Back to kitchen remodel contractors
Hines Custom Remodeling
- Based in
- Millvalley
- On San Francisco permits
- Jan 2002 to Mar 2024
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2016 | Completed final sign-off Sep 2017 | 2110 Pine St | to comply with nov #201622252. kitchen remodel: new cabinets, countertops, flooring and appliances, moving 1 wall and shortening 2 other wall to open space. installing psl boards to support.Details
to comply with nov #201622252. kitchen remodel: new cabinets, countertops, flooring and appliances, moving 1 wall and shortening 2 other wall to open space. installing psl boards to support. | $25,000 |
| Feb 18, 2016 | Expired or cancelled withdrawn Mar 2016 | 2110 Pine St | complete remodel of 2 bathrooms,new fixtures, surfaces & electrical, minor remodel of kitchen- new cabinets & counter tops, new sink & faucet, keep appliances & electrical.Details
complete remodel of 2 bathrooms,new fixtures, surfaces & electrical, minor remodel of kitchen- new cabinets & counter tops, new sink & faucet, keep appliances & electrical. | $70,000 |
| Dec 3, 2008 | Completed final sign-off Aug 2009 | 34 Douglass St | remodel of 2 extg apartments. fill in small light shaft on internal part of bldg. remodel 2 extg baths and one kitchen. add cabinetry and new flooringDetails
remodel of 2 extg apartments. fill in small light shaft on internal part of bldg. remodel 2 extg baths and one kitchen. add cabinetry and new flooring | $180,000 |
| Nov 6, 2006 | Completed final sign-off Feb 2009 | 515 Hill St | three story rear yard addition w/one story roof deck extension; remodel interior garage level, kitchen and 3rd floor bedrooms. new balcony and stair down from 3rd floor.Details
three story rear yard addition w/one story roof deck extension; remodel interior garage level, kitchen and 3rd floor bedrooms. new balcony and stair down from 3rd floor. | $110,000 |
| Aug 18, 2006 | Completed final sign-off Mar 2007 | 66 Douglass St | tic remodel of existing kitchen & bathroom. creation of powder room in existing space. move some walls & create 6' wide doorway between r00ms. new fixtures, plumbing 2 lighting. tic all work inside unit.Details
tic remodel of existing kitchen & bathroom. creation of powder room in existing space. move some walls & create 6' wide doorway between r00ms. new fixtures, plumbing 2 lighting. tic all work inside unit. | $74,500 |
| Aug 17, 2006 | Completed final sign-off Mar 2007 | 1362 Masonic Av | remodel of (e) kitchen and bathroom, some wall changes, new fixtures, surfaces & lighting. repair of (e) exterior deck & separation of kitchen & laundry. deck repairt less than 50%.Details
remodel of (e) kitchen and bathroom, some wall changes, new fixtures, surfaces & lighting. repair of (e) exterior deck & separation of kitchen & laundry. deck repairt less than 50%. | $79,100 |
| Feb 28, 2006 | Completed final sign-off May 2006 | 326 Valley St | interior kitchen cabinet replacement, including new flooring, and countertops. reuse existing appliances except new hood. minor framing to move door opening off of hallway. minor elec work to provide code req'd outlets. add water cabinet flourescent lighting on separate switch install new sink &Details
interior kitchen cabinet replacement, including new flooring, and countertops. reuse existing appliances except new hood. minor framing to move door opening off of hallway. minor elec work to provide code req'd outlets. add water cabinet flourescent lighting on separate switch install new sink & | $50,000 |
| Mar 17, 2005 | Completed final sign-off May 2006 | 1950 Gough St | complete kitchen romodel, gutting of (e) kitchen, new floor, appliances, conter-tops, cabinets,Details
complete kitchen romodel, gutting of (e) kitchen, new floor, appliances, conter-tops, cabinets, | $60,000 |