Back to kitchen remodel contractors
Hong Bo Hardware Supply
- Based in
- Union City
- On San Francisco permits
- Sep 2008 to Dec 2015
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2015 | Completed final sign-off Feb 2018 | 3327 Irving St | kitchen, bath remodel. remove wall between kitchen, living rm, upgrade e elec panel to 125 amp, change furnace, changte 2 windows facing street, replace with all-wood windows in kind retaining divided light configurations. legalize living room, family rm and full bath on 1/fDetails
kitchen, bath remodel. remove wall between kitchen, living rm, upgrade e elec panel to 125 amp, change furnace, changte 2 windows facing street, replace with all-wood windows in kind retaining divided light configurations. legalize living room, family rm and full bath on 1/f | $94,000 |
| May 13, 2015 | Completed final sign-off Oct 2015 | 2027 Lawton St | kitchen and bathroom remdoel; like for like, new tile,vanity, new toilet, new led reccess light. to comply with cec150.0(k)3 & 5Details
kitchen and bathroom remdoel; like for like, new tile,vanity, new toilet, new led reccess light. to comply with cec150.0(k)3 & 5 | $30,000 |
| Aug 22, 2012 | Completed final sign-off Jan 2013 | 2682 45th Av | bathroom, kitchen remodel in kind, replace 5 damaged wood joist, less than 50% for back patio, replace 2 interior door i n kind, interior paint 2/fDetails
bathroom, kitchen remodel in kind, replace 5 damaged wood joist, less than 50% for back patio, replace 2 interior door i n kind, interior paint 2/f | $30,000 |
| Feb 4, 2011 | Completed final sign-off Nov 2011 | 1050 North Point St | unit #304: kitchen remodel, replace cabinets, appliances like to like. bathrm. remodel: replace all fixtures, flooring to tile.Details
unit #304: kitchen remodel, replace cabinets, appliances like to like. bathrm. remodel: replace all fixtures, flooring to tile. | $20,000 |
| Feb 3, 2011 | Expired or cancelled expired Dec 2013 | 6 Carl St | remodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel.Details
remodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel. | $18,000 |
| Nov 22, 2010 | Completed final sign-off Jun 2011 | 649 Castro St | 649 castro: new cabinets, new dishwasher, new countertop (kitchen) :add (n) 1/2 bathroom, door and wall; at(e) full bath, new tub and exhaust fan 651 castro: add new 1/2 bathroom, replace (non-street side) window, new door and wall; at(e) full bath, new tub and exhaust fanDetails
649 castro: new cabinets, new dishwasher, new countertop (kitchen) :add (n) 1/2 bathroom, door and wall; at(e) full bath, new tub and exhaust fan 651 castro: add new 1/2 bathroom, replace (non-street side) window, new door and wall; at(e) full bath, new tub and exhaust fan | $18,000 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 2 Carl St | change kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl streetDetails
change kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl street | $13,000 |
| Mar 18, 2010 | Completed final sign-off Jun 2010 | 4067 Mission St | kitchen remodel. new cabinets, upgrade electrical, vent for hood, granite counter top. exhaust vent outside up to roof. 3' min from pl and bldg opening. bathroom, new tile, tub, toilet, sink, 4 new windows (visible from street, same size. u-factor= 0.40 max.Details
kitchen remodel. new cabinets, upgrade electrical, vent for hood, granite counter top. exhaust vent outside up to roof. 3' min from pl and bldg opening. bathroom, new tile, tub, toilet, sink, 4 new windows (visible from street, same size. u-factor= 0.40 max. | $15,000 |