Back to kitchen remodel contractors
Heinz Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Dec 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 271 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2012 | Completed final sign-off Apr 2013 | 1594 46th Av | remove kitchen at garage, remove plumbing & electrical at the kitchen. after remove the kitchen, convert back to garage use only.Details
remove kitchen at garage, remove plumbing & electrical at the kitchen. after remove the kitchen, convert back to garage use only. | $1,500 |
| Jan 10, 2011 | Completed final sign-off May 2011 | 222 15th Av | remodel kitchen: change new cabinets, new electrical power & plumbing. remodel job at same location, not change existing. min 50% lighting wattage to be from high efficiency lights. remodel one & a half bathroom. change new tub, faucet, electrical, fan, tiles, plumbing. provide high efficiency lightDetails
remodel kitchen: change new cabinets, new electrical power & plumbing. remodel job at same location, not change existing. min 50% lighting wattage to be from high efficiency lights. remodel one & a half bathroom. change new tub, faucet, electrical, fan, tiles, plumbing. provide high efficiency light | $21,000 |
| Dec 8, 2008 | Completed final sign-off Sep 2009 | 222 15th Av | replace 35 windows on 1st and 2nd floor.kitchen remodel with new counter , cabinets,sink, finishes.bathroom alteration on 1st floor.replace two furnaces in garage.Details
replace 35 windows on 1st and 2nd floor.kitchen remodel with new counter , cabinets,sink, finishes.bathroom alteration on 1st floor.replace two furnaces in garage. | $30,000 |