Back to kitchen remodel contractors
Hing Wah Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to Jan 2022
- Last 24 months
- 0 permits filed
311 permits since 2000: 264 completed, 23 never finaled, 24 expired or cancelled.
Of the 23 never-finaled permits, 4 are 5 to 10 years old, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
91 kitchen remodel permits: 79 completed, 7 never finaled, 5 expired or cancelled. Typically 4 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2020 | Completed final sign-off Dec 2020 | 200 Brannan St | unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change.Details
unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change. | $40,000 |
| Jan 9, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | 2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroomDetails
2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroom | $50,000 |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 831 Brussels St | 2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132.Details
2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132. | $35,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2022 | 35 Hiliritas Av | add units per ord 95-17. coverting a portion of lower level into adu by closing off a wall, changing entrance to unit, adding kitchen & laundry.Details
add units per ord 95-17. coverting a portion of lower level into adu by closing off a wall, changing entrance to unit, adding kitchen & laundry. | $100,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2023 | 1501 35th Av | comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylightsDetails
comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylights | $20,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 245 Scott St | remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans.Details
remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans. | $80,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2019 | 91 Chattanooga St | revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan.Details
revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan. | |
| Aug 27, 2018 | Completed final sign-off Feb 2021 | 539 05th Av | vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition.Details
vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition. | $850,000 |
| Jun 5, 2018 | Completed final sign-off Apr 2020 | 336 Avila St | revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher naDetails
revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher na | $5,000 |
| Jan 29, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors.Details
horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors. | $190,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 651 04th Av | cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors.Details
cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors. | $325,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2018 | 3839 Folsom St | remodel kitchen and 2 bathrooms, fixtures to remain in same location.Details
remodel kitchen and 2 bathrooms, fixtures to remain in same location. | $30,000 |
| May 26, 2017 | Completed final sign-off Nov 2017 | 2719 Franklin St | revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight.Details
revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight. | $20,000 |
| May 4, 2017 | Completed final sign-off May 2018 | 2288 Sutter St | 1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit)Details
1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit) | $120,000 |
| Apr 18, 2017 | Completed final sign-off Jun 2018 | 1561 07th Av | comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining.Details
comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining. | $105,000 |
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 176 Banks St | 2nd floor: remodel kitchen and bath.Details
2nd floor: remodel kitchen and bath. | $20,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 138 08th Av | rev pa#201604285948: reconfigure kitchen on 2/f and rooms on 3/f per plans.Details
rev pa#201604285948: reconfigure kitchen on 2/f and rooms on 3/f per plans. | |
| Mar 13, 2017 | Completed final sign-off Jun 2019 | 1770 Noe St | adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio.Details
adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio. | $75,000 |
| Jul 28, 2016 | Completed final sign-off Jan 2017 | 2740 Union St | unit #1- remodel kitchen and bathroom per plans.Details
unit #1- remodel kitchen and bathroom per plans. | $20,000 |
| Jun 14, 2016 | Completed final sign-off Apr 2017 | 198 Cresta Vista Dr | 1st flr: reconfigure rooms. 2nd flr: remove wall at kitchen. repair decks at rearDetails
1st flr: reconfigure rooms. 2nd flr: remove wall at kitchen. repair decks at rear | $30,000 |
| May 9, 2016 | Completed final sign-off Nov 2017 | 2719 Franklin St | 1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existingDetails
1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existing | $160,000 |
| May 9, 2016 | Completed final sign-off Mar 2017 | 692 Page St | revision under construction for 201305217463; relocate hydronic system in all units and reconfigure kitchens.Details
revision under construction for 201305217463; relocate hydronic system in all units and reconfigure kitchens. | $5,500 |
| May 9, 2016 | Completed final sign-off Dec 2016 | 680 Page St | revision to app#201305217457. relocate hydronic system in hall closet and reconfigure kitchens in all units. 2/8x7/0. door in all bedroom #3Details
revision to app#201305217457. relocate hydronic system in hall closet and reconfigure kitchens in all units. 2/8x7/0. door in all bedroom #3 | $5,500 |
| May 9, 2016 | Completed final sign-off Dec 2016 | 686 Page St | revision to app#201305217462. relocate rear access. reconfigure kitchens, relocate hydronic units in closet.Details
revision to app#201305217462. relocate rear access. reconfigure kitchens, relocate hydronic units in closet. | $7,500 |
| Apr 28, 2016 | Completed final sign-off Jun 2017 | 138 08th Av | 1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain.Details
1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain. | $180,000 |
| Feb 18, 2016 | Completed final sign-off Apr 2017 | 209 Clipper St | 1st flr: infill at rear add 3 bedrooms,2baths & 1 laundry,new interior stairs,2nd flr: add half bath,remodel bath & kitchen,add new deck & stairs at rear,new front stairs & push back front door 3'-2",new wood siding and wood windows in kind at front.Details
1st flr: infill at rear add 3 bedrooms,2baths & 1 laundry,new interior stairs,2nd flr: add half bath,remodel bath & kitchen,add new deck & stairs at rear,new front stairs & push back front door 3'-2",new wood siding and wood windows in kind at front. | $130,000 |
| Jan 27, 2016 | Completed final sign-off May 2017 | 724 Noe St | basement: add 1 bedroom and 1 bathroom. 1st floor: add 2 bedrooms, 2 bathrooms, 1 laundry and rear deck. 2nd floor: kitchen & and bath, new eoof deck and add 3 skylightd, new stairs from basement to 2nd floor. more than 25% walls to remain,Details
basement: add 1 bedroom and 1 bathroom. 1st floor: add 2 bedrooms, 2 bathrooms, 1 laundry and rear deck. 2nd floor: kitchen & and bath, new eoof deck and add 3 skylightd, new stairs from basement to 2nd floor. more than 25% walls to remain, | $150,000 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 3658 18th St | 1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3.Details
1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3. | $24,000 |
| Nov 16, 2015 | Completed final sign-off Oct 2016 | 40 Almaden Ct | 1st fl add 2 bedrooms, 1 media room, 1 bath, 1 laundry. bring forward and enlarge garage door to 9'. 2nd fl: remodel kitchen and bath, add 1/2 bath, family room, infill lightwell and courtyard. new rear deck. 3rd fl. remodel bath and add roof deck. new stairs from 1st to 3rd fl more than 25% walls.Details
1st fl add 2 bedrooms, 1 media room, 1 bath, 1 laundry. bring forward and enlarge garage door to 9'. 2nd fl: remodel kitchen and bath, add 1/2 bath, family room, infill lightwell and courtyard. new rear deck. 3rd fl. remodel bath and add roof deck. new stairs from 1st to 3rd fl more than 25% walls. | $180,000 |
| Oct 19, 2015 | Completed final sign-off Aug 2016 | 2 Curtis St | 1st fl add 1 office, 2 full baths, 1 family room, laundry room, 2nd fl remodel kitchen and bath, 1 full bath, infill lightwellDetails
