Back to bathroom remodel contractors
Hing Wah Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to Jan 2022
- Last 24 months
- 0 permits filed
311 permits since 2000: 264 completed, 23 never finaled, 24 expired or cancelled.
Of the 23 never-finaled permits, 4 are 5 to 10 years old, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
151 bathroom remodel permits: 134 completed, 10 never finaled, 7 expired or cancelled. Typically 5 days from filing to permit and 280 days from permit to final inspection.
Showing the 100 most recent of 151.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2020 | Completed final sign-off Jul 2021 | 565 Alvarado St | basement: convert storage space into den & add 1 full bath. 2nd fl: remodel 1 full bath & add 1 full bath.Details
basement: convert storage space into den & add 1 full bath. 2nd fl: remodel 1 full bath & add 1 full bath. | $30,000 |
| Aug 31, 2020 | Completed final sign-off Dec 2020 | 200 Brannan St | unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change.Details
unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change. | $40,000 |
| Jul 15, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | rev to pa# 202001091542; interior modification and add half bathDetails
rev to pa# 202001091542; interior modification and add half bath | $2,000 |
| Jan 9, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | 2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroomDetails
2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroom | $50,000 |
| Oct 10, 2019 | Completed final sign-off Sep 2020 | 831 Brussels St | revisiont to pa 201909161762. 1st floor - add 1 bedroom, 1 full bath and family roomDetails
revisiont to pa 201909161762. 1st floor - add 1 bedroom, 1 full bath and family room | $60,000 |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 831 Brussels St | 2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132.Details
2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132. | $35,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2022 | 35 Hiliritas Av | vertical addition. add 3/fl master complete interior remodel, reconfigure space, suite & deck & add 1 bedroom, 1 bath on ground floor.Details
vertical addition. add 3/fl master complete interior remodel, reconfigure space, suite & deck & add 1 bedroom, 1 bath on ground floor. | $230,000 |
| Jun 27, 2019 | Completed final sign-off Sep 2019 | 750 Florida St | rev to pa# 201902082485; revise ada bathroom layout and remove skylights from building 'a' second floorDetails
rev to pa# 201902082485; revise ada bathroom layout and remove skylights from building 'a' second floor | |
| Apr 17, 2019 | Completed final sign-off May 2020 | 198 Guerrero St | interior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units.Details
interior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units. | $100,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2023 | 1501 35th Av | comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylightsDetails
comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylights | $20,000 |
| Jan 11, 2019 | Completed final sign-off Sep 2019 | 2300 39th Av | 1st floor: add 2 bedrooms and 2 full baths.Details
1st floor: add 2 bedrooms and 2 full baths. | $80,000 |
| Dec 20, 2018 | Completed final sign-off Jul 2020 | 1910 Funston Av | one story rear addition with roof deck. 1st fl: add 1 bedroom,1 bath, family room and laundry. 2nd floor:new roof deckDetails
one story rear addition with roof deck. 1st fl: add 1 bedroom,1 bath, family room and laundry. 2nd floor:new roof deck | $40,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 245 Scott St | remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans.Details
remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans. | $80,000 |
| Oct 4, 2018 | Completed final sign-off Mar 2019 | 130 10th St | ti work add ada bathroom on 1st flr and remove non load bearing partition wallsDetails
ti work add ada bathroom on 1st flr and remove non load bearing partition walls | $20,000 |
| Sep 11, 2018 | Expired or cancelled withdrawn Jul 2019 | 563 Alvarado St | revision to 20180221174 & 201612285969 change access from garage to interior space. reconfigure 3rd floor layout: bedroom & bathroom count remain the sameDetails
revision to 20180221174 & 201612285969 change access from garage to interior space. reconfigure 3rd floor layout: bedroom & bathroom count remain the same | $4,000 |
| Aug 27, 2018 | Completed final sign-off Feb 2021 | 539 05th Av | vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition.Details
vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition. | $850,000 |
| Jun 5, 2018 | Completed final sign-off Apr 2020 | 336 Avila St | revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher naDetails
revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher na | $5,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2019 | 563 Alvarado St | revision to pa #201612285969. reconfigure approved layout for first floor. expand living space into previously approved storage and crawl space. provide new bedroom, bathroom spaces, lightwell. all work below grade, not visible from street.Details
revision to pa #201612285969. reconfigure approved layout for first floor. expand living space into previously approved storage and crawl space. provide new bedroom, bathroom spaces, lightwell. all work below grade, not visible from street. | $35,000 |
| Feb 1, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floorDetails
in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floor | $440,000 |
| Jan 29, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors.Details
horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors. | $190,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 651 04th Av | cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors.Details
cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors. | $325,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2018 | 3839 Folsom St | remodel kitchen and 2 bathrooms, fixtures to remain in same location.Details
remodel kitchen and 2 bathrooms, fixtures to remain in same location. | $30,000 |
| Oct 12, 2017 | Completed final sign-off Oct 2019 | 1442 Funston Av | renovation of existing 2 unit bldg. expand lower unit into gr fl storage space. behind garage unit 1442 to be reconfigured as 2 bedrm, 3 bath. unit 1444 to be reconfigured as 4 bedrm,3 bath. new deck to grade at rear yard. less than 10' above gradeDetails
renovation of existing 2 unit bldg. expand lower unit into gr fl storage space. behind garage unit 1442 to be reconfigured as 2 bedrm, 3 bath. unit 1444 to be reconfigured as 4 bedrm,3 bath. new deck to grade at rear yard. less than 10' above grade | $150,000 |
| Jun 29, 2017 | Completed final sign-off Jan 2019 | 177 08th Av | rev. to pa#201508134130. 1/f- interior reconfiguration to include 1 bedroom, 1 study, 1 laundry, 1 bath & 1 media. 2/f & 3/f- interior room reconfiguration. new stairs at front of building. 2 new skylgihts on 3/fDetails
rev. to pa#201508134130. 1/f- interior reconfiguration to include 1 bedroom, 1 study, 1 laundry, 1 bath & 1 media. 2/f & 3/f- interior room reconfiguration. new stairs at front of building. 2 new skylgihts on 3/f | $5,000 |
| Jun 26, 2017 | Completed final sign-off Jul 2019 | 4639 California St | horizontal extension @ 1st fl under 2nd deck to create habitable living space. add (n) bathroom, bedroom, laundry closet & family room. (n) interior stair connecting 2nd & 1st floors. convert (e) 2nd fl bath to powder room. infill lightwell @ 2nd flDetails
horizontal extension @ 1st fl under 2nd deck to create habitable living space. add (n) bathroom, bedroom, laundry closet & family room. (n) interior stair connecting 2nd & 1st floors. convert (e) 2nd fl bath to powder room. infill lightwell @ 2nd fl | $77,000 |
| Jun 1, 2017 | Completed final sign-off Feb 2018 | 50 Valmar Tr | 1st fl: add 2 bedrooms, 2 full baths, and laundry room. 2nd fl: new skylight and replace windows, new deck at rear. front 2 windows to be replaced in-kind with aluminum clad wood.Details
1st fl: add 2 bedrooms, 2 full baths, and laundry room. 2nd fl: new skylight and replace windows, new deck at rear. front 2 windows to be replaced in-kind with aluminum clad wood. | $50,000 |
| May 26, 2017 | Completed final sign-off Nov 2017 | 2719 Franklin St | revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight.Details
revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight. | $20,000 |
| May 4, 2017 | Completed final sign-off May 2018 | 2288 Sutter St | 1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit)Details
1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit) | $120,000 |
| Apr 19, 2017 | Completed final sign-off Jun 2018 | 1559 07th Av | 2/f: remodel complete total floor and add 1 bathroom, reconfigure interior stairs. 1/f: unit legalization sep permit (ref 201704184284).Details
2/f: remodel complete total floor and add 1 bathroom, reconfigure interior stairs. 1/f: unit legalization sep permit (ref 201704184284). | $60,000 |
| Apr 18, 2017 | Completed final sign-off Jun 2018 | 1561 07th Av | comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining.Details
comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining. | $105,000 |
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 176 Banks St | 2nd floor: remodel kitchen and bath.Details
2nd floor: remodel kitchen and bath. | $20,000 |
