final sign-off May 2019 | 2936 Divisadero St | remodel of interior of one unit in 2 unit bldg. kitchen to relocated to the existing dining room to create a 4th bedroom, where old kitchen was. the existing powder room & closet revised to create new full bath & powder room. no expansion of bldg envelope or heated area.Details
remodel of interior of one unit in 2 unit bldg. kitchen to relocated to the existing dining room to create a 4th bedroom, where old kitchen was. the existing powder room & closet revised to create new full bath & powder room. no expansion of bldg envelope or heated area. | $168,000 |
| Jan 11, 2018 | Completed final sign-off Dec 2019 | 546 19th Av | this is a conforming rear addition to a single fam residence. there are no changes to the front of the bldg. the addition is on the 1st and 2nd fl. 3rd fl remains the same. a lightwell has been introduced for the neighbors window. a kitchen will be renovated and a bath added to the 1st fl.Details
this is a conforming rear addition to a single fam residence. there are no changes to the front of the bldg. the addition is on the 1st and 2nd fl. 3rd fl remains the same. a lightwell has been introduced for the neighbors window. a kitchen will be renovated and a bath added to the 1st fl. | $230,000 |
| Jan 5, 2018 | Never finaled issued Apr 2018, no final | 1116 Pacific Av | enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building.Details
enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building. | $95,000 |
| Sep 18, 2017 | Completed final sign-off Sep 2019 | 1417 Mason St | remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heaterDetails
remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heater | $50,000 |
| Aug 30, 2017 | Completed final sign-off Oct 2018 | 574 Filbert St | remodel existing 1st floor front apartment unit with new kitchen & bathroom. install one new beam with footing plus new plywood sheating to adjacent wall to match removal of nearby wall.Details
remodel existing 1st floor front apartment unit with new kitchen & bathroom. install one new beam with footing plus new plywood sheating to adjacent wall to match removal of nearby wall. | $40,000 |
| Dec 13, 2016 | Never finaled issued Feb 2017, no final | 60 Clipper St | replacement of old leaking footing and foundation and reconfiguration of ground floor including remodel bathroom, laundry, family room and bedroom. legalize non-conforming stairs to 1st floor.Details
replacement of old leaking footing and foundation and reconfiguration of ground floor including remodel bathroom, laundry, family room and bedroom. legalize non-conforming stairs to 1st floor. | $70,000 |
| Mar 8, 2016 | Completed final sign-off Aug 2018 | 249 Oak Park Dr | fire rate new walls between garage and habitable area to legalize new bedroom, new rumps room, new bathroom; relocate existing furnace, water heater, laundry equipment & sink tray in garage.Details
fire rate new walls between garage and habitable area to legalize new bedroom, new rumps room, new bathroom; relocate existing furnace, water heater, laundry equipment & sink tray in garage. | $35,000 |
| Dec 23, 2015 | Completed final sign-off Dec 2016 | 408 34th Av | remodel (1) bathroom & (1) kitchen on upper floor; no change to layout, walls, doors, or windows; no structural work done.Details
remodel (1) bathroom & (1) kitchen on upper floor; no change to layout, walls, doors, or windows; no structural work done. | $16,000 |
| Aug 5, 2015 | Completed final sign-off Nov 2015 | 546 19th Av | revision to ref pa 2015 0603 7914: add powder room on second floor. add bathroom and closet to 3rd floor bedroom1, remodel (e) bathroom on 3rd floor.Details
revision to ref pa 2015 0603 7914: add powder room on second floor. add bathroom and closet to 3rd floor bedroom1, remodel (e) bathroom on 3rd floor. | $40,000 |
| May 22, 2015 | Completed final sign-off Aug 2016 | 24 Henry St | interior remodel of 3rd fl including remodel bathrooms & add bathroom,elec, and plumbing. legalize storage at 1st fl and remove tub/toilet. add fireplace 3rd fl, add skylightDetails
interior remodel of 3rd fl including remodel bathrooms & add bathroom,elec, and plumbing. legalize storage at 1st fl and remove tub/toilet. add fireplace 3rd fl, add skylight | $48,000 |
| Oct 1, 2014 | Completed final sign-off Mar 2015 | 342 27th Av | revision to pa# 2014-0908-5668. add new bathroom between existing kitchen and laundry room at 2nd floorDetails
revision to pa# 2014-0908-5668. add new bathroom between existing kitchen and laundry room at 2nd floor | $5,000 |
| Sep 8, 2014 | Completed final sign-off Mar 2015 | 342 27th Av | remodel 1 kitchen, 1 bathroom and 1 laundry room; no structural work to be done; to comply with cec150.0(k)3 & 5Details
remodel 1 kitchen, 1 bathroom and 1 laundry room; no structural work to be done; to comply with cec150.0(k)3 & 5 | $18,000 |