1st fl add 1 office, 2 full baths, 1 family room, laundry room, 2nd fl remodel kitchen and bath, 1 full bath, infill lightwell | $80,000 |
| Sep 30, 2015 | Never finaled issued Jan 2016, no final | 2693 22nd St | remodeling unit #2693. modifying walls, adding one bathroom and one laundry room. relocation of kitchen and bedrooms. mep on separate permits.Details
remodeling unit #2693. modifying walls, adding one bathroom and one laundry room. relocation of kitchen and bedrooms. mep on separate permits. | $5,000 |
| Sep 29, 2015 | Completed final sign-off Aug 2016 | 1 Jade Pl | revision to pa 2015-0713-1345, 1st floor: relocate closet in bedroom; 2nd floor - reconfigure kitchen layout; 3rd floor - reconfigure bedrooms and add 1 bathroomDetails
revision to pa 2015-0713-1345, 1st floor: relocate closet in bedroom; 2nd floor - reconfigure kitchen layout; 3rd floor - reconfigure bedrooms and add 1 bathroom | $5,000 |
| Sep 10, 2015 | Completed final sign-off Dec 2016 | 2339 Bryant St | 1st floor: add 2 bedroom, 2 full bath, 1 playroom & laundry room. 2nd floor add 0.5 bath, remodel kitchen and 1 bath. 3rd floor: convert attic space to living space. add family room, 1 bath room, and 1 bedroom. no front exterior changes. all new windows to be wood-clad. add 4 new dormers.Details
1st floor: add 2 bedroom, 2 full bath, 1 playroom & laundry room. 2nd floor add 0.5 bath, remodel kitchen and 1 bath. 3rd floor: convert attic space to living space. add family room, 1 bath room, and 1 bedroom. no front exterior changes. all new windows to be wood-clad. add 4 new dormers. | $380,000 |
| Aug 27, 2015 | Completed final sign-off Feb 2018 | 110 Mangels Av | 1st flr: add 2 bedrms, 2 baths, 1 laundry, and 1 family rm,2nd flr: remodel kitchen & bathrm & add 1 bathrm; rebuild front staircase. and replace front windows with hung wood windows.Details
1st flr: add 2 bedrms, 2 baths, 1 laundry, and 1 family rm,2nd flr: remodel kitchen & bathrm & add 1 bathrm; rebuild front staircase. and replace front windows with hung wood windows. | $110,000 |
| Jun 12, 2015 | Completed final sign-off Jun 2016 | 963 Alabama St | 1st fl - relocate garage and add 3 bedrooms, 2 baths, laundry & interior stairs to 2nd fl. 2nd fl - reconfigure plan to include (n) front rm, 1 bedrm, 1 1/2 bath, liv, dining, kitchen, (n) interior stairs to attic. 3rd fl (attic) convert to (n) family rm & bath, (n) roof deckDetails
1st fl - relocate garage and add 3 bedrooms, 2 baths, laundry & interior stairs to 2nd fl. 2nd fl - reconfigure plan to include (n) front rm, 1 bedrm, 1 1/2 bath, liv, dining, kitchen, (n) interior stairs to attic. 3rd fl (attic) convert to (n) family rm & bath, (n) roof deck | $310,000 |
| Mar 4, 2015 | Completed final sign-off Apr 2016 | 939 Rutland St | unit 939: remodel kitchen, remodel 1 bath - add addition bathroomDetails
unit 939: remodel kitchen, remodel 1 bath - add addition bathroom | $25,000 |
| Jan 30, 2015 | Expired or cancelled expired May 2016 | 2693 22nd St | remodel unit#s 2693 and 2695 22nd street. modify extg walls, add bathroom and laundry. remodel extg bath and kitchen. interior remodel only.Details
remodel unit#s 2693 and 2695 22nd street. modify extg walls, add bathroom and laundry. remodel extg bath and kitchen. interior remodel only. | $60,000 |
| Jan 16, 2015 | Completed final sign-off Jun 2015 | 67 Arago St | 1st floor: add 1 bedroom and 2 full bath. 2nd floor: remodel kitchen, add 1 full bath room and to enlarge the front window with wood material double hung window and to replace the side porch windows with solid wall.Details
1st floor: add 1 bedroom and 2 full bath. 2nd floor: remodel kitchen, add 1 full bath room and to enlarge the front window with wood material double hung window and to replace the side porch windows with solid wall. | $70,000 |
| Nov 17, 2014 | Completed final sign-off Apr 2016 | 744 Potrero Av | 1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room.Details
1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room. | $90,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2015 | 930 Elizabeth St | unit 4 - remodel studio kitchen and 1 bathroom. no structural work. no change on wallsDetails
unit 4 - remodel studio kitchen and 1 bathroom. no structural work. no change on walls | $20,000 |