| Mar 1, 2017 | Completed final sign-off Mar 2017 | 917 Florida St | administrative permit to correct number of bathrooms under permit #2015-09-03-6019 on ground floor. approved plans shows 3 bathrooms.Details
administrative permit to correct number of bathrooms under permit #2015-09-03-6019 on ground floor. approved plans shows 3 bathrooms. | |
| Sep 16, 2016 | Completed final sign-off Jul 2017 | 159 07th Av | 1st flr: add 1 bedroom, 1 den and 2 full baths, new interior stairs to 2nd 2nd flr: total remodel, new cantilevered deck at rear 3rd flr: total remodel, add 1bath and laundry, new spiral stairs to roof roof: new roof deck, more than 25% walls remainDetails
1st flr: add 1 bedroom, 1 den and 2 full baths, new interior stairs to 2nd 2nd flr: total remodel, new cantilevered deck at rear 3rd flr: total remodel, add 1bath and laundry, new spiral stairs to roof roof: new roof deck, more than 25% walls remain | $380,000 |
| Jul 28, 2016 | Completed final sign-off Jan 2017 | 2740 Union St | unit #1- remodel kitchen and bathroom per plans.Details
unit #1- remodel kitchen and bathroom per plans. | $20,000 |
| May 9, 2016 | Completed final sign-off Nov 2017 | 2719 Franklin St | 1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existingDetails
1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existing | $160,000 |
| May 9, 2016 | Completed final sign-off Mar 2017 | 698 Page St | revision to work under construction 201305217464, reconfigure bedroom, bathroom in unit #1 and 2 hr access to rear yard. relocate hydronic in all units to closet. concrete planter in rear yard.Details
revision to work under construction 201305217464, reconfigure bedroom, bathroom in unit #1 and 2 hr access to rear yard. relocate hydronic in all units to closet. concrete planter in rear yard. | $7,500 |
| Apr 28, 2016 | Completed final sign-off Jun 2017 | 138 08th Av | 1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain.Details
1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain. | $180,000 |
| Feb 18, 2016 | Completed final sign-off Apr 2017 | 209 Clipper St | 1st flr: infill at rear add 3 bedrooms,2baths & 1 laundry,new interior stairs,2nd flr: add half bath,remodel bath & kitchen,add new deck & stairs at rear,new front stairs & push back front door 3'-2",new wood siding and wood windows in kind at front.Details
1st flr: infill at rear add 3 bedrooms,2baths & 1 laundry,new interior stairs,2nd flr: add half bath,remodel bath & kitchen,add new deck & stairs at rear,new front stairs & push back front door 3'-2",new wood siding and wood windows in kind at front. | $130,000 |
| Jan 27, 2016 | Completed final sign-off May 2017 | 724 Noe St | basement: add 1 bedroom and 1 bathroom. 1st floor: add 2 bedrooms, 2 bathrooms, 1 laundry and rear deck. 2nd floor: kitchen & and bath, new eoof deck and add 3 skylightd, new stairs from basement to 2nd floor. more than 25% walls to remain,Details
basement: add 1 bedroom and 1 bathroom. 1st floor: add 2 bedrooms, 2 bathrooms, 1 laundry and rear deck. 2nd floor: kitchen & and bath, new eoof deck and add 3 skylightd, new stairs from basement to 2nd floor. more than 25% walls to remain, | $150,000 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 3658 18th St | 1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3.Details
1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3. | $24,000 |
| Nov 16, 2015 | Completed final sign-off Oct 2016 | 40 Almaden Ct | 1st fl add 2 bedrooms, 1 media room, 1 bath, 1 laundry. bring forward and enlarge garage door to 9'. 2nd fl: remodel kitchen and bath, add 1/2 bath, family room, infill lightwell and courtyard. new rear deck. 3rd fl. remodel bath and add roof deck. new stairs from 1st to 3rd fl more than 25% walls.Details
1st fl add 2 bedrooms, 1 media room, 1 bath, 1 laundry. bring forward and enlarge garage door to 9'. 2nd fl: remodel kitchen and bath, add 1/2 bath, family room, infill lightwell and courtyard. new rear deck. 3rd fl. remodel bath and add roof deck. new stairs from 1st to 3rd fl more than 25% walls. | $180,000 |
| Oct 26, 2015 | Completed final sign-off May 2019 | 336 Avila St | new 3rd floor addition to an (e) 2 story sfr (master suite : add 3 bedrooms and 2 baths); general interior remodeling of existing 2 floors. ** maher: n/a **Details
new 3rd floor addition to an (e) 2 story sfr (master suite : add 3 bedrooms and 2 baths); general interior remodeling of existing 2 floors. ** maher: n/a ** | $250,000 |
| Oct 19, 2015 | Completed final sign-off Aug 2016 | 2 Curtis St | 1st fl add 1 office, 2 full baths, 1 family room, laundry room, 2nd fl remodel kitchen and bath, 1 full bath, infill lightwellDetails
1st fl add 1 office, 2 full baths, 1 family room, laundry room, 2nd fl remodel kitchen and bath, 1 full bath, infill lightwell | $80,000 |
