Hocker Construction
- Based in
- Burlingame
- On San Francisco permits
- Jul 2001 to Oct 2025
- Last 24 months
- 4 permits filed
30 permits since 2000: 20 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 15 days from filing to permit and 26 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2021 | Completed final sign-off Apr 2021 | 2376 Pacific Av | additional work on existing permit 20190514051. remove and replace siding on deck area 500sfDetails
additional work on existing permit 20190514051. remove and replace siding on deck area 500sf | $18,500 |
| May 14, 2019 | Completed final sign-off Apr 2021 | 2376 Pacific Av | remove tile from front deck above garage and stairs; replace hot mop; replace tile on deck and stairsDetails
remove tile from front deck above garage and stairs; replace hot mop; replace tile on deck and stairs | $55,000 |
| Apr 21, 2015 | Completed final sign-off Mar 2016 | 2311 California St | remodel (e) residential 2 family dwelling, interior living areas. replace/upgrade (e) rear deck, replace windows with new same size windows in (e) locations; add egress windows as req'd. repair (e) in kind exterior surfaces. replace foundation at rear side of bld, remodel 1st,2nd,3rd floorsDetails
remodel (e) residential 2 family dwelling, interior living areas. replace/upgrade (e) rear deck, replace windows with new same size windows in (e) locations; add egress windows as req'd. repair (e) in kind exterior surfaces. replace foundation at rear side of bld, remodel 1st,2nd,3rd floors | $50,000 |
| Apr 25, 2008 | Completed final sign-off May 2008 | 100 Stanyan St | dryrot repair at fromt deck.new jams at garage, both per termite report #08258(items 1and 2)Details
dryrot repair at fromt deck.new jams at garage, both per termite report #08258(items 1and 2) | $5,000 |
| Nov 29, 2001 | Completed final sign-off Feb 2002 | 2813 Folsom St | rev. appl#200107093231 remove & replace (e) rear deck & staircase in kind, require egress fm 3 unitDetails
rev. appl#200107093231 remove & replace (e) rear deck & staircase in kind, require egress fm 3 unit | $10,000 |