Hong Kong Art Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Dec 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 0 days from filing to permit and 18 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2017 | Completed final sign-off Oct 2017 | 5777 Mission St | to comply with complaint #201702531: repair rear staircase (less than 50%), repair window glazing at 2/f, repair smoke enclosure door closer.Details
to comply with complaint #201702531: repair rear staircase (less than 50%), repair window glazing at 2/f, repair smoke enclosure door closer. | $2,000 |
| Sep 22, 2010 | Completed final sign-off Oct 2010 | 724 24th Av | return ground floor to garage use to comply with violation# 200561551. revert back to legal use, remove unpermitted dwelling, repair rear stair less than 50%Details
return ground floor to garage use to comply with violation# 200561551. revert back to legal use, remove unpermitted dwelling, repair rear stair less than 50% | $8,000 |
| Feb 19, 2008 | Completed final sign-off Feb 2008 | 1724 Clement St | work @ unit# 1 only. comply with his report# 200837350. repair deteriorated rear stair & provide handrails. repair water damate in unit#1.Details
work @ unit# 1 only. comply with his report# 200837350. repair deteriorated rear stair & provide handrails. repair water damate in unit#1. | $1,800 |
| Apr 18, 2005 | Completed final sign-off Jul 2005 | 1410 48th Av | repair rear stair and remodel bath at 1410. stairs to be replaced not more than 50%. replace toilet,Details
repair rear stair and remodel bath at 1410. stairs to be replaced not more than 50%. replace toilet, | $5,000 |