| Oct 30, 2014 | Completed final sign-off Oct 2015 | 27 Roscoe St | revisionn to permit 200512120106; 1st flr: change kitchen layout, convert full bath to 1/2 bath, & redesign interior staircase, 2nd flr: add 1 master bath, and 1 laundry.Details
revisionn to permit 200512120106; 1st flr: change kitchen layout, convert full bath to 1/2 bath, & redesign interior staircase, 2nd flr: add 1 master bath, and 1 laundry. | $20,000 |
| Oct 28, 2014 | Completed final sign-off Oct 2015 | 525 Kansas St | 1st floor: add one family room, laundry and one full bath. 2nd floor: remodel bathroom and kitchen. add one full bath.Details
1st floor: add one family room, laundry and one full bath. 2nd floor: remodel bathroom and kitchen. add one full bath. | $75,000 |
| Sep 4, 2014 | Completed final sign-off May 2016 | 159 Belvedere St | remodel 1st fl:add 2 bedrooms, 1 full bath, study room and laundry. 2nd floor: total remodel 1 bedroom, 1 full and .5 bath, kitchen, living and dining room. new interior stairs to 1st floor. 3rd floor: total remodel 2 bedrooms, 2 full baths, kitchen, living and dining room, newDetails
remodel 1st fl:add 2 bedrooms, 1 full bath, study room and laundry. 2nd floor: total remodel 1 bedroom, 1 full and .5 bath, kitchen, living and dining room. new interior stairs to 1st floor. 3rd floor: total remodel 2 bedrooms, 2 full baths, kitchen, living and dining room, new | $250,000 |
| Aug 25, 2014 | Completed final sign-off Jun 2016 | 150 Vicksburg St | remodel 1st flr unit 150: add 1 bedroom, 1 family room, and 1 full bath, remodel 2nd flr unit #150: 1 kitchen, (1) 1/2 bath, 1 living room, 1 family room, and new internal stairs to 1st flr, remodel 3rd flr unit #152: 2 bedrooms, 2 baths, 1 living room and 1 kitchen.Details
remodel 1st flr unit 150: add 1 bedroom, 1 family room, and 1 full bath, remodel 2nd flr unit #150: 1 kitchen, (1) 1/2 bath, 1 living room, 1 family room, and new internal stairs to 1st flr, remodel 3rd flr unit #152: 2 bedrooms, 2 baths, 1 living room and 1 kitchen. | $110,000 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 930 Elizabeth St | remodel unit #2 studio kitchen and 1 bathroom. no structural work, same location for all the fixtures.Details
remodel unit #2 studio kitchen and 1 bathroom. no structural work, same location for all the fixtures. | $10,000 |
| Jul 30, 2014 | Completed final sign-off Dec 2014 | 769 Pacheco St | remodel kitchen and 1 bathroom at 2nd fl per plan. new recessed lights at kitchen area. new bedroom, entertainment room, and bathroom on 1st fl floor planDetails
remodel kitchen and 1 bathroom at 2nd fl per plan. new recessed lights at kitchen area. new bedroom, entertainment room, and bathroom on 1st fl floor plan | $15,000 |
| Jul 17, 2014 | Never finaled issued Jul 2014, no final | 1669 Alabama St | remove non-permitted partition walls, kitchen and bathroom on ground floor and convert back to original garage space. thus permanently removing from residential living space use. legality of second floor area use is not under this permit.Details
remove non-permitted partition walls, kitchen and bathroom on ground floor and convert back to original garage space. thus permanently removing from residential living space use. legality of second floor area use is not under this permit. | $5,000 |
| Jul 14, 2014 | Completed final sign-off Nov 2014 | 972 Greenwich St | remodel kitchen and 2.5 baths. no change to walls.Details
remodel kitchen and 2.5 baths. no change to walls. | $25,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2016 | 150 Vicksburg St | unit#150 - 1 kitchen & 1 bathroom remodel. unit#152 - 1 kitchen & 1 bathroom remodel.Details
unit#150 - 1 kitchen & 1 bathroom remodel. unit#152 - 1 kitchen & 1 bathroom remodel. | $50,000 |
| Jun 12, 2014 | Completed final sign-off Mar 2015 | 853 Peralta Av | work at basement & 1/f: basement- add 1 family room, 1 full bath & 1 media room. 1/f- convert play/bedroom to master bedroom, rearrange bath/laundry location, new stairs to basement. 2/f- remove wall at kitchen, rev. to pa#201405196104. n/a ordinance #155-13Details
work at basement & 1/f: basement- add 1 family room, 1 full bath & 1 media room. 1/f- convert play/bedroom to master bedroom, rearrange bath/laundry location, new stairs to basement. 2/f- remove wall at kitchen, rev. to pa#201405196104. n/a ordinance #155-13 | $80,000 |