| Sep 30, 2015 | Never finaled issued Jan 2016, no final | 2693 22nd St | remodeling unit #2693. modifying walls, adding one bathroom and one laundry room. relocation of kitchen and bedrooms. mep on separate permits.Details
remodeling unit #2693. modifying walls, adding one bathroom and one laundry room. relocation of kitchen and bedrooms. mep on separate permits. | $5,000 |
| Sep 29, 2015 | Completed final sign-off Aug 2016 | 1 Jade Pl | revision to pa 2015-0713-1345, 1st floor: relocate closet in bedroom; 2nd floor - reconfigure kitchen layout; 3rd floor - reconfigure bedrooms and add 1 bathroomDetails
revision to pa 2015-0713-1345, 1st floor: relocate closet in bedroom; 2nd floor - reconfigure kitchen layout; 3rd floor - reconfigure bedrooms and add 1 bathroom | $5,000 |
| Sep 10, 2015 | Completed final sign-off Dec 2016 | 2339 Bryant St | 1st floor: add 2 bedroom, 2 full bath, 1 playroom & laundry room. 2nd floor add 0.5 bath, remodel kitchen and 1 bath. 3rd floor: convert attic space to living space. add family room, 1 bath room, and 1 bedroom. no front exterior changes. all new windows to be wood-clad. add 4 new dormers.Details
1st floor: add 2 bedroom, 2 full bath, 1 playroom & laundry room. 2nd floor add 0.5 bath, remodel kitchen and 1 bath. 3rd floor: convert attic space to living space. add family room, 1 bath room, and 1 bedroom. no front exterior changes. all new windows to be wood-clad. add 4 new dormers. | $380,000 |
| Sep 3, 2015 | Completed final sign-off Jan 2017 | 917 Florida St | remove 1 story shed at rear yard, replace entry stairs at front. reconfigure storage area at 1st fl. to include 3 bedrooms, 2 baths, laundry. reconfigure 2nd fl. to include bedroom, study, 1 and half baths, greatroom, and rear deck with stairs to yard.Details
remove 1 story shed at rear yard, replace entry stairs at front. reconfigure storage area at 1st fl. to include 3 bedrooms, 2 baths, laundry. reconfigure 2nd fl. to include bedroom, study, 1 and half baths, greatroom, and rear deck with stairs to yard. | $325,000 |
| Aug 27, 2015 | Completed final sign-off Feb 2018 | 110 Mangels Av | 1st flr: add 2 bedrms, 2 baths, 1 laundry, and 1 family rm,2nd flr: remodel kitchen & bathrm & add 1 bathrm; rebuild front staircase. and replace front windows with hung wood windows.Details
1st flr: add 2 bedrms, 2 baths, 1 laundry, and 1 family rm,2nd flr: remodel kitchen & bathrm & add 1 bathrm; rebuild front staircase. and replace front windows with hung wood windows. | $110,000 |
| Jul 16, 2015 | Completed final sign-off Aug 2016 | 3658 18th St | 1/f remodel: add 2 bedrooms, 1 bath, laundry, multi purpose rm; 2/f: reconfigure plan, add bath, interior stair to 1st fl; 3/f: reconfigure plan add bath, interior stair to roof deck, add roof deck and roof hatch. demo of int. walls less than 75%.Details
1/f remodel: add 2 bedrooms, 1 bath, laundry, multi purpose rm; 2/f: reconfigure plan, add bath, interior stair to 1st fl; 3/f: reconfigure plan add bath, interior stair to roof deck, add roof deck and roof hatch. demo of int. walls less than 75%. | $430,000 |
| Jul 13, 2015 | Completed final sign-off Aug 2016 | 1 Jade Pl | 1st flr: remodel bath and add one bedroom, 2nd flr, total remodel; 3rd flr,add 1 bathroom & 1 bedroom, replace all windows in-kind,u=o.32.max per plan.Details
1st flr: remodel bath and add one bedroom, 2nd flr, total remodel; 3rd flr,add 1 bathroom & 1 bedroom, replace all windows in-kind,u=o.32.max per plan. | $60,000 |
| Jun 12, 2015 | Completed final sign-off Jun 2016 | 963 Alabama St | 1st fl - relocate garage and add 3 bedrooms, 2 baths, laundry & interior stairs to 2nd fl. 2nd fl - reconfigure plan to include (n) front rm, 1 bedrm, 1 1/2 bath, liv, dining, kitchen, (n) interior stairs to attic. 3rd fl (attic) convert to (n) family rm & bath, (n) roof deckDetails
1st fl - relocate garage and add 3 bedrooms, 2 baths, laundry & interior stairs to 2nd fl. 2nd fl - reconfigure plan to include (n) front rm, 1 bedrm, 1 1/2 bath, liv, dining, kitchen, (n) interior stairs to attic. 3rd fl (attic) convert to (n) family rm & bath, (n) roof deck | $310,000 |
| Apr 20, 2015 | Completed final sign-off Jun 2018 | 354 27th Av | foundation, frame for 1170 sf addition, new electrical service main, lighting, recepticles, applicances, cabinets, add 2-bathrooms, add 2-bedrooms, (n) roofing, (n) rear siding, drywall, (n) central heat, (n) gas lines, (n) plumbing water & waste, (n) windows and doors.Details
foundation, frame for 1170 sf addition, new electrical service main, lighting, recepticles, applicances, cabinets, add 2-bathrooms, add 2-bedrooms, (n) roofing, (n) rear siding, drywall, (n) central heat, (n) gas lines, (n) plumbing water & waste, (n) windows and doors. | $470,000 |
