Back to kitchen remodel contractors
Hennessy Construciton
- Based in
- San Frnacisco
- On San Francisco permits
- Oct 2002 to Apr 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 37 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2019 | Completed final sign-off Sep 2019 | 125 Miraloma Dr | kitchen remodel from studs, new electrical and plumbing insulation and sheetrock. no structual work.Details
kitchen remodel from studs, new electrical and plumbing insulation and sheetrock. no structual work. | $20,000 |
| Jun 12, 2015 | Completed final sign-off Nov 2017 | 642 Mississippi St | interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room.Details
interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room. | $75,000 |
| Apr 2, 2013 | Completed final sign-off Oct 2013 | 2153 Beach St | remodel 3 bathrooms replace tile in kitchen floor with hardwood flooring. enlarge extg opening to from an arch from kitchen to dining room.Details
remodel 3 bathrooms replace tile in kitchen floor with hardwood flooring. enlarge extg opening to from an arch from kitchen to dining room. | $62,000 |
| Mar 28, 2012 | Completed final sign-off Jul 2013 | 1650 Lake St | 1st fl: replace e concrete footings & slab on grade, eliminate powder rm,add bath, remodel stair, laundry, storage rooms, add playroom and game room. 2nd fl: remdel kitchen, powder and stair. 3rd fl: remodel bedrooms,baths, mster bath, add playroom and laundry. 4th fl: remodel stair and new dormerDetails
1st fl: replace e concrete footings & slab on grade, eliminate powder rm,add bath, remodel stair, laundry, storage rooms, add playroom and game room. 2nd fl: remdel kitchen, powder and stair. 3rd fl: remodel bedrooms,baths, mster bath, add playroom and laundry. 4th fl: remodel stair and new dormer | $235,000 |
| Feb 9, 2012 | Completed final sign-off May 2012 | 62 Avila St | 12 sq ft enclosure and remodel of kitchen and bathroom.Details
12 sq ft enclosure and remodel of kitchen and bathroom. | $31,000 |
| Dec 14, 2011 | Completed final sign-off Dec 2011 | 2956 Bush St | remove old counter top, replace with new, reface kitchen cabinets.Details
remove old counter top, replace with new, reface kitchen cabinets. | $25,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 1267 40th Av | 2nd/main level: remodel kitchen. garage/lower level: add new full bathroom and hallway. no work to (e) storage rooms on lower level.Details
2nd/main level: remodel kitchen. garage/lower level: add new full bathroom and hallway. no work to (e) storage rooms on lower level. | $19,800 |
| May 14, 2008 | Completed final sign-off Oct 2008 | 446 Funston Av | alteration of an existing kitchen. new cabinets, countertop,electrical,plumbing and finishesDetails
alteration of an existing kitchen. new cabinets, countertop,electrical,plumbing and finishes | $14,800 |
| Jan 19, 2007 | Completed final sign-off Mar 2007 | 563 Liberty St | install kitchen cabinets with new electrical + plumbing to code. no structural. wattage of kitchen lighting to be 50% flourescant if new.Details
install kitchen cabinets with new electrical + plumbing to code. no structural. wattage of kitchen lighting to be 50% flourescant if new. | $7,100 |
| Oct 18, 2006 | Completed final sign-off Nov 2007 | 1882 23rd Av | remove sheetrock from upper level. new plumbing, mech. and upgrade electrical. new kitchen and bathroom up. insulate + rock. add new bedroom and guest bathroom downstairs with added storage and laundry room.Details
remove sheetrock from upper level. new plumbing, mech. and upgrade electrical. new kitchen and bathroom up. insulate + rock. add new bedroom and guest bathroom downstairs with added storage and laundry room. | $175,000 |
| May 26, 2004 | Completed final sign-off Sep 2004 | 3085 Turk Bl | kitchen remodel nonstructural move stove gal line 10sf across kitchen floor, duct work for range **Details
kitchen remodel nonstructural move stove gal line 10sf across kitchen floor, duct work for range ** | $9,000 |