Back to kitchen remodel contractors
Home Improvement Company
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2026
- Last 24 months
- 7 permits filed
105 permits since 2000: 83 completed, 6 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 31 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2025 | Completed final sign-off Jun 2025 | 2215 26th Av | remodel (1) kitchen, in-kind. dry rot repair around interior windows. all work in kind. no structural work or wall modifications.Details
remodel (1) kitchen, in-kind. dry rot repair around interior windows. all work in kind. no structural work or wall modifications. | $18,500 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 3331 Pierce St | remove kitchen cabinets and install new ones in-kiind. removel bathroom, new tub, cabinets, shower in-kind. repair dry rot in-kind where is needed in-kind.Details
remove kitchen cabinets and install new ones in-kiind. removel bathroom, new tub, cabinets, shower in-kind. repair dry rot in-kind where is needed in-kind. | $38,000 |
| Jan 30, 2024 | Completed final sign-off Jun 2024 | 1214 Funston Av | 3rd floor: remodel (e) 1 kitchen & 1 bathroom. all work in-kind. no structural, wall or layout modifications. bathroom approx. (35 sf), kitchen approx. (65 sf). dryrot repair in shower.Details
3rd floor: remodel (e) 1 kitchen & 1 bathroom. all work in-kind. no structural, wall or layout modifications. bathroom approx. (35 sf), kitchen approx. (65 sf). dryrot repair in shower. | $40,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2026 | 1575 43rd Av | remodel (e) kitchen & bathroom on main level. no layout changes or structural work.Details
remodel (e) kitchen & bathroom on main level. no layout changes or structural work. | $48,000 |
| Jul 17, 2023 | Completed final sign-off Dec 2023 | 1520 Taylor St | replacing kitchen cabinets in kind. new appliances, replacing tiles in the bathroom, new plumbing fixtures. all work is non-structural only. no framing/wall modification.Details
replacing kitchen cabinets in kind. new appliances, replacing tiles in the bathroom, new plumbing fixtures. all work is non-structural only. no framing/wall modification. | $26,000 |
| Mar 10, 2023 | Completed final sign-off Apr 2023 | 897 Elizabeth St | front building: revisions to 202201216378: 301 hoffman: change laundry rm to powder room, 899 elizabeth: remove stair at rear. add washer and dryer at kitchen. add a juliette balcony at rear door.Details
front building: revisions to 202201216378: 301 hoffman: change laundry rm to powder room, 899 elizabeth: remove stair at rear. add washer and dryer at kitchen. add a juliette balcony at rear door. | |
| Jan 21, 2022 | Completed final sign-off Apr 2023 | 897 Elizabeth St | 1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542Details
1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542 | $350,000 |
| Dec 2, 2021 | Completed final sign-off Apr 2023 | 305 Hoffman Av | replace 1 kitchen cabinets in kind. remodel 1 bathroom.Details
replace 1 kitchen cabinets in kind. remodel 1 bathroom. | $16,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2023 | 897 Elizabeth St | remodel kitchen in kind repair dry rott if needed at kitchen area. repair dry-rot in-kind, approx. 10 sf, (2) stud max..Details
remodel kitchen in kind repair dry rott if needed at kitchen area. repair dry-rot in-kind, approx. 10 sf, (2) stud max.. | $12,000 |
| Jun 25, 2021 | Completed final sign-off Jun 2022 | 1325 29th Av | replace kitchen cabinets in kind. no structural workDetails
replace kitchen cabinets in kind. no structural work | $16,000 |
| Apr 2, 2021 | Completed final sign-off Mar 2022 | 3725 California St | unit 1 - replace 1 kitchen & 1 bathroom fixtures in kind. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 (k)3 & (k) 5Details
unit 1 - replace 1 kitchen & 1 bathroom fixtures in kind. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 (k)3 & (k) 5 | $25,000 |