| Mar 4, 2015 | Completed final sign-off Apr 2016 | 939 Rutland St | unit 939: remodel kitchen, remodel 1 bath - add addition bathroomDetails
unit 939: remodel kitchen, remodel 1 bath - add addition bathroom | $25,000 |
| Feb 25, 2015 | Completed final sign-off May 2016 | 159 Belvedere St | revision to appl 2014-09-04-5442. attic: switch bedroom to front & family room to back. relocate bathroom to hallway. add 1 dormer, new rear deck at attic & at 3rd floor with 5'-0" side setbacks.Details
revision to appl 2014-09-04-5442. attic: switch bedroom to front & family room to back. relocate bathroom to hallway. add 1 dormer, new rear deck at attic & at 3rd floor with 5'-0" side setbacks. | $10,000 |
| Jan 30, 2015 | Expired or cancelled expired May 2016 | 2693 22nd St | remodel unit#s 2693 and 2695 22nd street. modify extg walls, add bathroom and laundry. remodel extg bath and kitchen. interior remodel only.Details
remodel unit#s 2693 and 2695 22nd street. modify extg walls, add bathroom and laundry. remodel extg bath and kitchen. interior remodel only. | $60,000 |
| Jan 16, 2015 | Completed final sign-off Jun 2015 | 67 Arago St | 1st floor: add 1 bedroom and 2 full bath. 2nd floor: remodel kitchen, add 1 full bath room and to enlarge the front window with wood material double hung window and to replace the side porch windows with solid wall.Details
1st floor: add 1 bedroom and 2 full bath. 2nd floor: remodel kitchen, add 1 full bath room and to enlarge the front window with wood material double hung window and to replace the side porch windows with solid wall. | $70,000 |
| Nov 25, 2014 | Completed final sign-off Jun 2016 | 232 Elsie St | horizontal extension @ rear. new stair down to new occupied floor with 2 new bedrooms, 2 new baths & new playroom.Details
horizontal extension @ rear. new stair down to new occupied floor with 2 new bedrooms, 2 new baths & new playroom. | $225,000 |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 2243 40th Av | 1st floor: add 1 bedroom, 1 family room, and 2 bathrooms. 2nd floor: add 1 bathroom. add two windows at rear.Details
1st floor: add 1 bedroom, 1 family room, and 2 bathrooms. 2nd floor: add 1 bathroom. add two windows at rear. | $50,000 |
| Nov 17, 2014 | Completed final sign-off Apr 2016 | 744 Potrero Av | 1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room.Details
1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room. | $90,000 |
| Nov 13, 2014 | Completed final sign-off Jun 2016 | 160 08th Av | 1st flr:add master bedroom #2 w/1 full bath, add staircase to 2nd flr. 2nd flr total remodel. 3rd flr total remodel, add 1 full bath. roof: add roof deck.Details
1st flr:add master bedroom #2 w/1 full bath, add staircase to 2nd flr. 2nd flr total remodel. 3rd flr total remodel, add 1 full bath. roof: add roof deck. | $190,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2015 | 930 Elizabeth St | unit 4 - remodel studio kitchen and 1 bathroom. no structural work. no change on wallsDetails
unit 4 - remodel studio kitchen and 1 bathroom. no structural work. no change on walls | $20,000 |
| Oct 30, 2014 | Completed final sign-off Oct 2015 | 27 Roscoe St | revisionn to permit 200512120106; 1st flr: change kitchen layout, convert full bath to 1/2 bath, & redesign interior staircase, 2nd flr: add 1 master bath, and 1 laundry.Details
revisionn to permit 200512120106; 1st flr: change kitchen layout, convert full bath to 1/2 bath, & redesign interior staircase, 2nd flr: add 1 master bath, and 1 laundry. | $20,000 |
| Oct 28, 2014 | Completed final sign-off Oct 2015 | 525 Kansas St | 1st floor: add one family room, laundry and one full bath. 2nd floor: remodel bathroom and kitchen. add one full bath.Details
1st floor: add one family room, laundry and one full bath. 2nd floor: remodel bathroom and kitchen. add one full bath. | $75,000 |
| Sep 16, 2014 | Completed final sign-off Oct 2015 | 121 Clipper St | relocate entry stairs from sidewalk construct (n) driveway @ east pl, 1st flr: reconfigure plan to include garage, 3 bedrms, 2 baths, laundry & (n) int.stairs to 2nd flr, 2nd flr: reconfigure plan to include 1 bedrm, study & greatroom. remove deck.Details
relocate entry stairs from sidewalk construct (n) driveway @ east pl, 1st flr: reconfigure plan to include garage, 3 bedrms, 2 baths, laundry & (n) int.stairs to 2nd flr, 2nd flr: reconfigure plan to include 1 bedrm, study & greatroom. remove deck. | $200,000 |
| Sep 11, 2014 | Completed final sign-off Dec 2014 | 2955 23rd St | redesign kitceh and master bath at 2nd and 3rd floor. ref app#201402078087Details
redesign kitceh and master bath at 2nd and 3rd floor. ref app#201402078087 | $25,000 |
