Back to bathroom remodel contractors
Home Improvement Company
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2026
- Last 24 months
- 7 permits filed
105 permits since 2000: 83 completed, 6 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 29 completed, 3 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2024 | Completed final sign-off May 2024 | 3331 Pierce St | remove kitchen cabinets and install new ones in-kiind. removel bathroom, new tub, cabinets, shower in-kind. repair dry rot in-kind where is needed in-kind.Details
remove kitchen cabinets and install new ones in-kiind. removel bathroom, new tub, cabinets, shower in-kind. repair dry rot in-kind where is needed in-kind. | $38,000 |
| Jan 30, 2024 | Completed final sign-off Jun 2024 | 1214 Funston Av | 3rd floor: remodel (e) 1 kitchen & 1 bathroom. all work in-kind. no structural, wall or layout modifications. bathroom approx. (35 sf), kitchen approx. (65 sf). dryrot repair in shower.Details
3rd floor: remodel (e) 1 kitchen & 1 bathroom. all work in-kind. no structural, wall or layout modifications. bathroom approx. (35 sf), kitchen approx. (65 sf). dryrot repair in shower. | $40,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2026 | 1575 43rd Av | remodel (e) kitchen & bathroom on main level. no layout changes or structural work.Details
remodel (e) kitchen & bathroom on main level. no layout changes or structural work. | $48,000 |
| Jan 8, 2024 | Completed final sign-off Mar 2026 | 1575 43rd Av | convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level.Details
convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level. | $150,000 |
| Jul 17, 2023 | Completed final sign-off Dec 2023 | 1520 Taylor St | replacing kitchen cabinets in kind. new appliances, replacing tiles in the bathroom, new plumbing fixtures. all work is non-structural only. no framing/wall modification.Details
replacing kitchen cabinets in kind. new appliances, replacing tiles in the bathroom, new plumbing fixtures. all work is non-structural only. no framing/wall modification. | $26,000 |
| Nov 4, 2022 | Completed final sign-off Oct 2023 | 2215 26th Av | remodel 1 (e) bathroom, all work in-kind. no structural work . no layout changes.Details
remodel 1 (e) bathroom, all work in-kind. no structural work . no layout changes. | $15,000 |
| Jan 21, 2022 | Completed final sign-off Apr 2023 | 897 Elizabeth St | 1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542Details
1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542 | $350,000 |
| Dec 2, 2021 | Completed final sign-off Apr 2023 | 305 Hoffman Av | replace 1 kitchen cabinets in kind. remodel 1 bathroom.Details
replace 1 kitchen cabinets in kind. remodel 1 bathroom. | $16,000 |
| Jun 11, 2021 | Expired or cancelled withdrawn Mar 2022 | 642 43rd Av | garage: reconfigure floor plan to including new family room, home office, bedroom, 2 bathrooms. new rear staircase.Details
garage: reconfigure floor plan to including new family room, home office, bedroom, 2 bathrooms. new rear staircase. | $50,000 |
| Apr 2, 2021 | Completed final sign-off Mar 2022 | 3725 California St | unit 1 - replace 1 kitchen & 1 bathroom fixtures in kind. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 (k)3 & (k) 5Details
unit 1 - replace 1 kitchen & 1 bathroom fixtures in kind. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 (k)3 & (k) 5 | $25,000 |
| Apr 2, 2021 | Expired or cancelled cancelled Aug 2023 | 642 43rd Av | replace 1 kitchen & 1 bathroom fixtures in kind remodel. no new wall & no existing wall relocation. new lightng shall comply w/cec 150.0(k)3 & (k)5Details
replace 1 kitchen & 1 bathroom fixtures in kind remodel. no new wall & no existing wall relocation. new lightng shall comply w/cec 150.0(k)3 & (k)5 | $25,000 |
| Jan 26, 2021 | Completed final sign-off Jan 2022 | 1646 47th Av | kitchen & bathroom remodel in kind. repair dry rot at the backyard wall. in kind. approx 150 sq ft of wall aera.Details
kitchen & bathroom remodel in kind. repair dry rot at the backyard wall. in kind. approx 150 sq ft of wall aera. | $29,000 |
| Jan 7, 2021 | Completed final sign-off Jan 2022 | 314 Dorantes Av | bathroom remodel in kind, replace the finishes in kindDetails
bathroom remodel in kind, replace the finishes in kind | $12,200 |
| Oct 8, 2020 | Completed final sign-off Jan 2021 | 825 Cole St | installation kitchen cabinets in kind. no structural. change finishes inside with bathroom. replace plumbing fixturesDetails
