Back to kitchen remodel contractors
Hemphill Const Co Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2017
- Last 24 months
- 0 permits filed
48 permits since 2000: 34 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2016 | Completed final sign-off Nov 2016 | 368 Connecticut St | job is to upgrade existing kitchen with new cabinets and appliances. need to re-attach the electrical and plumbing. no structural work to be done.Details
job is to upgrade existing kitchen with new cabinets and appliances. need to re-attach the electrical and plumbing. no structural work to be done. | $15,000 |
| Mar 28, 2016 | Completed final sign-off Jul 2016 | 2040 Sutter St | (1) kitchen remodel: update cabinets, appliances in (e) unit with appliances going back in same place; add outlets as needed per code.Details
(1) kitchen remodel: update cabinets, appliances in (e) unit with appliances going back in same place; add outlets as needed per code. | $6,000 |
| Jun 3, 2014 | Completed final sign-off Sep 2014 | 932 Sanchez St | remove & replace kitchen cabinets, countertops & appliances - all to go back to (e) location. new lighting will be added necessitating removal of some sheetrock.Details
remove & replace kitchen cabinets, countertops & appliances - all to go back to (e) location. new lighting will be added necessitating removal of some sheetrock. | $50,000 |
| May 30, 2014 | Never finaled issued Jun 2014, no final | 919 Cortland Av | change from a pizza restaurant to a fam style dinner restaurant. renovate including (n) plbg, (n) electrical, (n) lighting, (n) kitchen w/new finishes. (n) flooring, (n) gyp bd, ceiling walls, (n) painting. (n) hood & (n) ventilation under separate permit.Details
change from a pizza restaurant to a fam style dinner restaurant. renovate including (n) plbg, (n) electrical, (n) lighting, (n) kitchen w/new finishes. (n) flooring, (n) gyp bd, ceiling walls, (n) painting. (n) hood & (n) ventilation under separate permit. | $150,000 |
| Sep 14, 2010 | Completed final sign-off Jan 2011 | 1491 05th Av | remove existing tile from rear deck & add new waterproof membrane, retile existing deck. replace kitchen windows at the deck level. add deck drains if necessary. replace terrazzo steps that are cracked and create a tripping hazard.Details
remove existing tile from rear deck & add new waterproof membrane, retile existing deck. replace kitchen windows at the deck level. add deck drains if necessary. replace terrazzo steps that are cracked and create a tripping hazard. | $35,000 |
| Jun 11, 2009 | Completed final sign-off Aug 2009 | 320 17th Av | retrofit basement walls with 5/8 threader rod, in epoxy, set 10" into concrete & top square lashers. add a 35 cups to the top plate & then cover with strve 1 plywood. 4 add knee bracing center wall between posts & add shelving to (e) bookcases on either side of the fire place. add ply in kitchenDetails
retrofit basement walls with 5/8 threader rod, in epoxy, set 10" into concrete & top square lashers. add a 35 cups to the top plate & then cover with strve 1 plywood. 4 add knee bracing center wall between posts & add shelving to (e) bookcases on either side of the fire place. add ply in kitchen | $20,000 |
| Dec 1, 2006 | Completed final sign-off Jan 2007 | 2016 Balboa St | remodel of 2 kitchens & 2 baths as well as 2 laundry hookups. verify (e) window units in bedrooms & guestrooms comply with emergency escape light vent requirements. battery smoke alarms in all rooms & guestrooms. non structural work.Details
remodel of 2 kitchens & 2 baths as well as 2 laundry hookups. verify (e) window units in bedrooms & guestrooms comply with emergency escape light vent requirements. battery smoke alarms in all rooms & guestrooms. non structural work. | $28,000 |
| Feb 23, 2006 | Completed final sign-off Apr 2006 | 1436 Cole St | remove nine feet of wall between the family room and kitchen and instal a 5 1/4x 11 7/8 parllam i its place add a4x6 or #2 of at each end of the parallm for support add straps per planDetails
remove nine feet of wall between the family room and kitchen and instal a 5 1/4x 11 7/8 parllam i its place add a4x6 or #2 of at each end of the parallm for support add straps per plan | $6,000 |
| May 9, 2000 | Completed final sign-off Dec 2000 | 1100 Montgomery St | remodel existing 5 kitchens,5 baths incl new copper pipes & elec, repair dryrot at back stairsDetails
remodel existing 5 kitchens,5 baths incl new copper pipes & elec, repair dryrot at back stairs | $125,000 |