| Sep 4, 2014 | Completed final sign-off May 2016 | 159 Belvedere St | remodel 1st fl:add 2 bedrooms, 1 full bath, study room and laundry. 2nd floor: total remodel 1 bedroom, 1 full and .5 bath, kitchen, living and dining room. new interior stairs to 1st floor. 3rd floor: total remodel 2 bedrooms, 2 full baths, kitchen, living and dining room, newDetails
remodel 1st fl:add 2 bedrooms, 1 full bath, study room and laundry. 2nd floor: total remodel 1 bedroom, 1 full and .5 bath, kitchen, living and dining room. new interior stairs to 1st floor. 3rd floor: total remodel 2 bedrooms, 2 full baths, kitchen, living and dining room, new | $250,000 |
| Aug 26, 2014 | Completed final sign-off Oct 2016 | 228 03rd Av | interior remodel w/ rear horiz extension, 1st fl (n) garage, media rm, 2-bedrm, bath, storage. 2nd fl: dining, kitch, storage closets, deck; 3rd fl: 4 new bedrooms, 2 baths, closets, windows, door, elect & plumb, interior stairs, foundation & mech work.Details
interior remodel w/ rear horiz extension, 1st fl (n) garage, media rm, 2-bedrm, bath, storage. 2nd fl: dining, kitch, storage closets, deck; 3rd fl: 4 new bedrooms, 2 baths, closets, windows, door, elect & plumb, interior stairs, foundation & mech work. | $420,000 |
| Aug 25, 2014 | Completed final sign-off Jun 2016 | 150 Vicksburg St | remodel 1st flr unit 150: add 1 bedroom, 1 family room, and 1 full bath, remodel 2nd flr unit #150: 1 kitchen, (1) 1/2 bath, 1 living room, 1 family room, and new internal stairs to 1st flr, remodel 3rd flr unit #152: 2 bedrooms, 2 baths, 1 living room and 1 kitchen.Details
remodel 1st flr unit 150: add 1 bedroom, 1 family room, and 1 full bath, remodel 2nd flr unit #150: 1 kitchen, (1) 1/2 bath, 1 living room, 1 family room, and new internal stairs to 1st flr, remodel 3rd flr unit #152: 2 bedrooms, 2 baths, 1 living room and 1 kitchen. | $110,000 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 930 Elizabeth St | remodel unit #2 studio kitchen and 1 bathroom. no structural work, same location for all the fixtures.Details
remodel unit #2 studio kitchen and 1 bathroom. no structural work, same location for all the fixtures. | $10,000 |
| Jul 30, 2014 | Completed final sign-off Dec 2014 | 769 Pacheco St | remodel kitchen and 1 bathroom at 2nd fl per plan. new recessed lights at kitchen area. new bedroom, entertainment room, and bathroom on 1st fl floor planDetails
remodel kitchen and 1 bathroom at 2nd fl per plan. new recessed lights at kitchen area. new bedroom, entertainment room, and bathroom on 1st fl floor plan | $15,000 |
| Jul 17, 2014 | Never finaled issued Jul 2014, no final | 1669 Alabama St | remove non-permitted partition walls, kitchen and bathroom on ground floor and convert back to original garage space. thus permanently removing from residential living space use. legality of second floor area use is not under this permit.Details
remove non-permitted partition walls, kitchen and bathroom on ground floor and convert back to original garage space. thus permanently removing from residential living space use. legality of second floor area use is not under this permit. | $5,000 |
| Jul 14, 2014 | Completed final sign-off Nov 2014 | 972 Greenwich St | remodel kitchen and 2.5 baths. no change to walls.Details
remodel kitchen and 2.5 baths. no change to walls. | $25,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2016 | 150 Vicksburg St | unit#150 - 1 kitchen & 1 bathroom remodel. unit#152 - 1 kitchen & 1 bathroom remodel.Details
unit#150 - 1 kitchen & 1 bathroom remodel. unit#152 - 1 kitchen & 1 bathroom remodel. | $50,000 |
| Jun 12, 2014 | Completed final sign-off Mar 2015 | 853 Peralta Av | work at basement & 1/f: basement- add 1 family room, 1 full bath & 1 media room. 1/f- convert play/bedroom to master bedroom, rearrange bath/laundry location, new stairs to basement. 2/f- remove wall at kitchen, rev. to pa#201405196104. n/a ordinance #155-13Details
work at basement & 1/f: basement- add 1 family room, 1 full bath & 1 media room. 1/f- convert play/bedroom to master bedroom, rearrange bath/laundry location, new stairs to basement. 2/f- remove wall at kitchen, rev. to pa#201405196104. n/a ordinance #155-13 | $80,000 |
| May 21, 2014 | Completed final sign-off Jun 2021 | 357 Franconia St | 1st floor:add one full bath and 1 bedroom. 2nd floor: remodel 2 bedrooms and living and dining. remodel bathroom.Details
1st floor:add one full bath and 1 bedroom. 2nd floor: remodel 2 bedrooms and living and dining. remodel bathroom. | $40,000 |
| May 19, 2014 | Never finaled issued May 2014, no final | 853 Peralta Av | two (2) bathrooms, (1) kitchen remodel. no walls moved, removed or added. all fixture locatons and layout to remain unchanged.Details
two (2) bathrooms, (1) kitchen remodel. no walls moved, removed or added. all fixture locatons and layout to remain unchanged. | $25,000 |