installation kitchen cabinets in kind. no structural. change finishes inside with bathroom. replace plumbing fixtures | $15,000 |
| Oct 5, 2020 | Completed final sign-off Oct 2021 | 771 26th Av | replace kitchen cabinet in kind. no structural work. change finishes inside bathroom. replace plumbing fixtures.Details
replace kitchen cabinet in kind. no structural work. change finishes inside bathroom. replace plumbing fixtures. | $15,000 |
| Oct 23, 2018 | Completed final sign-off Sep 2019 | 3414 Judah St | remodel (e) kitchen, relocate/remodel 2 (e) bathrooms. build new stairs to attic/storage space. remodel (e) bar areaDetails
remodel (e) kitchen, relocate/remodel 2 (e) bathrooms. build new stairs to attic/storage space. remodel (e) bar area | $50,000 |
| Oct 17, 2018 | Completed final sign-off Oct 2019 | 3085 23rd Av | interior non-structural alterations to existing bathroom. interior alterations to existing closet to accoodate new bathroom - non structural. interior non-structural alterations to existing staircase.Details
interior non-structural alterations to existing bathroom. interior alterations to existing closet to accoodate new bathroom - non structural. interior non-structural alterations to existing staircase. | $30,000 |
| Apr 4, 2018 | Completed final sign-off Jun 2019 | 1342 Hayes St | ground floor: build new family room, bedroom, bathroom, laundry & mud room. 2nd floor: remodel extg kitchen, bathroom, living & dining room. 3rd floor remodel extg bathrooms and bedrooms. new door at rear 1st flr. 2 new skylights. <50% repair at rear stair.Details
ground floor: build new family room, bedroom, bathroom, laundry & mud room. 2nd floor: remodel extg kitchen, bathroom, living & dining room. 3rd floor remodel extg bathrooms and bedrooms. new door at rear 1st flr. 2 new skylights. <50% repair at rear stair. | $250,000 |
| Apr 2, 2018 | Never finaled filed Apr 2018, never issued | 1646 35th Av | unit legalization per ordinance# 43-14. 2 bedroom, kitchen, 1 bath, living room on ground level.Details
unit legalization per ordinance# 43-14. 2 bedroom, kitchen, 1 bath, living room on ground level. | |
| Nov 30, 2016 | Completed final sign-off Oct 2017 | 2865 Bush St | revision to pa 2016-0614-9895 - restore original siding @ front wall, remove (e) shingles, change windows @ front of the building. install (n) posts, beam & footing on ground floor. build (n) half bath on 1st floor. install (n) skylightDetails
revision to pa 2016-0614-9895 - restore original siding @ front wall, remove (e) shingles, change windows @ front of the building. install (n) posts, beam & footing on ground floor. build (n) half bath on 1st floor. install (n) skylight | $45,000 |
| Jun 14, 2016 | Completed final sign-off Oct 2017 | 2865 Bush St | kitchen remodel in-kind. remodel 2 bathrooms in-kind. change windows at back of the house. dry rot repairs, replace damanged wood siding at back wall; exploratory demo, decay repairs.Details
kitchen remodel in-kind. remodel 2 bathrooms in-kind. change windows at back of the house. dry rot repairs, replace damanged wood siding at back wall; exploratory demo, decay repairs. | $43,000 |
| Feb 2, 2015 | Completed final sign-off Feb 2018 | 2223 26th Av | 1)add 670 sq ft habitable space in the ground and upper floor. 2)infill 1'-4" along rear of bldg under (b) cantiliver. 3) enclose 2'6"x 5'-10" lightwell at 2nd floor, 4) renovate extg upper bathroom/bedroom, kitchen, living room & dining room.Details
1)add 670 sq ft habitable space in the ground and upper floor. 2)infill 1'-4" along rear of bldg under (b) cantiliver. 3) enclose 2'6"x 5'-10" lightwell at 2nd floor, 4) renovate extg upper bathroom/bedroom, kitchen, living room & dining room. | $150,000 |
| Nov 17, 2014 | Never finaled issued Dec 2014, no final | 825 Cole St | revision to 201406198878. add wall in front of bathroom. reinfornce foundation under laundry wallsDetails
revision to 201406198878. add wall in front of bathroom. reinfornce foundation under laundry walls | |
| Oct 16, 2014 | Completed final sign-off May 2015 | 127 Miramar Av | add new bedroom, bath, laundry in lower floor. total new area 350 sf. adjust interior stair by moving 2' at upper floor. demo e hallway closet at upper fl.Details
add new bedroom, bath, laundry in lower floor. total new area 350 sf. adjust interior stair by moving 2' at upper floor. demo e hallway closet at upper fl. | $50,000 |
