Back to bathroom remodel contractors
Hong Kong Art Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Dec 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2013 | Completed final sign-off May 2014 | 2370 Mission St | to comply with ordinance 029-13 only, installatio nof grab bars in sro in 2/f & 3/f, one bathroom & one restroom in each floor.Details
to comply with ordinance 029-13 only, installatio nof grab bars in sro in 2/f & 3/f, one bathroom & one restroom in each floor. | $500 |
| Apr 18, 2005 | Completed final sign-off Jul 2005 | 1410 48th Av | repair rear stair and remodel bath at 1410. stairs to be replaced not more than 50%. replace toilet,Details
repair rear stair and remodel bath at 1410. stairs to be replaced not more than 50%. replace toilet, | $5,000 |
| Nov 20, 2003 | Completed final sign-off Feb 2004 | 100 Shotwell St | remodel one kitchen and one bathroom on second fl, unit #100Details
remodel one kitchen and one bathroom on second fl, unit #100 | $15,000 |
| Nov 6, 2003 | Completed final sign-off Feb 2004 | 100 Shotwell St | remodel kitchen & 1 bathroom.Details
remodel kitchen & 1 bathroom. | $17,900 |
| Jul 13, 2000 | Completed final sign-off Mar 2002 | 3055 26th Av | remodel kitchen & bathrooms, counter, tubs sinks, toilets, tiles, cabinets replacementDetails
remodel kitchen & bathrooms, counter, tubs sinks, toilets, tiles, cabinets replacement | $15,000 |