| Apr 17, 2014 | Completed final sign-off Feb 2015 | 101 Peabody St | 1st first floor - add (3) full baths, (1) 1/2 bath, & (2) bedrooms.Details
1st first floor - add (3) full baths, (1) 1/2 bath, & (2) bedrooms. | $100,000 |
| Mar 25, 2014 | Completed final sign-off Apr 2015 | 671 Orizaba Av | 1st fl add 2 baths and 1/2 bath, 2 bedrooms, family rm. 2nd fl add 2 baths and add deck and stairs at rear. replace all windows u.40 max. typical front windows wood clad in kindDetails
1st fl add 2 baths and 1/2 bath, 2 bedrooms, family rm. 2nd fl add 2 baths and add deck and stairs at rear. replace all windows u.40 max. typical front windows wood clad in kind | $35,000 |
| Mar 14, 2014 | Never finaled issued Mar 2014, no final | 671 Orizaba Av | remodel kitchen and bath. no new lighting work under this permit.Details
remodel kitchen and bath. no new lighting work under this permit. | $20,000 |
| Mar 11, 2014 | Completed final sign-off Jun 2021 | 357 Franconia St | 2nd floor:remodel kitchen and bath.Details
2nd floor:remodel kitchen and bath. | $20,000 |
| Feb 26, 2014 | Never finaled issued Feb 2014, no final | 3009 Baker St | #2- remodel bathrooms (2), replacing fixtures and new tile work and cabinets.Details
#2- remodel bathrooms (2), replacing fixtures and new tile work and cabinets. | $15,000 |
| Feb 25, 2014 | Completed final sign-off Dec 2015 | 6423 California St | 1/f- (n)steel moment frames & grade beams in (e) commercial space; demolish (e) stair & deck in rear yard; 2/f - add 1 (n) bath rm, remodel kitchen, bathrms, bedrooms & living rm.Details
1/f- (n)steel moment frames & grade beams in (e) commercial space; demolish (e) stair & deck in rear yard; 2/f - add 1 (n) bath rm, remodel kitchen, bathrms, bedrooms & living rm. | $90,000 |
| Feb 13, 2014 | Completed final sign-off Sep 2014 | 778 35th Av | remodel 1st floor:add 1 full bath, 2 bedrooms and 1 family room. remodel 2nd floor: kitchen, 1/2 bath, living dining and office. remodel 3rd floor: 1 bath, add 2 full baths, 3 bedrooms. remove all extg plaster and laths, replace with 5/8 type x gyp bd throughout ceiling/walls.Details
remodel 1st floor:add 1 full bath, 2 bedrooms and 1 family room. remodel 2nd floor: kitchen, 1/2 bath, living dining and office. remodel 3rd floor: 1 bath, add 2 full baths, 3 bedrooms. remove all extg plaster and laths, replace with 5/8 type x gyp bd throughout ceiling/walls. | $60,000 |
| Feb 7, 2014 | Completed final sign-off Dec 2014 | 2955 23rd St | 1/f: lower floor by 1'0", add bedroom, full bath & family room. 2/f & 3/f: add 1.5 baths, remodel kitchen, bath & all rooms. remove all plaster/bath, new 5/8" type 'x' gyp. bd., replace windows, front wood type.Details
1/f: lower floor by 1'0", add bedroom, full bath & family room. 2/f & 3/f: add 1.5 baths, remodel kitchen, bath & all rooms. remove all plaster/bath, new 5/8" type 'x' gyp. bd., replace windows, front wood type. | $250,000 |
| Feb 5, 2014 | Completed final sign-off Oct 2014 | 666 Castro St | remodel and reconfiguration of existing kitchen, reconfigure existing bedrooms, remodel existing bath, add master bath at 3rd flDetails
remodel and reconfiguration of existing kitchen, reconfigure existing bedrooms, remodel existing bath, add master bath at 3rd fl | $75,000 |
| Dec 18, 2013 | Completed final sign-off Sep 2015 | 457 Waller St | remodel entire interior 3 unit bldg: remove all plaster & laths & replace w/5/8" type "x" gyp bd. replace all windows w/vinyl type except front shall be wood clad in kind. each unit 2 bedrooms, 2 full baths, & relocate kitchen. replace rear ext stairs in-kind.Details
remodel entire interior 3 unit bldg: remove all plaster & laths & replace w/5/8" type "x" gyp bd. replace all windows w/vinyl type except front shall be wood clad in kind. each unit 2 bedrooms, 2 full baths, & relocate kitchen. replace rear ext stairs in-kind. | $250,000 |
| Nov 13, 2013 | Completed final sign-off Dec 2014 | 607 07th Av | 1/f: add 1 master bedroom, 1 full bath, & 1 family room. 2/f: remodel kitchen, 1/2 bth, & add stairs leading to 1st floor. 3/f: remodel bath, add master bath #2, & convert 2 rear bedrooms to master bedroom #2. attic fl: convert attic space to master bedroom & bathroom, add nw skylight,Details
1/f: add 1 master bedroom, 1 full bath, & 1 family room. 2/f: remodel kitchen, 1/2 bth, & add stairs leading to 1st floor. 3/f: remodel bath, add master bath #2, & convert 2 rear bedrooms to master bedroom #2. attic fl: convert attic space to master bedroom & bathroom, add nw skylight, | $250,000 |
| Oct 28, 2013 | Completed final sign-off Dec 2015 | 330 21st Av | 1st fl-lower floor 1'-9", add 1 bedroom, 1 full bathroom, laundry & family room. 2nd fl-remodel kitchen, add half bathroom, add stairs to 1st fl, re-build rear deck. 3rd fl-remodel bathroom, add master bathroom, relocate bedroom closetsDetails