| Apr 2, 2021 | Expired or cancelled cancelled Aug 2023 | 642 43rd Av | replace 1 kitchen & 1 bathroom fixtures in kind remodel. no new wall & no existing wall relocation. new lightng shall comply w/cec 150.0(k)3 & (k)5Details
replace 1 kitchen & 1 bathroom fixtures in kind remodel. no new wall & no existing wall relocation. new lightng shall comply w/cec 150.0(k)3 & (k)5 | $25,000 |
| Jan 26, 2021 | Completed final sign-off Jan 2022 | 1646 47th Av | kitchen & bathroom remodel in kind. repair dry rot at the backyard wall. in kind. approx 150 sq ft of wall aera.Details
kitchen & bathroom remodel in kind. repair dry rot at the backyard wall. in kind. approx 150 sq ft of wall aera. | $29,000 |
| Oct 8, 2020 | Completed final sign-off Jan 2021 | 825 Cole St | installation kitchen cabinets in kind. no structural. change finishes inside with bathroom. replace plumbing fixturesDetails
installation kitchen cabinets in kind. no structural. change finishes inside with bathroom. replace plumbing fixtures | $15,000 |
| Oct 5, 2020 | Completed final sign-off Oct 2021 | 771 26th Av | replace kitchen cabinet in kind. no structural work. change finishes inside bathroom. replace plumbing fixtures.Details
replace kitchen cabinet in kind. no structural work. change finishes inside bathroom. replace plumbing fixtures. | $15,000 |
| Oct 23, 2018 | Completed final sign-off Sep 2019 | 3414 Judah St | remodel (e) kitchen, relocate/remodel 2 (e) bathrooms. build new stairs to attic/storage space. remodel (e) bar areaDetails
remodel (e) kitchen, relocate/remodel 2 (e) bathrooms. build new stairs to attic/storage space. remodel (e) bar area | $50,000 |
| May 23, 2018 | Completed final sign-off Jun 2019 | 3085 23rd Av | replacement of (e) kitchen cabinets in-kind. no structural work. no plumbing work. no electrical work.Details
replacement of (e) kitchen cabinets in-kind. no structural work. no plumbing work. no electrical work. | $3,800 |
| Apr 4, 2018 | Completed final sign-off Jun 2019 | 1342 Hayes St | ground floor: build new family room, bedroom, bathroom, laundry & mud room. 2nd floor: remodel extg kitchen, bathroom, living & dining room. 3rd floor remodel extg bathrooms and bedrooms. new door at rear 1st flr. 2 new skylights. <50% repair at rear stair.Details
ground floor: build new family room, bedroom, bathroom, laundry & mud room. 2nd floor: remodel extg kitchen, bathroom, living & dining room. 3rd floor remodel extg bathrooms and bedrooms. new door at rear 1st flr. 2 new skylights. <50% repair at rear stair. | $250,000 |
| Apr 2, 2018 | Never finaled filed Apr 2018, never issued | 1646 35th Av | unit legalization per ordinance# 43-14. 2 bedroom, kitchen, 1 bath, living room on ground level.Details
unit legalization per ordinance# 43-14. 2 bedroom, kitchen, 1 bath, living room on ground level. | |
| Jun 14, 2016 | Completed final sign-off Oct 2017 | 2865 Bush St | kitchen remodel in-kind. remodel 2 bathrooms in-kind. change windows at back of the house. dry rot repairs, replace damanged wood siding at back wall; exploratory demo, decay repairs.Details
kitchen remodel in-kind. remodel 2 bathrooms in-kind. change windows at back of the house. dry rot repairs, replace damanged wood siding at back wall; exploratory demo, decay repairs. | $43,000 |
| Apr 21, 2016 | Completed final sign-off Jun 2016 | 860 Haight St | ground floor- remodel kitchen, relocate bedroom door and convert living room to bedroom.Details
ground floor- remodel kitchen, relocate bedroom door and convert living room to bedroom. | $15,000 |
| Feb 2, 2015 | Completed final sign-off Feb 2018 | 2223 26th Av | 1)add 670 sq ft habitable space in the ground and upper floor. 2)infill 1'-4" along rear of bldg under (b) cantiliver. 3) enclose 2'6"x 5'-10" lightwell at 2nd floor, 4) renovate extg upper bathroom/bedroom, kitchen, living room & dining room.Details
1)add 670 sq ft habitable space in the ground and upper floor. 2)infill 1'-4" along rear of bldg under (b) cantiliver. 3) enclose 2'6"x 5'-10" lightwell at 2nd floor, 4) renovate extg upper bathroom/bedroom, kitchen, living room & dining room. | $150,000 |
