Back to bathroom remodel contractors
Hennessy Construciton
- Based in
- San Frnacisco
- On San Francisco permits
- Oct 2002 to Apr 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 37 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 never finaled. Typically 30 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2018 | Completed final sign-off Sep 2018 | 1455 05th Av | demo a bathroom to studs. rewifre, replumb for new shower stall toilet and vanity, insulate and sheetrock. bring rest of area to code electrically. insulate and sheetrock. create area for new heating furnaceDetails
demo a bathroom to studs. rewifre, replumb for new shower stall toilet and vanity, insulate and sheetrock. bring rest of area to code electrically. insulate and sheetrock. create area for new heating furnace | $37,000 |
| Nov 12, 2015 | Completed final sign-off Jul 2021 | 1472 06th Av | vertical addition. add new 4th floor at rear of dwelling for use as study & half bath. add new master bathroom & dressing room at (e) 3rd floor. add sky lights. add sprinklers & seismic upgrade.Details
vertical addition. add new 4th floor at rear of dwelling for use as study & half bath. add new master bathroom & dressing room at (e) 3rd floor. add sky lights. add sprinklers & seismic upgrade. | $120,000 |
| Jun 12, 2015 | Completed final sign-off Nov 2017 | 642 Mississippi St | interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room.Details
interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room. | $75,000 |
| Sep 18, 2014 | Never finaled issued Jun 2016, no final | 1630 43rd Av | proposed rebuild existing stairs from 2/f to g/f, install bedroom, bathroom and family room at ground floor.Details
proposed rebuild existing stairs from 2/f to g/f, install bedroom, bathroom and family room at ground floor. | $25,000 |
| Aug 25, 2014 | Completed final sign-off Apr 2015 | 1515 33rd Av | remodel two bathrooms with new sink on 2nd floor.Details
remodel two bathrooms with new sink on 2nd floor. | $25,000 |
| Apr 2, 2013 | Completed final sign-off Oct 2013 | 2153 Beach St | remodel 3 bathrooms replace tile in kitchen floor with hardwood flooring. enlarge extg opening to from an arch from kitchen to dining room.Details
remodel 3 bathrooms replace tile in kitchen floor with hardwood flooring. enlarge extg opening to from an arch from kitchen to dining room. | $62,000 |
| Apr 20, 2012 | Completed final sign-off Apr 2014 | 1650 Lake St | 3-story addition at rear of (e) 3-story single family residence to create (n) family room & entry at 1st fl. (n) great room & pantry at 2nd fl & 2 bedrooms & 1 shared bath at 3rd fl. exterior stair from 2nd fl to grade .(n) roof deck @ (e) garage.remodel master bath & shared bath @3rd floor.remodelDetails
3-story addition at rear of (e) 3-story single family residence to create (n) family room & entry at 1st fl. (n) great room & pantry at 2nd fl & 2 bedrooms & 1 shared bath at 3rd fl. exterior stair from 2nd fl to grade .(n) roof deck @ (e) garage.remodel master bath & shared bath @3rd floor.remodel | $208,000 |
| Mar 28, 2012 | Completed final sign-off Jul 2013 | 1650 Lake St | 1st fl: replace e concrete footings & slab on grade, eliminate powder rm,add bath, remodel stair, laundry, storage rooms, add playroom and game room. 2nd fl: remdel kitchen, powder and stair. 3rd fl: remodel bedrooms,baths, mster bath, add playroom and laundry. 4th fl: remodel stair and new dormerDetails
1st fl: replace e concrete footings & slab on grade, eliminate powder rm,add bath, remodel stair, laundry, storage rooms, add playroom and game room. 2nd fl: remdel kitchen, powder and stair. 3rd fl: remodel bedrooms,baths, mster bath, add playroom and laundry. 4th fl: remodel stair and new dormer | $235,000 |
| Feb 9, 2012 | Completed final sign-off May 2012 | 62 Avila St | 12 sq ft enclosure and remodel of kitchen and bathroom.Details
12 sq ft enclosure and remodel of kitchen and bathroom. | $31,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 1267 40th Av | 2nd/main level: remodel kitchen. garage/lower level: add new full bathroom and hallway. no work to (e) storage rooms on lower level.Details
2nd/main level: remodel kitchen. garage/lower level: add new full bathroom and hallway. no work to (e) storage rooms on lower level. | $19,800 |
| Aug 10, 2009 | Completed final sign-off Oct 2009 | 2956 Bush St | remodel bathroom remove sheetrock, remove tub and reframe window for smaller window. install shower. new sheetrock, lighting & tile. not visible from street and is 90' from property line.Details
remodel bathroom remove sheetrock, remove tub and reframe window for smaller window. install shower. new sheetrock, lighting & tile. not visible from street and is 90' from property line. | $13,500 |
| Oct 18, 2006 | Completed final sign-off Nov 2007 | 1882 23rd Av | remove sheetrock from upper level. new plumbing, mech. and upgrade electrical. new kitchen and bathroom up. insulate + rock. add new bedroom and guest bathroom downstairs with added storage and laundry room.Details
remove sheetrock from upper level. new plumbing, mech. and upgrade electrical. new kitchen and bathroom up. insulate + rock. add new bedroom and guest bathroom downstairs with added storage and laundry room. | $175,000 |
| Dec 23, 2003 | Completed final sign-off Apr 2004 | 267 Eureka St | bathroom remodel on 2nd floorDetails
bathroom remodel on 2nd floor | $18,900 |
| Mar 18, 2003 | Never finaled issued Mar 2003, no final | 1630 43rd Av | dry rot in shower area of bathroom. replace existing bathrm fixtures & repair dry rot. replace old wDetails
dry rot in shower area of bathroom. replace existing bathrm fixtures & repair dry rot. replace old w | $17,000 |