1st fl-lower floor 1'-9", add 1 bedroom, 1 full bathroom, laundry & family room. 2nd fl-remodel kitchen, add half bathroom, add stairs to 1st fl, re-build rear deck. 3rd fl-remodel bathroom, add master bathroom, relocate bedroom closets | $120,000 |
| Oct 18, 2013 | Completed final sign-off Oct 2014 | 2127 34th Av | 1/f- remove non-permitted one story extension and infill overhand space, add 1 bedroom, 1 bath, 1 family room and 1 storage. 2/f- covert 1 bath to 2 baths and dining to bedroom.Details
1/f- remove non-permitted one story extension and infill overhand space, add 1 bedroom, 1 bath, 1 family room and 1 storage. 2/f- covert 1 bath to 2 baths and dining to bedroom. | $65,000 |
| Oct 10, 2013 | Completed final sign-off Apr 2014 | 695 27th Av | 1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind.Details
1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind. | $80,000 |
| Oct 8, 2013 | Expired or cancelled expired Oct 2017 | 151 16th Av | new family room, bedroom, and bathroom at ground floor. remodel kitchen and half bathroom at 2n floor. remodel 2 bathroom and bedrooms at 3rd floor.Details
new family room, bedroom, and bathroom at ground floor. remodel kitchen and half bathroom at 2n floor. remodel 2 bathroom and bedrooms at 3rd floor. | $85,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 2371 27th Av | 1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite.Details
1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite. | $50,000 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 572 Ramsell St | add 1 bedroom, 1 family room, 1 full bathroom, 1 half bath, 2 storages & 1 laundry room to (e) ground floor. new foundation, new shear walls on ground floor, framing alteration.Details
add 1 bedroom, 1 family room, 1 full bathroom, 1 half bath, 2 storages & 1 laundry room to (e) ground floor. new foundation, new shear walls on ground floor, framing alteration. | $50,000 |
| Aug 28, 2013 | Never finaled issued Aug 2013, no final | 1365 06th Av | rev. to pa#201307101458- 1/f: clearify bath #1. 2/f: remodel kitchen & bath. 3/f: add full bath, remodel bath & convert 2 bedroom to 1 bedroom.Details
rev. to pa#201307101458- 1/f: clearify bath #1. 2/f: remodel kitchen & bath. 3/f: add full bath, remodel bath & convert 2 bedroom to 1 bedroom. | $18,000 |
| Aug 8, 2013 | Completed final sign-off Feb 2015 | 2831 Bryant St | remodel 1st fl. add 2 bedrooms, full bath, storage room. 2nd fl remodel kitchen, dining, living rm, add 1/2 bath, rear deck and stairs to yard, add interior stairs to 1st fl. 3rd fl remodel 2 bedroom, bath and full bath; work will comply with nov 201032748Details
remodel 1st fl. add 2 bedrooms, full bath, storage room. 2nd fl remodel kitchen, dining, living rm, add 1/2 bath, rear deck and stairs to yard, add interior stairs to 1st fl. 3rd fl remodel 2 bedroom, bath and full bath; work will comply with nov 201032748 | $130,000 |
| Aug 7, 2013 | Completed final sign-off Feb 2014 | 391 Girard St | revision to app#201303071739. rearrange layout. 1st floor:add 2 bedroom, bath, and storage. 2nd floor: add bath, remodel kitchen, bath, 2 bedroom, and dining room.Details
revision to app#201303071739. rearrange layout. 1st floor:add 2 bedroom, bath, and storage. 2nd floor: add bath, remodel kitchen, bath, 2 bedroom, and dining room. | |
| Jul 24, 2013 | Completed final sign-off Aug 2014 | 747 Anderson St | add 2 bedrooms, laundry area and one bathroom on ground floor, interior remodeling as per plan on 2/f, relocate (e) stairway connect to 3/f. new stairway connect 1st to 3rd floor, new deck and stairway at rear side of building.Details
add 2 bedrooms, laundry area and one bathroom on ground floor, interior remodeling as per plan on 2/f, relocate (e) stairway connect to 3/f. new stairway connect 1st to 3rd floor, new deck and stairway at rear side of building. | $48,000 |
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 1365 06th Av | legalize existing 1/f as 2 bedrooms, 2 bathrooms and a storage.Details
legalize existing 1/f as 2 bedrooms, 2 bathrooms and a storage. | $35,000 |
| Jul 8, 2013 | Completed final sign-off Oct 2013 | 36 Pasadena St | remodel 1st floor:add full bath, laundry room & home office. remodel 2nd floor:remodel kitchen and bath.Details
remodel 1st floor:add full bath, laundry room & home office. remodel 2nd floor:remodel kitchen and bath. | $32,000 |
| Jun 10, 2013 | Completed final sign-off Sep 2013 | 12 Sumner St | ground floor: add half bath & storage room. install furnace & associated ductwork. install lighting, switches & receptacles.Details
ground floor: add half bath & storage room. install furnace & associated ductwork. install lighting, switches & receptacles. | $10,000 |