Heinz Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Dec 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2021 | Completed final sign-off Jan 2022 | 3234 16th St | comply w/ nov #2021184628. repair dry rot at sub-floor at back door.Details
comply w/ nov #2021184628. repair dry rot at sub-floor at back door. | $1,500 |
| Apr 11, 2019 | Completed final sign-off Jul 2019 | 621 Kearny St | relocate (e) prep sink & add new 3-comp sink at (e) market and deli per health department requirementsDetails
relocate (e) prep sink & add new 3-comp sink at (e) market and deli per health department requirements | $3,000 |
| Jul 19, 2012 | Completed final sign-off Apr 2013 | 1594 46th Av | remove kitchen at garage, remove plumbing & electrical at the kitchen. after remove the kitchen, convert back to garage use only.Details
remove kitchen at garage, remove plumbing & electrical at the kitchen. after remove the kitchen, convert back to garage use only. | $1,500 |
| Jun 24, 2011 | Never finaled issued Jun 2011, no final | 224 15th Av | remove the garage old ceiling, install r19 insulation and 5/8" type "x" drywall cover the ceiling and wall.Details
remove the garage old ceiling, install r19 insulation and 5/8" type "x" drywall cover the ceiling and wall. | $6,000 |
| Jan 10, 2011 | Completed final sign-off May 2011 | 222 15th Av | remodel kitchen: change new cabinets, new electrical power & plumbing. remodel job at same location, not change existing. min 50% lighting wattage to be from high efficiency lights. remodel one & a half bathroom. change new tub, faucet, electrical, fan, tiles, plumbing. provide high efficiency lightDetails
remodel kitchen: change new cabinets, new electrical power & plumbing. remodel job at same location, not change existing. min 50% lighting wattage to be from high efficiency lights. remodel one & a half bathroom. change new tub, faucet, electrical, fan, tiles, plumbing. provide high efficiency light | $21,000 |
| Nov 29, 2010 | Never finaled issued Nov 2010, no final | 3234 16th St | remove old concrete at parking lot & install new concrete at the same place. 50ft x 13ft, slope to (e) drainDetails
remove old concrete at parking lot & install new concrete at the same place. 50ft x 13ft, slope to (e) drain | $4,500 |
| Jun 12, 2009 | Completed final sign-off Sep 2009 | 222 15th Av | repair patch front stucco crack & painting. change front door outside of the garage door. 30 linear feet of cracked stucco.Details
repair patch front stucco crack & painting. change front door outside of the garage door. 30 linear feet of cracked stucco. | $7,500 |
| Dec 8, 2008 | Completed final sign-off Sep 2009 | 222 15th Av | replace 35 windows on 1st and 2nd floor.kitchen remodel with new counter , cabinets,sink, finishes.bathroom alteration on 1st floor.replace two furnaces in garage.Details
replace 35 windows on 1st and 2nd floor.kitchen remodel with new counter , cabinets,sink, finishes.bathroom alteration on 1st floor.replace two furnaces in garage. | $30,000 |