| May 19, 2014 | Never finaled issued May 2014, no final | 853 Peralta Av | two (2) bathrooms, (1) kitchen remodel. no walls moved, removed or added. all fixture locatons and layout to remain unchanged.Details
two (2) bathrooms, (1) kitchen remodel. no walls moved, removed or added. all fixture locatons and layout to remain unchanged. | $25,000 |
| Mar 14, 2014 | Never finaled issued Mar 2014, no final | 671 Orizaba Av | remodel kitchen and bath. no new lighting work under this permit.Details
remodel kitchen and bath. no new lighting work under this permit. | $20,000 |
| Mar 11, 2014 | Completed final sign-off Jun 2021 | 357 Franconia St | 2nd floor:remodel kitchen and bath.Details
2nd floor:remodel kitchen and bath. | $20,000 |
| Feb 25, 2014 | Completed final sign-off Dec 2015 | 6423 California St | 1/f- (n)steel moment frames & grade beams in (e) commercial space; demolish (e) stair & deck in rear yard; 2/f - add 1 (n) bath rm, remodel kitchen, bathrms, bedrooms & living rm.Details
1/f- (n)steel moment frames & grade beams in (e) commercial space; demolish (e) stair & deck in rear yard; 2/f - add 1 (n) bath rm, remodel kitchen, bathrms, bedrooms & living rm. | $90,000 |
| Feb 13, 2014 | Completed final sign-off Sep 2014 | 778 35th Av | remodel 1st floor:add 1 full bath, 2 bedrooms and 1 family room. remodel 2nd floor: kitchen, 1/2 bath, living dining and office. remodel 3rd floor: 1 bath, add 2 full baths, 3 bedrooms. remove all extg plaster and laths, replace with 5/8 type x gyp bd throughout ceiling/walls.Details
remodel 1st floor:add 1 full bath, 2 bedrooms and 1 family room. remodel 2nd floor: kitchen, 1/2 bath, living dining and office. remodel 3rd floor: 1 bath, add 2 full baths, 3 bedrooms. remove all extg plaster and laths, replace with 5/8 type x gyp bd throughout ceiling/walls. | $60,000 |
| Feb 7, 2014 | Completed final sign-off Dec 2014 | 2955 23rd St | 1/f: lower floor by 1'0", add bedroom, full bath & family room. 2/f & 3/f: add 1.5 baths, remodel kitchen, bath & all rooms. remove all plaster/bath, new 5/8" type 'x' gyp. bd., replace windows, front wood type.Details
1/f: lower floor by 1'0", add bedroom, full bath & family room. 2/f & 3/f: add 1.5 baths, remodel kitchen, bath & all rooms. remove all plaster/bath, new 5/8" type 'x' gyp. bd., replace windows, front wood type. | $250,000 |
| Feb 5, 2014 | Completed final sign-off Oct 2014 | 666 Castro St | remodel and reconfiguration of existing kitchen, reconfigure existing bedrooms, remodel existing bath, add master bath at 3rd flDetails
remodel and reconfiguration of existing kitchen, reconfigure existing bedrooms, remodel existing bath, add master bath at 3rd fl | $75,000 |
| Dec 18, 2013 | Completed final sign-off Sep 2015 | 457 Waller St | remodel entire interior 3 unit bldg: remove all plaster & laths & replace w/5/8" type "x" gyp bd. replace all windows w/vinyl type except front shall be wood clad in kind. each unit 2 bedrooms, 2 full baths, & relocate kitchen. replace rear ext stairs in-kind.Details
remodel entire interior 3 unit bldg: remove all plaster & laths & replace w/5/8" type "x" gyp bd. replace all windows w/vinyl type except front shall be wood clad in kind. each unit 2 bedrooms, 2 full baths, & relocate kitchen. replace rear ext stairs in-kind. | $250,000 |
| Nov 13, 2013 | Completed final sign-off Dec 2014 | 607 07th Av | 1/f: add 1 master bedroom, 1 full bath, & 1 family room. 2/f: remodel kitchen, 1/2 bth, & add stairs leading to 1st floor. 3/f: remodel bath, add master bath #2, & convert 2 rear bedrooms to master bedroom #2. attic fl: convert attic space to master bedroom & bathroom, add nw skylight,Details
1/f: add 1 master bedroom, 1 full bath, & 1 family room. 2/f: remodel kitchen, 1/2 bth, & add stairs leading to 1st floor. 3/f: remodel bath, add master bath #2, & convert 2 rear bedrooms to master bedroom #2. attic fl: convert attic space to master bedroom & bathroom, add nw skylight, | $250,000 |
| Oct 28, 2013 | Completed final sign-off Dec 2015 | 330 21st Av | 1st fl-lower floor 1'-9", add 1 bedroom, 1 full bathroom, laundry & family room. 2nd fl-remodel kitchen, add half bathroom, add stairs to 1st fl, re-build rear deck. 3rd fl-remodel bathroom, add master bathroom, relocate bedroom closetsDetails
