Back to kitchen remodel contractors
Hoi's Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to May 2025
- Last 24 months
- 1 permit filed
54 permits since 2000: 39 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 291 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Jun 2025 | 282 Red Rock Wy | update (1) kitchen (no layout change) replace window, update floors, new materials and carpet install newma 14-50 outlet in garage, add sourc ligthing, update (1) master batroom, new tilesDetails
update (1) kitchen (no layout change) replace window, update floors, new materials and carpet install newma 14-50 outlet in garage, add sourc ligthing, update (1) master batroom, new tiles | $20,000 |
| Apr 11, 2023 | Completed final sign-off Dec 2023 | 10 Gennessee St | rev to pa# 2021-1220-4760 & 2019-1231-1118: relocate 1st fl. kitchen layout and garage interior doorDetails
rev to pa# 2021-1220-4760 & 2019-1231-1118: relocate 1st fl. kitchen layout and garage interior door | |
| Apr 26, 2022 | Completed final sign-off Dec 2023 | 10 Gennessee St | kitchen and bathroom renovation to second fl. bathroom walls reconfiguration.Details
kitchen and bathroom renovation to second fl. bathroom walls reconfiguration. | $10,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2022 | 1065 Carolina St | remodel kitchen-counter and tile backsplash replacement. cabinets to remain. rmeodel 1 3/f bathroom in-kind. all plumbing, electrical and walls location to remain in (e) location.Details
remodel kitchen-counter and tile backsplash replacement. cabinets to remain. rmeodel 1 3/f bathroom in-kind. all plumbing, electrical and walls location to remain in (e) location. | $15,000 |
| Jan 25, 2018 | Completed final sign-off Nov 2018 | 314 Felton St | kitchen remodel. upgrade plumbing and electrical. install new cabinets, appliances, flooring and painting. remodel existing 2.5 bathrooms. install new floor & wall tiles, toilets and shower.Details
kitchen remodel. upgrade plumbing and electrical. install new cabinets, appliances, flooring and painting. remodel existing 2.5 bathrooms. install new floor & wall tiles, toilets and shower. | $20,000 |
| Oct 19, 2010 | Completed final sign-off Oct 2011 | 1180 Palou Av | remodel 2 baths, 1 kitchen. non structural.lighting to comply with cec 150kDetails
remodel 2 baths, 1 kitchen. non structural.lighting to comply with cec 150k | $27,000 |
| Sep 22, 2006 | Completed final sign-off Mar 2007 | 730 Moraga St | per nov 200671514 apt #1,2 & 4: in restrooms change (e) fixtures to (n) - in kitchen change (e) cabinets to (n) - kitchen and bathroom tile in apt #2 & 4 repair and replace fire damaged wood and gyp board repair roof and ext. siding damaged from the fire paint int. and ext. change 2 walls mountDetails
per nov 200671514 apt #1,2 & 4: in restrooms change (e) fixtures to (n) - in kitchen change (e) cabinets to (n) - kitchen and bathroom tile in apt #2 & 4 repair and replace fire damaged wood and gyp board repair roof and ext. siding damaged from the fire paint int. and ext. change 2 walls mount | $70,000 |
| Apr 9, 2002 | Expired or cancelled expired Oct 2002 | 491 Madrid St | repair the kitchen ,two cabinet, kitchen flr counter top. repair the ceiling & the roofs wood. replaDetails
repair the kitchen ,two cabinet, kitchen flr counter top. repair the ceiling & the roofs wood. repla | $8,000 |
| Mar 8, 2002 | Completed final sign-off Jul 2003 | 200 Cashmere St | accessible upgrades, toilet rms, kitchen & accessible van parking space, replace hvac sysDetails
accessible upgrades, toilet rms, kitchen & accessible van parking space, replace hvac sys | $60,000 |