Hocker Construction
- Based in
- Burlingame
- On San Francisco permits
- Jul 2001 to Oct 2025
- Last 24 months
- 4 permits filed
30 permits since 2000: 20 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 2 completed, 2 in progress, 2 never finaled. Typically 0 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2025 | In progress issued Oct 2025 | 2999 California St | unit 302: kitchen cabinets remove and replace with new. new counter tops, kitchen remodel like for like.Details
unit 302: kitchen cabinets remove and replace with new. new counter tops, kitchen remodel like for like. | $40,000 |
| Jan 23, 2025 | In progress issued Jan 2025 | 2999 California St | unit #305: like for like installation of original cabinets that were saved and new to match. new tile as per existing kitchen.Details
unit #305: like for like installation of original cabinets that were saved and new to match. new tile as per existing kitchen. | $45,000 |
| Sep 27, 2021 | Completed final sign-off Aug 2022 | 960 Green St | kitchen remodel: 2nd floor, approx. 16'x 22'-6". no added new fixtures, no alteration of walls. lights per cebc 150.0(k).Details
kitchen remodel: 2nd floor, approx. 16'x 22'-6". no added new fixtures, no alteration of walls. lights per cebc 150.0(k). | $75,000 |
| Mar 1, 2021 | Never finaled issued Mar 2021, no final | 2542 Sacramento St | unit 202: r &r kitchen cabinets/counter. r&r tub/tile in bathroom. replace 4 doors. paint. no structural work. no framing.Details
unit 202: r &r kitchen cabinets/counter. r&r tub/tile in bathroom. replace 4 doors. paint. no structural work. no framing. | $20,000 |
| May 8, 2015 | Completed final sign-off Mar 2016 | 2311 California St | replace lath plaster with 5/8" gy.bd. at bedroom on third floor. remodel (e) kitchen and bathroom both unit.Details
replace lath plaster with 5/8" gy.bd. at bedroom on third floor. remodel (e) kitchen and bathroom both unit. | $30,000 |
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 1654 Stockton St | unit #4 - remodel bathroom & kitchen, new drywall, new elec, new paint, comply with cec-150k for lighting. no structural work.Details
unit #4 - remodel bathroom & kitchen, new drywall, new elec, new paint, comply with cec-150k for lighting. no structural work. | $40,000 |