1st fl-lower floor 1'-9", add 1 bedroom, 1 full bathroom, laundry & family room. 2nd fl-remodel kitchen, add half bathroom, add stairs to 1st fl, re-build rear deck. 3rd fl-remodel bathroom, add master bathroom, relocate bedroom closets | $120,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 5930 California St | 1. complete kitchen remodel with new fixtures, cabinets and countertop for apartment #2 on 2nd floor. 2. convert (e) storage room to new, 2nd bedroom. provide new egress window for new bedroomDetails
1. complete kitchen remodel with new fixtures, cabinets and countertop for apartment #2 on 2nd floor. 2. convert (e) storage room to new, 2nd bedroom. provide new egress window for new bedroom | $15,000 |
| Oct 10, 2013 | Completed final sign-off Apr 2014 | 695 27th Av | 1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind.Details
1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind. | $80,000 |
| Oct 8, 2013 | Expired or cancelled expired Oct 2017 | 151 16th Av | new family room, bedroom, and bathroom at ground floor. remodel kitchen and half bathroom at 2n floor. remodel 2 bathroom and bedrooms at 3rd floor.Details
new family room, bedroom, and bathroom at ground floor. remodel kitchen and half bathroom at 2n floor. remodel 2 bathroom and bedrooms at 3rd floor. | $85,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 2371 27th Av | 1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite.Details
1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite. | $50,000 |
| Aug 28, 2013 | Never finaled issued Aug 2013, no final | 1365 06th Av | rev. to pa#201307101458- 1/f: clearify bath #1. 2/f: remodel kitchen & bath. 3/f: add full bath, remodel bath & convert 2 bedroom to 1 bedroom.Details
rev. to pa#201307101458- 1/f: clearify bath #1. 2/f: remodel kitchen & bath. 3/f: add full bath, remodel bath & convert 2 bedroom to 1 bedroom. | $18,000 |
| Aug 8, 2013 | Completed final sign-off Feb 2015 | 2831 Bryant St | remodel 1st fl. add 2 bedrooms, full bath, storage room. 2nd fl remodel kitchen, dining, living rm, add 1/2 bath, rear deck and stairs to yard, add interior stairs to 1st fl. 3rd fl remodel 2 bedroom, bath and full bath; work will comply with nov 201032748Details
remodel 1st fl. add 2 bedrooms, full bath, storage room. 2nd fl remodel kitchen, dining, living rm, add 1/2 bath, rear deck and stairs to yard, add interior stairs to 1st fl. 3rd fl remodel 2 bedroom, bath and full bath; work will comply with nov 201032748 | $130,000 |
| Aug 7, 2013 | Completed final sign-off Feb 2014 | 391 Girard St | revision to app#201303071739. rearrange layout. 1st floor:add 2 bedroom, bath, and storage. 2nd floor: add bath, remodel kitchen, bath, 2 bedroom, and dining room.Details
revision to app#201303071739. rearrange layout. 1st floor:add 2 bedroom, bath, and storage. 2nd floor: add bath, remodel kitchen, bath, 2 bedroom, and dining room. | |
| Jul 8, 2013 | Completed final sign-off Oct 2013 | 36 Pasadena St | remodel 1st floor:add full bath, laundry room & home office. remodel 2nd floor:remodel kitchen and bath.Details
remodel 1st floor:add full bath, laundry room & home office. remodel 2nd floor:remodel kitchen and bath. | $32,000 |
| Apr 5, 2013 | Expired or cancelled expired Sep 2019 | 1218 44th Av | 2nd floor:remove full bath at living room and relocate to nook area. add kitchen island. add wet bar at living room.Details
2nd floor:remove full bath at living room and relocate to nook area. add kitchen island. add wet bar at living room. | $20,000 |
| Mar 22, 2013 | Completed final sign-off Aug 2013 | 574 Prentiss St | to comply with nov# 201040921, #200677657, #200677854 - remodel ground floor - add family room, full bath & laundry. 2nd floor: remodel kitchen & bath.Details
to comply with nov# 201040921, #200677657, #200677854 - remodel ground floor - add family room, full bath & laundry. 2nd floor: remodel kitchen & bath. | $48,000 |
