Back to bathroom remodel contractors
Hoi's Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to May 2025
- Last 24 months
- 1 permit filed
54 permits since 2000: 39 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2022 | Completed final sign-off Dec 2023 | 10 Gennessee St | kitchen and bathroom renovation to second fl. bathroom walls reconfiguration.Details
kitchen and bathroom renovation to second fl. bathroom walls reconfiguration. | $10,000 |
| Jul 8, 2021 | Completed final sign-off Jan 2022 | 1065 Carolina St | legalize added bathroom on 3rd floorDetails
legalize added bathroom on 3rd floor | $2,500 |
| Apr 20, 2021 | Completed final sign-off Jan 2022 | 1065 Carolina St | remodel kitchen-counter and tile backsplash replacement. cabinets to remain. rmeodel 1 3/f bathroom in-kind. all plumbing, electrical and walls location to remain in (e) location.Details
remodel kitchen-counter and tile backsplash replacement. cabinets to remain. rmeodel 1 3/f bathroom in-kind. all plumbing, electrical and walls location to remain in (e) location. | $15,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2023 | 10 Gennessee St | 2nd fl infill e lightwell at rear of bldg add new 24 x36 skylight at infill roof. demo e staircase to gr fl and construct n stair to gr fl gr fl construct 2 new bdrms, family rm, full bath, laundry. n 68x30 patio door and new 24 x 48 ofh windowDetails
2nd fl infill e lightwell at rear of bldg add new 24 x36 skylight at infill roof. demo e staircase to gr fl and construct n stair to gr fl gr fl construct 2 new bdrms, family rm, full bath, laundry. n 68x30 patio door and new 24 x 48 ofh window | $65,000 |
| Oct 18, 2019 | Expired or cancelled cancelled Jul 2024 | 422 Lisbon St | a (2) story addition to the front of the property with a hallway that connects the (e) building to the (n) addition. two bedrooms, one bathroom above garage with (n) entrance.Details
a (2) story addition to the front of the property with a hallway that connects the (e) building to the (n) addition. two bedrooms, one bathroom above garage with (n) entrance. | $500,000 |
| May 16, 2019 | Completed final sign-off Feb 2020 | 937 Clay St | (3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kindDetails
(3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kind | $60,000 |
| Jan 25, 2018 | Completed final sign-off Nov 2018 | 314 Felton St | kitchen remodel. upgrade plumbing and electrical. install new cabinets, appliances, flooring and painting. remodel existing 2.5 bathrooms. install new floor & wall tiles, toilets and shower.Details
kitchen remodel. upgrade plumbing and electrical. install new cabinets, appliances, flooring and painting. remodel existing 2.5 bathrooms. install new floor & wall tiles, toilets and shower. | $20,000 |
| Jul 12, 2016 | Expired or cancelled expired Apr 2024 | 17 Walter U Lum Pl | remodel of building incl: new elevator, upgrade for accessibility @ entry, bathroom & other accessible upgrades. replacing front door with wall/window(no expansion of footprint and equivalent transparency to sidewalk).mechanical & electrical by separate permit.Details
remodel of building incl: new elevator, upgrade for accessibility @ entry, bathroom & other accessible upgrades. replacing front door with wall/window(no expansion of footprint and equivalent transparency to sidewalk).mechanical & electrical by separate permit. | $400,000 |
| May 26, 2016 | Completed final sign-off Aug 2016 | 1755 Clay St | minor construction of new childer's bathrm, replacement of two sinks in existing bath, converson of existing children bath into adult unisex bath, demo of closet, storage room & replace of full height furnature dartition w/ new hall, height partition.Details
minor construction of new childer's bathrm, replacement of two sinks in existing bath, converson of existing children bath into adult unisex bath, demo of closet, storage room & replace of full height furnature dartition w/ new hall, height partition. | $44,550 |
| Jan 26, 2016 | Completed final sign-off Mar 2019 | 869 Ellis St | alterations to extg bathrooms and laundry room including showers and tubs.Details
alterations to extg bathrooms and laundry room including showers and tubs. | $16,000 |
| Jan 3, 2011 | Completed final sign-off Mar 2011 | 415 Raymond Av | 1st fl,garage level: construct non bearing walls for new bath, laundry, bedrooms. repair e exterior deck and stair in kind less than 50%Details
1st fl,garage level: construct non bearing walls for new bath, laundry, bedrooms. repair e exterior deck and stair in kind less than 50% | $25,000 |
| Oct 19, 2010 | Completed final sign-off Oct 2011 | 1180 Palou Av | remodel 2 baths, 1 kitchen. non structural.lighting to comply with cec 150kDetails
remodel 2 baths, 1 kitchen. non structural.lighting to comply with cec 150k | $27,000 |
| Sep 22, 2006 | Completed final sign-off Mar 2007 | 730 Moraga St | per nov 200671514 apt #1,2 & 4: in restrooms change (e) fixtures to (n) - in kitchen change (e) cabinets to (n) - kitchen and bathroom tile in apt #2 & 4 repair and replace fire damaged wood and gyp board repair roof and ext. siding damaged from the fire paint int. and ext. change 2 walls mountDetails
per nov 200671514 apt #1,2 & 4: in restrooms change (e) fixtures to (n) - in kitchen change (e) cabinets to (n) - kitchen and bathroom tile in apt #2 & 4 repair and replace fire damaged wood and gyp board repair roof and ext. siding damaged from the fire paint int. and ext. change 2 walls mount | $70,000 |
| Dec 20, 2000 | Completed final sign-off Mar 2001 | 351 Lakeshore Dr | adendum to 200010122784: remodel on full bath and one half bath, replace window, (n) hardwood floorDetails
adendum to 200010122784: remodel on full bath and one half bath, replace window, (n) hardwood floor | $10,000 |