Back to bathroom remodel contractors
Hemphill Const Co Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2017
- Last 24 months
- 0 permits filed
48 permits since 2000: 34 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 1 Belmont Av | remodel one bathroom, remove (e) tub, vanity, toilet and mirror, replace all fixtures in (e) location. no structural work & no wall modification.Details
remodel one bathroom, remove (e) tub, vanity, toilet and mirror, replace all fixtures in (e) location. no structural work & no wall modification. | $15,000 |
| Aug 28, 2014 | Expired or cancelled expired Dec 2025 | 919 Cortland Av | revision to pa#201405307147, change in plan layout, remove non-ada bath.Details
revision to pa#201405307147, change in plan layout, remove non-ada bath. | |
| Jul 26, 2010 | Completed final sign-off Mar 2011 | 1407 Cole St | the job is to remodel 2 bathrooms, one at a time, the master will be stripped and is to get new tile for the floor and shower. we will also add a new vanity, sinks and toilet, once this job is done we will do the hal bath where we will install a new tub vanity, sink and toilet, a new tile floor willDetails
the job is to remodel 2 bathrooms, one at a time, the master will be stripped and is to get new tile for the floor and shower. we will also add a new vanity, sinks and toilet, once this job is done we will do the hal bath where we will install a new tub vanity, sink and toilet, a new tile floor will | $30,000 |
| Mar 2, 2010 | Completed final sign-off May 2010 | 55 Coleridge St | the job is to remove the extg cabinets and countertop in the kchn and replace them with new. owner will supply new appliances. extg hardwood floors to remain. the adjacent bath shall recieve new fixtures. toilet, pedestal sink and pre fab shower. both areas will recieve new paint on the wlls & ceilgDetails
the job is to remove the extg cabinets and countertop in the kchn and replace them with new. owner will supply new appliances. extg hardwood floors to remain. the adjacent bath shall recieve new fixtures. toilet, pedestal sink and pre fab shower. both areas will recieve new paint on the wlls & ceilg | $25,000 |
| Jul 24, 2009 | Never finaled issued Jul 2009, no final | 478 37th Av | convert (e) storage area into a family room. add wet bar. remodel basement bathroom. al work on basement level.Details
convert (e) storage area into a family room. add wet bar. remodel basement bathroom. al work on basement level. | $90,000 |
| Mar 2, 2009 | Completed final sign-off Apr 2009 | 1372 Masonic Av | surface refinish floors on first floor and bedroom floors on second floor. paint misc. finishing work & partial remodel 1 bathroom on 1st & 2nd floor. change out 3 toilet and one sink and tile the floor in the master bath. add a sub panel on the second floor level in place of the existing fuse box.Details
surface refinish floors on first floor and bedroom floors on second floor. paint misc. finishing work & partial remodel 1 bathroom on 1st & 2nd floor. change out 3 toilet and one sink and tile the floor in the master bath. add a sub panel on the second floor level in place of the existing fuse box. | $25,000 |
| Dec 1, 2006 | Completed final sign-off Jan 2007 | 2016 Balboa St | remodel of 2 kitchens & 2 baths as well as 2 laundry hookups. verify (e) window units in bedrooms & guestrooms comply with emergency escape light vent requirements. battery smoke alarms in all rooms & guestrooms. non structural work.Details
remodel of 2 kitchens & 2 baths as well as 2 laundry hookups. verify (e) window units in bedrooms & guestrooms comply with emergency escape light vent requirements. battery smoke alarms in all rooms & guestrooms. non structural work. | $28,000 |
| Jul 20, 2006 | Completed final sign-off Aug 2006 | 368 Connecticut St | remodel upstairs bath, remove existing toilet, sink,vanity and tub. change out as new. add new vinyl floor, toilet, vanity,sink,shower in exist bath area. no structural to be done. flourcescent lightingDetails
remodel upstairs bath, remove existing toilet, sink,vanity and tub. change out as new. add new vinyl floor, toilet, vanity,sink,shower in exist bath area. no structural to be done. flourcescent lighting | $4,000 |
| May 9, 2000 | Completed final sign-off Dec 2000 | 1100 Montgomery St | remodel existing 5 kitchens,5 baths incl new copper pipes & elec, repair dryrot at back stairsDetails
remodel existing 5 kitchens,5 baths incl new copper pipes & elec, repair dryrot at back stairs | $125,000 |