| Feb 27, 2013 | Completed final sign-off Feb 2014 | 339 31st Av | remodel entire house. 1st fl (n) one bathrm, (n) one bedrm & (n) one laundry. 2nd fl, remodel kitchen, add 1/2 bath & add stairs to 1st fl. 3rd fl remdoel bath, add (n) one bathrm convert two bedroom to 1 bedrm. 4th fl, convert attic space to living space, add (n) one master bedrm & (n) master bathrDetails
remodel entire house. 1st fl (n) one bathrm, (n) one bedrm & (n) one laundry. 2nd fl, remodel kitchen, add 1/2 bath & add stairs to 1st fl. 3rd fl remdoel bath, add (n) one bathrm convert two bedroom to 1 bedrm. 4th fl, convert attic space to living space, add (n) one master bedrm & (n) master bathr | $305,000 |
| Jan 23, 2013 | Completed final sign-off Aug 2013 | 2 Valdez Av | 1st floor:add bedroom, family room, storage, laundry and full bath. 2nd floor:add 2 full baths and remodel kitchen and ext bath.Details
1st floor:add bedroom, family room, storage, laundry and full bath. 2nd floor:add 2 full baths and remodel kitchen and ext bath. | $50,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2013 | 36 Camp St | remodel (e) kitchens/bathrms, change 1/2 bathrm to full bathrm, install beams for removing inter walls for residence. add den, bathrm, bedrm (503 sq ft) on 1st fl for unit #36. add 243 sq ft roof deck for unit #38 only. replace windows & exterior doors for buildingDetails
remodel (e) kitchens/bathrms, change 1/2 bathrm to full bathrm, install beams for removing inter walls for residence. add den, bathrm, bedrm (503 sq ft) on 1st fl for unit #36. add 243 sq ft roof deck for unit #38 only. replace windows & exterior doors for building | $120,000 |
| Aug 31, 2012 | Completed final sign-off Jan 2013 | 161 Joost Av | comply with complaint # 200677201 & 199812138 - convert bsmt level lower by 1'-0" to create one bedroom, full bath and family room. 1st floor - remodel bath, replace stairs to bsmt. reduce garage door size, 2nd floor - remodel bath & kitchen and add stairs to 1st floor.Details
comply with complaint # 200677201 & 199812138 - convert bsmt level lower by 1'-0" to create one bedroom, full bath and family room. 1st floor - remodel bath, replace stairs to bsmt. reduce garage door size, 2nd floor - remodel bath & kitchen and add stairs to 1st floor. | $70,000 |
| Jun 7, 2012 | Completed final sign-off Aug 2012 | 1 Cabrillo St | remodel unit 107: kitchen and bath, remodel unit 303: kitchen and bath. no wall changes, replace cabinets and fixtures only. no window work on this permit.Details
remodel unit 107: kitchen and bath, remodel unit 303: kitchen and bath. no wall changes, replace cabinets and fixtures only. no window work on this permit. | $35,000 |
| Nov 28, 2011 | Completed final sign-off Sep 2012 | 1218 44th Av | remodel ground floor-add family room, half bathroom & 2 bedrooms. remodel 2nd floor-remodel kitchen, bathroom, add 1 full bathroom, replace all exterior windows (3 fiberglass clad wood at front)Details
remodel ground floor-add family room, half bathroom & 2 bedrooms. remodel 2nd floor-remodel kitchen, bathroom, add 1 full bathroom, replace all exterior windows (3 fiberglass clad wood at front) | $65,000 |
| Sep 28, 2011 | Completed final sign-off Apr 2012 | 1159 Plymouth Av | remodel ground floor. add bedroom, half bath, family room and play room. remodel 2nd floor kitchen and add full bath at pantry. replace all 14 windows,front shall be wood clad type.Details
remodel ground floor. add bedroom, half bath, family room and play room. remodel 2nd floor kitchen and add full bath at pantry. replace all 14 windows,front shall be wood clad type. | $60,000 |
| Sep 16, 2011 | Never finaled issued Sep 2011, no final | 5816 Geary Bl | unit #1. remodel kitchen. 50& fl. lighting to comply with cec 150k. no change to walls, windows, doors.Details
unit #1. remodel kitchen. 50& fl. lighting to comply with cec 150k. no change to walls, windows, doors. | $10,000 |
| May 2, 2011 | Completed final sign-off Aug 2011 | 763 41st Av | remodel 2nd floor kitchen & bath 50% fluorescent lighting at kitchen.Details
remodel 2nd floor kitchen & bath 50% fluorescent lighting at kitchen. | $21,000 |
| Sep 20, 2010 | Expired or cancelled expired Oct 2012 | 1111 Green St | revision to 200509294341. units 1117, 1119, 1123, and 1125. unit 117: remodel kitch,bed #1, bath,bed #2 closet 1125: remodel kit, playroom, closet, bath, remove pantry 1119: remodel kitchen, bed #1, bath, bed #3, add bath 1123: remodel bath at bed#4, remove bath at living roomDetails