| Dec 19, 2014 | Completed final sign-off Apr 2026 | 2223 26th Av | replace kitchen cabinets in kind. upgrade electrical. no structural work.Details
replace kitchen cabinets in kind. upgrade electrical. no structural work. | $4,200 |
| Nov 13, 2014 | Completed final sign-off Jan 2015 | 614 Lake St | replace kitchen cabinets in kind at #614 lake street. painting by others. lighting and control per cec 150 kDetails
replace kitchen cabinets in kind at #614 lake street. painting by others. lighting and control per cec 150 k | $9,200 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2755 34th Av | 1)add new bathroom in upper and lower level. 2)remodel extg bathroom at upper level. 3) convert extg dining room to kitchen. 4) convert extg kitchen to dining room. 5) add new family rooms and laudndry in lower floor. 6) add new deck at rear. 7)convert extg bathroom to pantry at upper floor.Details
1)add new bathroom in upper and lower level. 2)remodel extg bathroom at upper level. 3) convert extg dining room to kitchen. 4) convert extg kitchen to dining room. 5) add new family rooms and laudndry in lower floor. 6) add new deck at rear. 7)convert extg bathroom to pantry at upper floor. | $100,000 |
| Oct 16, 2013 | Completed final sign-off Nov 2013 | 1647 21st Av | to comply with nov 200672056. - eliminate illegal kitchenDetails
to comply with nov 200672056. - eliminate illegal kitchen | $500 |
| Jun 21, 2013 | Completed final sign-off May 2014 | 208 Lake Merced Hill St North St | #4c - replace kitchen cabinets in kind, lighting: high efficacy lights 50%Details
#4c - replace kitchen cabinets in kind, lighting: high efficacy lights 50% | $8,000 |
| Jan 9, 2012 | Completed final sign-off Feb 2012 | 509 Sanchez St | work in unit 509: replacing kitchen cabinets 7 piece in kind, paint kitchen. electrical, plumbing by others.Details
work in unit 509: replacing kitchen cabinets 7 piece in kind, paint kitchen. electrical, plumbing by others. | $5,600 |
| Aug 29, 2011 | Completed final sign-off Jan 2012 | 3331 Pierce St | replace kitchen cabinets in kind, no structural work to be done, no electrical and plumbing workDetails
replace kitchen cabinets in kind, no structural work to be done, no electrical and plumbing work | $8,250 |
| Feb 28, 2011 | Completed final sign-off Jan 2012 | 2643 22nd Av | to comply w/nov #201196568: removal of unwarranted kitchen, to legalize existing habitable downstairs living spaces - family room, bath & wet bar, add storage, & remodel of exisitng ground floor living area.Details
to comply w/nov #201196568: removal of unwarranted kitchen, to legalize existing habitable downstairs living spaces - family room, bath & wet bar, add storage, & remodel of exisitng ground floor living area. | $12,500 |
| Jun 23, 2010 | Completed final sign-off Aug 2010 | 1384 17th Av | change the cabinet at kitchen are, 8' x 9'. install new counter top, paint. work on 1386 17th ave, 2nd floor.Details
change the cabinet at kitchen are, 8' x 9'. install new counter top, paint. work on 1386 17th ave, 2nd floor. | $8,000 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 503 Sanchez St | replace fixture and finishes at kitchen area; repair dry rot at bathroom walls. plumbing and electrical under separate permits. kitchen area 8'x12', bathroom wall to repair 4'x8'.Details
replace fixture and finishes at kitchen area; repair dry rot at bathroom walls. plumbing and electrical under separate permits. kitchen area 8'x12', bathroom wall to repair 4'x8'. | $8,000 |
| Oct 20, 2008 | Expired or cancelled cancelled Jan 2026 | 5538 Fulton St | kitchen & bathroom remodeling in-kind. new kitchen cabinets, new bathroom fixtures, new tile, new kitchen countertops. work on unit #5538.Details
kitchen & bathroom remodeling in-kind. new kitchen cabinets, new bathroom fixtures, new tile, new kitchen countertops. work on unit #5538. | |
| Sep 23, 2005 | Completed final sign-off Dec 2005 | 884 31st Av | recabinet in unit 884 only (kitchen in same location)Details
recabinet in unit 884 only (kitchen in same location) | $8,000 |