| Aug 6, 2014 | Completed final sign-off Nov 2014 | 2747 34th Av | convert a storage area to new bedroom with new bathroom. total new area 490 sf. lower (e) slab in storage area by 7". relocate (e) undermined retain wall & foundation in (e) storage area. replace (e) windows along rear bldg.Details
convert a storage area to new bedroom with new bathroom. total new area 490 sf. lower (e) slab in storage area by 7". relocate (e) undermined retain wall & foundation in (e) storage area. replace (e) windows along rear bldg. | $50,000 |
| Jun 19, 2014 | Completed final sign-off Feb 2015 | 825 Cole St | convert (e) storage to (n) media room, 464 sq. ft. of habitable space, lower (e) floor slab by 4" to 6"; add (n) bathroom & closet at lower floorDetails
convert (e) storage to (n) media room, 464 sq. ft. of habitable space, lower (e) floor slab by 4" to 6"; add (n) bathroom & closet at lower floor | $50,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2755 34th Av | 1)add new bathroom in upper and lower level. 2)remodel extg bathroom at upper level. 3) convert extg dining room to kitchen. 4) convert extg kitchen to dining room. 5) add new family rooms and laudndry in lower floor. 6) add new deck at rear. 7)convert extg bathroom to pantry at upper floor.Details
1)add new bathroom in upper and lower level. 2)remodel extg bathroom at upper level. 3) convert extg dining room to kitchen. 4) convert extg kitchen to dining room. 5) add new family rooms and laudndry in lower floor. 6) add new deck at rear. 7)convert extg bathroom to pantry at upper floor. | $100,000 |
| Jan 29, 2013 | Completed final sign-off Aug 2013 | 882 31st Av | garage floor remodel, (n) storage, (n) deck & two (n) bathrooms.Details
garage floor remodel, (n) storage, (n) deck & two (n) bathrooms. | $15,000 |
| Feb 28, 2011 | Completed final sign-off Jan 2012 | 2643 22nd Av | to comply w/nov #201196568: removal of unwarranted kitchen, to legalize existing habitable downstairs living spaces - family room, bath & wet bar, add storage, & remodel of exisitng ground floor living area.Details
to comply w/nov #201196568: removal of unwarranted kitchen, to legalize existing habitable downstairs living spaces - family room, bath & wet bar, add storage, & remodel of exisitng ground floor living area. | $12,500 |
| Nov 23, 2010 | Completed final sign-off Feb 2011 | 2469 Bryant St | correction of cc report 58-08: ref app 200710266613, 1 hr wall at gr floor. ref 200208143911 side door swing, partition wall/bathroom landing at gr floorDetails
correction of cc report 58-08: ref app 200710266613, 1 hr wall at gr floor. ref 200208143911 side door swing, partition wall/bathroom landing at gr floor | $5,000 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 503 Sanchez St | replace fixture and finishes at kitchen area; repair dry rot at bathroom walls. plumbing and electrical under separate permits. kitchen area 8'x12', bathroom wall to repair 4'x8'.Details
replace fixture and finishes at kitchen area; repair dry rot at bathroom walls. plumbing and electrical under separate permits. kitchen area 8'x12', bathroom wall to repair 4'x8'. | $8,000 |
| Jun 11, 2009 | Completed final sign-off Jul 2010 | 825 Cole St | modify floor plan approved under 200606275169: new laundry enclosure at 1st fl, relocate foyer door, reconfigure walls and fixtures in unit 823,825,827, and 829. new bedroom and bath at unit 827,829 with spiral stair. relocate 2 existing skylights at 829 & 2 new at 827.Details
modify floor plan approved under 200606275169: new laundry enclosure at 1st fl, relocate foyer door, reconfigure walls and fixtures in unit 823,825,827, and 829. new bedroom and bath at unit 827,829 with spiral stair. relocate 2 existing skylights at 829 & 2 new at 827. | $50,000 |
| Oct 20, 2008 | Expired or cancelled cancelled Jan 2026 | 5538 Fulton St | kitchen & bathroom remodeling in-kind. new kitchen cabinets, new bathroom fixtures, new tile, new kitchen countertops. work on unit #5538.Details
kitchen & bathroom remodeling in-kind. new kitchen cabinets, new bathroom fixtures, new tile, new kitchen countertops. work on unit #5538. | |
| Jun 9, 2004 | Never finaled issued Jun 2004, no final | 1800 Gough St | add sink to (e) bath (existing tub & toilet). reconfigure 2 baths. add/move toilets, sinks. add poweDetails
add sink to (e) bath (existing tub & toilet). reconfigure 2 baths. add/move toilets, sinks. add powe | |
| May 6, 2004 | Completed final sign-off Jun 2005 | 1800 Gough St | add sink to ne bath (e) tub/toilet), reconfigure 2 baths to make one master bathDetails
add sink to ne bath (e) tub/toilet), reconfigure 2 baths to make one master bath | $70,000 |