revision to 200509294341. units 1117, 1119, 1123, and 1125. unit 117: remodel kitch,bed #1, bath,bed #2 closet 1125: remodel kit, playroom, closet, bath, remove pantry 1119: remodel kitchen, bed #1, bath, bed #3, add bath 1123: remodel bath at bed#4, remove bath at living room | $40,000 |
| Feb 8, 2010 | Never finaled issued Feb 2010, no final | 118 07th Av | remodel 2nd floor kitchen & add 1 full bathroom. replace 5 rear windows in kind. add laundry hook-up.Details
remodel 2nd floor kitchen & add 1 full bathroom. replace 5 rear windows in kind. add laundry hook-up. | $20,000 |
| Nov 30, 2009 | Expired or cancelled expired Feb 2026 | 261 Dolores St | revision to pa # 2004.04.19.1654. reconfigure interior kitchens, baths, bedroom within approved building envelope. remove light well from approved plan from 2nd to 4th floors. change stair penthouse to roof match per cbc 2007 1009.11.Details
revision to pa # 2004.04.19.1654. reconfigure interior kitchens, baths, bedroom within approved building envelope. remove light well from approved plan from 2nd to 4th floors. change stair penthouse to roof match per cbc 2007 1009.11. | $25,000 |
| Nov 12, 2009 | Completed final sign-off Feb 2010 | 1385 19th Av | remodel 3rd flr unit 1387 kitchenand bath, replace cabs, counter top, tile, sink, toilet at least 50% fluorescent lighting in kitchenDetails
remodel 3rd flr unit 1387 kitchenand bath, replace cabs, counter top, tile, sink, toilet at least 50% fluorescent lighting in kitchen | $20,000 |
| Nov 9, 2009 | Completed final sign-off Feb 2011 | 1624 Bay St | revision to pa# 2009.07.03.1975. reconfigure kitchen and bathrooms in akk 4 levels. omit skylightsDetails
revision to pa# 2009.07.03.1975. reconfigure kitchen and bathrooms in akk 4 levels. omit skylights | $9,000 |
| Oct 2, 2009 | Completed final sign-off Nov 2009 | 149 Joost Av | remodel 2nd floor bath & kitchen, repalce fixtures,tile, countertop, cabinets.Details
remodel 2nd floor bath & kitchen, repalce fixtures,tile, countertop, cabinets. | $15,000 |
| Mar 13, 2009 | Completed final sign-off Oct 2009 | 56 Sycamore St | revision to pa #200901130130, remove remaining 50% plaster & lath, voluntary seismic upgrade 3rd floor only. add new bath & relocate kitchen.Details
revision to pa #200901130130, remove remaining 50% plaster & lath, voluntary seismic upgrade 3rd floor only. add new bath & relocate kitchen. | $26,000 |
| Oct 24, 2008 | Completed final sign-off Mar 2009 | 2155 26th Av | gound floor: add 2 bedrooms, 2 baths, family room & laundry. 2nd floor: relocate kitchen, ne study, add new bath, remodel 1/2 bath, remove shower & install new toilet. re-sheetrock less than 50%.Details
gound floor: add 2 bedrooms, 2 baths, family room & laundry. 2nd floor: relocate kitchen, ne study, add new bath, remodel 1/2 bath, remove shower & install new toilet. re-sheetrock less than 50%. | $90,000 |
| Jan 31, 2008 | Completed final sign-off Jun 2008 | 2340 20th Av | remodel 2nd floor flat, kitchen and bath remodel. replace 4 front windows, wood type, 4 rear and 2 side vinyl windows. upgrade 2 electrical panels to 100 amp in garage under seperate permit.Details
remodel 2nd floor flat, kitchen and bath remodel. replace 4 front windows, wood type, 4 rear and 2 side vinyl windows. upgrade 2 electrical panels to 100 amp in garage under seperate permit. | $23,000 |
| Dec 11, 2007 | Completed final sign-off Feb 2008 | 2358 20th Av | to remodel 2nd & 3rd floor kitchen/bath, add one bathroom at each units. (replace fixtures & cabinets). ground floor: relocate laundry, replace two furnaces & water heaters.Details
to remodel 2nd & 3rd floor kitchen/bath, add one bathroom at each units. (replace fixtures & cabinets). ground floor: relocate laundry, replace two furnaces & water heaters. | $53,000 |
| Nov 16, 2007 | Completed final sign-off Jan 2008 | 2831 San Bruno Av | kitchen remodelDetails
kitchen remodel | $8,000 |
| Feb 14, 2005 | Completed final sign-off May 2005 | 1562 20th Av | to remodel existing kitchen- remove & replace cabinets, non structural workDetails
to remodel existing kitchen- remove & replace cabinets, non structural work | $13,000 |