Back to bathroom remodel contractors
Hines Custom Remodeling
- Based in
- Millvalley
- On San Francisco permits
- Jan 2002 to Mar 2024
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2024 | In progress issued Apr 2024 | 1369 04th Av | remodel an existing bathroom on 3rd floor. remove all fixtures and install new. convert closet into laundry on 3rd floor. add plumbing and electrical. infill window opening at bathroom.Details
remodel an existing bathroom on 3rd floor. remove all fixtures and install new. convert closet into laundry on 3rd floor. add plumbing and electrical. infill window opening at bathroom. | $25,000 |
| Mar 15, 2023 | Completed final sign-off Aug 2023 | 123 Lake St | remodel (e) bathroom with sauna. remove sauna and use (e) space to create 2 fixture powder room. remove all (e) fixtures and replace with new, connect new plumbing for powder room to (e) bath. new surfaces throughout, new lighting, new bath exhaust fan, new gfci outlets.Details
remodel (e) bathroom with sauna. remove sauna and use (e) space to create 2 fixture powder room. remove all (e) fixtures and replace with new, connect new plumbing for powder room to (e) bath. new surfaces throughout, new lighting, new bath exhaust fan, new gfci outlets. | $32,000 |
| Aug 10, 2016 | Completed final sign-off Sep 2017 | 2110 Pine St | remodel 2 existing bathrooms in same space.new plumbing fixtures,wall surface tile, flooring, & electrical fixtures, 2110"b" onlyDetails
remodel 2 existing bathrooms in same space.new plumbing fixtures,wall surface tile, flooring, & electrical fixtures, 2110"b" only | $25,000 |
| Feb 18, 2016 | Expired or cancelled withdrawn Mar 2016 | 2110 Pine St | complete remodel of 2 bathrooms,new fixtures, surfaces & electrical, minor remodel of kitchen- new cabinets & counter tops, new sink & faucet, keep appliances & electrical.Details
complete remodel of 2 bathrooms,new fixtures, surfaces & electrical, minor remodel of kitchen- new cabinets & counter tops, new sink & faucet, keep appliances & electrical. | $70,000 |
| Nov 2, 2010 | Completed final sign-off Jan 2012 | 1258 02nd Av | remodel powder room and bathroom on the 2nd fl. remove (e) surfaces and fixtures and replace w/ new, add 3 light fixtures and fan. switch orientaton of bathtub. replace existing window with smaller size window at bathroom. no wall relocation.Details
remodel powder room and bathroom on the 2nd fl. remove (e) surfaces and fixtures and replace w/ new, add 3 light fixtures and fan. switch orientaton of bathtub. replace existing window with smaller size window at bathroom. no wall relocation. | $16,800 |
| Aug 3, 2010 | Completed final sign-off Apr 2011 | 1141 Fell St | renovate (e) bathroom, add (n) stair to ground floor, (n) finishes and walls at ground floor, (n) clear span structure in garage, (n) door to back yard.Details
renovate (e) bathroom, add (n) stair to ground floor, (n) finishes and walls at ground floor, (n) clear span structure in garage, (n) door to back yard. | $90,000 |
| Dec 3, 2008 | Completed final sign-off Aug 2009 | 34 Douglass St | remodel of 2 extg apartments. fill in small light shaft on internal part of bldg. remodel 2 extg baths and one kitchen. add cabinetry and new flooringDetails
remodel of 2 extg apartments. fill in small light shaft on internal part of bldg. remodel 2 extg baths and one kitchen. add cabinetry and new flooring | $180,000 |
| Jul 27, 2007 | Completed final sign-off Sep 2008 | 251 Surrey St | interior remodel of unconditioned basement; adding new 1 bedroom, 1 full bath and laundry/mud room; refernce pa#200606023124. replace an extg beamDetails
interior remodel of unconditioned basement; adding new 1 bedroom, 1 full bath and laundry/mud room; refernce pa#200606023124. replace an extg beam | $35,000 |
| Aug 18, 2006 | Completed final sign-off Mar 2007 | 66 Douglass St | tic remodel of existing kitchen & bathroom. creation of powder room in existing space. move some walls & create 6' wide doorway between r00ms. new fixtures, plumbing 2 lighting. tic all work inside unit.Details
tic remodel of existing kitchen & bathroom. creation of powder room in existing space. move some walls & create 6' wide doorway between r00ms. new fixtures, plumbing 2 lighting. tic all work inside unit. | $74,500 |
| Aug 17, 2006 | Completed final sign-off Mar 2007 | 1362 Masonic Av | remodel of (e) kitchen and bathroom, some wall changes, new fixtures, surfaces & lighting. repair of (e) exterior deck & separation of kitchen & laundry. deck repairt less than 50%.Details
remodel of (e) kitchen and bathroom, some wall changes, new fixtures, surfaces & lighting. repair of (e) exterior deck & separation of kitchen & laundry. deck repairt less than 50%. | $79,100 |
| Oct 14, 2005 | Expired or cancelled expired May 2008 | 267 Surrey St | conversion of ex. basement plus 3.5' addition into family room, storage and 1/2 bath with internal stairs. new deck.Details
conversion of ex. basement plus 3.5' addition into family room, storage and 1/2 bath with internal stairs. new deck. | $50,000 |